About this opportunity

The U.S. Army Corps of Engineers, Omaha District, is soliciting proposals for the comprehensive replacement of electrical equipment across Powerhouse 1 and Powerhouse 2 at Fort Peck Dam. The project encompasses replacement of Main 125V DC Station Boards, Preferred AC Panels, Emergency Lighting Panels, and associated Transfer Switches, along with extension of main feeder wires by 20-30 feet and modification of existing concrete bases to accommodate new, wider replacement equipment. Contractors must meet the qualifications under NAICS code 238210 (Electrical Contractors and Other Wiring Installation Contractors), with a small business size standard of $19 million in annual revenues. The evaluation will be conducted using a best value tradeoff approach with three factors: Technical Approach (most important), Past Performance (second most important), and Price (least important). The original solicitation deadline of December 19, 2025, was extended through three amendments to January 22, 2026, at 2:00 PM CST, with the fourth amendment issued on January 13, 2026, updating the Davis Bacon Wage Determination.

This is a 100% Small Business set-aside solicitation with no identified incumbent contractor. The estimated construction cost ranges from $1,000,000 to $5,000,000, with base scope and optional work items related to additional panel replacements in the Battery Charger Room and Switchyard 2. The contractor must commence work immediately upon contract award and complete all work within 548 calendar days after receipt of the Notice to Proceed, with mandatory performance and payment bonds required within 10 calendar days. The work will be performed at Fort Peck, Montana, and is subject to prevailing wage requirements under the Davis Bacon Act, with current wage rates effective as of January 2026. A mandatory site visit was held on November 19, 2025, with multiple construction firms in attendance to evaluate project requirements and site conditions.

Notice text

5 versions

Update #5 · Latest ·

Amendment 0004 issued updated Davis Bacon Wage Determination.

************************************************************************

Amendment 0003 issued extending the proposal due date to 22 January 2026.

************************************************************************

Amendment 0002 issued to revise Specs in Attachment 4 AM 0002

************************************************************************

Amendment 0001 issued extending the proposal due date to 16 January 2026. 

************************************************************************

The U.S. Army Corps of Engineers, Omaha District, hereby announces the solicitation for “Powerhouse 1 and 2 DC Panel Board Replacement”. The solicitation will close on 19 December 2025. The solicitation is 100% Small Business set-aside.
Site Visit:
A Site Visit is scheduled and additional information regarding the site visit is provided in the solicitation in Section
00 21 00. The site visit is scheduled for 19 November 2025.
Project Description:
This project involves the comprehensive replacement of specified electrical equipment across Powerhouse 1 and Powerhouse 2. The base scope for Powerhouse 1 includes the Main 125V DC Station Board, the Preferred AC Panel, and the Emergency Lighting Panel along with its associated Emergency Lighting Panel Transfer Switch. For Powerhouse 2, the base scope covers the Main 125V DC Station Board, the Preferred AC Panel, and four Emergency Lighting Transfer Switches. Key considerations for this project include the necessary extension of main feeder wires by 20-30 feet to connect to the new panels, which will involve replacing brittle sections below deck, and the extension and finishing of existing concrete bases to accommodate the new, wider replacement equipment. The Contractor will be required to commence work upon receipt of contract award and complete the work 548
calendar days after receipt of Notice to Proceed, this is subject to change after solicitation issuance.
Estimated Construction Costs:
The estimated construction cost of this project is between $1,000,000 and $5,000,000.
NAICS Code:
The Primary North American Industry Classification System (NAICS) code for this solicitation is 238210 – Electrical Contractors and Other Wiring Installation Contractors, with a size standard for Small Business of $19M.
Obtaining Solicitation Documents:
Solicitation documents are posted to the web via SAM.gov (sam.gov).
Find solicitation announcement in SAM.gov (sam.gov).

  1. Use the ‘All Award Data' to locate the project (by entering the solicitation number.)
  2. By using the ‘login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted.
  3. Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the left side reading ‘Attachments/Links’.

Contracting Office Address:
USACE Omaha District
1616 Capital Ave, Omaha, NE 68102-4901
Point Of Contact:
All questions shall be submitted on ProjNet (ProjNet access, and additional guidance are contained within the
solicitation).
Place of Performance:
Fort Peck Dam
Fort Peck, MT 59223


Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM)
database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual
Representations and Certifications on SAM. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov (sam.gov). Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments.

Update #4 ·

Amendment 0003 issued extending the proposal due date to 22 January 2026.

************************************************************************

Amendment 0002 issued to revise Specs in Attachment 4 AM 0002

************************************************************************

Amendment 0001 issued extending the proposal due date to 16 January 2026. 

************************************************************************

The U.S. Army Corps of Engineers, Omaha District, hereby announces the solicitation for “Powerhouse 1 and 2 DC Panel Board Replacement”. The solicitation will close on 19 December 2025. The solicitation is 100% Small Business set-aside.
Site Visit:
A Site Visit is scheduled and additional information regarding the site visit is provided in the solicitation in Section
00 21 00. The site visit is scheduled for 19 November 2025.
Project Description:
This project involves the comprehensive replacement of specified electrical equipment across Powerhouse 1 and Powerhouse 2. The base scope for Powerhouse 1 includes the Main 125V DC Station Board, the Preferred AC Panel, and the Emergency Lighting Panel along with its associated Emergency Lighting Panel Transfer Switch. For Powerhouse 2, the base scope covers the Main 125V DC Station Board, the Preferred AC Panel, and four Emergency Lighting Transfer Switches. Key considerations for this project include the necessary extension of main feeder wires by 20-30 feet to connect to the new panels, which will involve replacing brittle sections below deck, and the extension and finishing of existing concrete bases to accommodate the new, wider replacement equipment. The Contractor will be required to commence work upon receipt of contract award and complete the work 548
calendar days after receipt of Notice to Proceed, this is subject to change after solicitation issuance.
Estimated Construction Costs:
The estimated construction cost of this project is between $1,000,000 and $5,000,000.
NAICS Code:
The Primary North American Industry Classification System (NAICS) code for this solicitation is 238210 – Electrical Contractors and Other Wiring Installation Contractors, with a size standard for Small Business of $19M.
Obtaining Solicitation Documents:
Solicitation documents are posted to the web via SAM.gov (sam.gov).
Find solicitation announcement in SAM.gov (sam.gov).

  1. Use the ‘All Award Data' to locate the project (by entering the solicitation number.)
  2. By using the ‘login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted.
  3. Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the left side reading ‘Attachments/Links’.

Contracting Office Address:
USACE Omaha District
1616 Capital Ave, Omaha, NE 68102-4901
Point Of Contact:
All questions shall be submitted on ProjNet (ProjNet access, and additional guidance are contained within the
solicitation).
Place of Performance:
Fort Peck Dam
Fort Peck, MT 59223


Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM)
database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual
Representations and Certifications on SAM. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov (sam.gov). Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments.

Update #3 ·

Amendment 0002 issued to revise Specs in Attachment 4 AM 0002

************************************************************************

Amendment 0001 issued extending proposal due date to 16 January 2026. 

************************************************************************

The U.S. Army Corps of Engineers, Omaha District, hereby announces the solicitation for “Powerhouse 1 and 2 DC Panel Board Replacement”. The solicitation will close on 19 December 2025. The solicitation is 100% Small Business set-aside.
Site Visit:
A Site Visit is scheduled and additional information regarding the site visit is provided in the solicitation in Section
00 21 00. The site visit is scheduled for 19 November 2025.
Project Description:
This project involves the comprehensive replacement of specified electrical equipment across Powerhouse 1 and Powerhouse 2. The base scope for Powerhouse 1 includes the Main 125V DC Station Board, the Preferred AC Panel, and the Emergency Lighting Panel along with its associated Emergency Lighting Panel Transfer Switch. For Powerhouse 2, the base scope covers the Main 125V DC Station Board, the Preferred AC Panel, and four Emergency Lighting Transfer Switches. Key considerations for this project include the necessary extension of main feeder wires by 20-30 feet to connect to the new panels, which will involve replacing brittle sections below deck, and the extension and finishing of existing concrete bases to accommodate the new, wider replacement equipment. The Contractor will be required to commence work upon receipt of contract award and complete the work 548
calendar days after receipt of Notice to Proceed, this is subject to change after solicitation issuance.
Estimated Construction Costs:
The estimated construction cost of this project is between $1,000,000 and $5,000,000.
NAICS Code:
The Primary North American Industry Classification System (NAICS) code for this solicitation is 238210 – Electrical Contractors and Other Wiring Installation Contractors, with a size standard for Small Business of $19M.
Obtaining Solicitation Documents:
Solicitation documents are posted to the web via SAM.gov (sam.gov).
Find solicitation announcement in SAM.gov (sam.gov).

  1. Use the ‘All Award Data' to locate the project (by entering the solicitation number.)
  2. By using the ‘login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted.
  3. Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the left side reading ‘Attachments/Links’.

Contracting Office Address:
USACE Omaha District
1616 Capital Ave, Omaha, NE 68102-4901
Point Of Contact:
All questions shall be submitted on ProjNet (ProjNet access, and additional guidance are contained within the
solicitation).
Place of Performance:
Fort Peck Dam
Fort Peck, MT 59223


Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM)
database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual
Representations and Certifications on SAM. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov (sam.gov). Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments.

Update #2 ·

Amendment 0001 issued extending proposal due date to 16 January 2026. 

************************************************************************

The U.S. Army Corps of Engineers, Omaha District, hereby announces the solicitation for “Powerhouse 1 and 2 DC Panel Board Replacement”. The solicitation will close on 19 December 2025. The solicitation is 100% Small Business set-aside.
Site Visit:
A Site Visit is scheduled and additional information regarding the site visit is provided in the solicitation in Section
00 21 00. The site visit is scheduled for 19 November 2025.
Project Description:
This project involves the comprehensive replacement of specified electrical equipment across Powerhouse 1 and Powerhouse 2. The base scope for Powerhouse 1 includes the Main 125V DC Station Board, the Preferred AC Panel, and the Emergency Lighting Panel along with its associated Emergency Lighting Panel Transfer Switch. For Powerhouse 2, the base scope covers the Main 125V DC Station Board, the Preferred AC Panel, and four Emergency Lighting Transfer Switches. Key considerations for this project include the necessary extension of main feeder wires by 20-30 feet to connect to the new panels, which will involve replacing brittle sections below deck, and the extension and finishing of existing concrete bases to accommodate the new, wider replacement equipment. The Contractor will be required to commence work upon receipt of contract award and complete the work 548
calendar days after receipt of Notice to Proceed, this is subject to change after solicitation issuance.
Estimated Construction Costs:
The estimated construction cost of this project is between $1,000,000 and $5,000,000.
NAICS Code:
The Primary North American Industry Classification System (NAICS) code for this solicitation is 238210 – Electrical Contractors and Other Wiring Installation Contractors, with a size standard for Small Business of $19M.
Obtaining Solicitation Documents:
Solicitation documents are posted to the web via SAM.gov (sam.gov).
Find solicitation announcement in SAM.gov (sam.gov).

  1. Use the ‘All Award Data' to locate the project (by entering the solicitation number.)
  2. By using the ‘login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted.
  3. Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the left side reading ‘Attachments/Links’.

Contracting Office Address:
USACE Omaha District
1616 Capital Ave, Omaha, NE 68102-4901
Point Of Contact:
All questions shall be submitted on ProjNet (ProjNet access, and additional guidance are contained within the
solicitation).
Place of Performance:
Fort Peck Dam
Fort Peck, MT 59223


Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM)
database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual
Representations and Certifications on SAM. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov (sam.gov). Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments.

Update #1 ·

The U.S. Army Corps of Engineers, Omaha District, hereby announces the solicitation for “Powerhouse 1 and 2 DC Panel Board Replacement”. The solicitation will close on 19 December 2025. The solicitation is 100% Small Business set-aside.
Site Visit:
A Site Visit is scheduled and additional information regarding the site visit is provided in the solicitation in Section
00 21 00. The site visit is scheduled for 19 November 2025.
Project Description:
This project involves the comprehensive replacement of specified electrical equipment across Powerhouse 1 and Powerhouse 2. The base scope for Powerhouse 1 includes the Main 125V DC Station Board, the Preferred AC Panel, and the Emergency Lighting Panel along with its associated Emergency Lighting Panel Transfer Switch. For Powerhouse 2, the base scope covers the Main 125V DC Station Board, the Preferred AC Panel, and four Emergency Lighting Transfer Switches. Key considerations for this project include the necessary extension of main feeder wires by 20-30 feet to connect to the new panels, which will involve replacing brittle sections below deck, and the extension and finishing of existing concrete bases to accommodate the new, wider replacement equipment. The Contractor will be required to commence work upon receipt of contract award and complete the work 548
calendar days after receipt of Notice to Proceed, this is subject to change after solicitation issuance.
Estimated Construction Costs:
The estimated construction cost of this project is between $1,000,000 and $5,000,000.
NAICS Code:
The Primary North American Industry Classification System (NAICS) code for this solicitation is 238210 – Electrical Contractors and Other Wiring Installation Contractors, with a size standard for Small Business of $19M.
Obtaining Solicitation Documents:
Solicitation documents are posted to the web via SAM.gov (sam.gov).
Find solicitation announcement in SAM.gov (sam.gov).

  1. Use the ‘All Award Data' to locate the project (by entering the solicitation number.)
  2. By using the ‘login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted.
  3. Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the left side reading ‘Attachments/Links’.

Contracting Office Address:
USACE Omaha District
1616 Capital Ave, Omaha, NE 68102-4901
Point Of Contact:
All questions shall be submitted on ProjNet (ProjNet access, and additional guidance are contained within the
solicitation).
Place of Performance:
Fort Peck Dam
Fort Peck, MT 59223


Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM)
database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual
Representations and Certifications on SAM. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov (sam.gov). Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments.

Files

Show all 14

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Powerhouse 1 & Powerhouse 2 DC Panel Board Replacement, Fort Peck, MT Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Pre-Solicitation Notice: Excitation System Replacement, Beaver Dam, White River Basin, Carroll County, Arkansas Beaver Dam, White River Basin, Carroll County, Arkansas 72631 · NAICS 335312 ENDIST Little Rock Total Small Business
FTG247 Replace UPS at IDT1, Fort Greely, Alaska Fort Greely, Alaska 99731, United States · NAICS 237130 ENDIST Alaska Total Small Business
Dike B Generator Installation, Mansfield Hollow Dam, Mansfield Center, CT Mansfield Center, Connecticut, United States · NAICS 238290 ENDIST New England Total Small Business
TDA Isolated Phase Bus and Duct Inspection The Dalles Dam in The Dalles, Oregon. Access to The Dalles Dam is from I-84 Exit 88 97058 · NAICS 541380 ENDIST Portland No set-aside
Bgndrf piping upgrades NAICS 237110 Bureau of Reclamation Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity