Powerhouse 1 & Powerhouse 2 DC Panel Board Replacement, Fort Peck, MT
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- W9128F26RA010
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- Place of performance
- Fort Peck, Montana, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Omaha District is issuing a pre-solicitation notice for the replacement of DC panel boards at Fort Peck, MT's Powerhouse 1 and Powerhouse 2 facilities. The scope includes replacing main 125V DC station board panels, preferred AC panels, emergency lighting panels and transfer switches across both powerhouses, along with relocating and extending feeder wires and replacing concrete bases to accommodate the new equipment. The work also involves extending main feeder wires and replacing the last 20-30 feet of feeder wire due to brittleness concerns from past projects. The formal solicitation is expected to be issued on approximately October 28, 2025, with a mandatory site visit tentatively scheduled for November 12, 2025. The solicitation will close on or about December 1, 2025, with evaluation criteria to be detailed in the formal solicitation.
This procurement opportunity is set aside exclusively for small businesses under the Total Small Business designation, restricting participation to qualifying small business concerns. The contract falls under NAICS code 238210 for Electrical Contractors and Other Wiring Installation Contractors, indicating the specialized electrical work required for this power generation facility maintenance project. Optional work includes replacing the Panel Battery Panel in Powerhouse 1's Battery Charger Room and the Switchyard 2 125V DC Panel adjacent to Powerhouse 2. While the estimated construction costs are mentioned in the notice, the specific dollar amounts are not provided in the available text. The timeline spans approximately two months from solicitation release to proposal submission deadline, with the site visit occurring roughly two weeks before the closing date.
Notice text
THIS IS NOT A FORMAL SOLICITATION. This announcement constitutes a PRE-SOLICITATION notice IAW FAR Subpart 5.2.
On or about 28 October 2025, the U.S. Army Corps of Engineers, Omaha District intends to issue a solicitation for the “Powerhouse 1 & Powerhouse 2 DC Panel Board Replacement” project. The solicitation will close on or about 1 December 2025. The solicitation is restricted to Small Business.
Project Description: Scope of project includes all work required to:
1. Replace the entire line-up in Powerhouse 1 and Powerhouse 2
Powerhouse 1:
- Replace the Main 125V DC Station Board Panel (including all DC and preferred AC).
- Replace the Preferred AC Panel (located in the same location as the DC Station Board).
- Replace the Emergency Lighting Panel & Associated Emergency Lighting Panel Transfer Switch (EM Panel in the stairway, transfer switch located in the Cubicle Room).
Powerhouse 2:
- Replace the Main 125V DC Station Board Panel (including all DC and preferred AC).
- Replace the Preferred AC Panel (located in the same location as the DC Station Board).
- Replace four Emergency Lighting Transfer Switches.
2. Relocate and extend feeder wires as necessary.
- Extend main feeder wires for the new panels and terminal blocks as required. Due to brittleness in past projects, replace the last 20 to 30 feet of feeder wire to new terminal blocks below deck.
3. Replace and extend concrete bases:
- Extend and paint or tile concrete bases to accommodate new, wider replacements.
Optional Work
1. Powerhouse 1:
Option 1: Replace the Panel Battery Panel (BP), located in the Powerhouse 1 Battery Charger Room.
2. Powerhouse 2:
Option 2: Replace the Switchyard 2 125 V DC Panel, located in Switchyard 2 (adjacent to Powerhouse 2).
Site Visit:
A Site Visit will be scheduled and additional information regarding the site visit will be provided in the solicitation via FAR Clause 52.236-27. The site visit is tentatively scheduled for 12 November 2025.
Estimated Construction Costs:
The estimated construction cost of this project is between $1,000,000 and $5,000,000.
NAICS Code:
The Primary North American Industry Classification System (NAICS) code anticipated for solicitation is 238210 – Electrical Contractors and Other Wiring Installation, with a size standard for Small Business of $19M.
Place of Performance:
Fort Peck Dam, Montana
Contracting Office Address:
USACE Omaha District
1616 Capital Ave, Omaha, NE 68102-4901
Point Of Contact:
All questions regarding this Pre-Solicitation should be made to the Contract Specialist.
Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be up-dated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via Federal Business Opportunities (FedBizOpps) (www.fbo.gov). Registration is required to access solicitation documents. Federal Business Opportunities provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Powerhouse 1 and 2 DC Panel Board Replacement | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| FTG247 Replace UPS at IDT1, Fort Greely, Alaska | ENDIST Alaska | Total Small Business | |
| Webbers Falls Excitation System Replacements | ENDIST Tulsa | No set-aside | |
| Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT | ENDIST New England | Total Small Business | |
| TDA Isolated Phase Bus and Duct Inspection | ENDIST Portland | No set-aside | |
| Tenkiller Hydropower Excitation System Replacement | ENDIST Tulsa | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity