Post Remedial Action Maintenance- Drury Gulch
Closed Solicitation Posted
- Solicitation number
- W911KB21R0055
- Agency
-
ENDIST Alaska
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 562910 Remediation Services
- Place of performance
- Kodiak, Alaska 99615, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks post remedial action maintenance services at the Kodiak Drury Gulch former used defense site in Alaska. The contractor will clear accumulated sediment from a 450-foot long culvert, remove sediment and vegetation from upper and lower stilling basins, and provide engineered design criteria for future creek diversion improvements. Evaluation will be based on technical approach, schedule, and price. Proposals are due by August 31, 2021 at 5:00 PM.
The solicitation is set aside for total small business and has a place of performance in Kodiak, Alaska. The NAICS code is 562910 and PSC code R499. The period of performance ends June 1, 2023. Pricing will be on a firm-fixed-price basis for mobilization and stilling basin material removal line items. The Army Corps of Engineers Engineering District Alaska is the contracting agency overseeing the maintenance services at the Drury Gulch site.
Notice text
5 versions
Update #5 · Latest ·
The Contractor shall, in accordance with the terms and conditions set forth below, furnish all labor, management, facilities, supplies, equipment, transportation, and material (other than those to be furnished by the Government), and do all things necessary for, or incidental to, performance of the work as set forth below. The Contractor shall furnish to the Government reports and other data together with supporting material developed during the period of service. During the prosecution of the work, the Contractor shall provide adequate professional supervision and quality control to assure the accuracy, quality, completeness, and progress of the work.
The main objectives in this Scope of Work (SOW) are to perform post remedial action maintenance for the Kodiak Drury Gulch former used defense site (Drury Gulch), to include:
1. Clear accumulated sediment from inside the Drury Gulch Creek Diversion Culvert. The culvert is 450 feet long, 15-inches in diameter, and currently 80% clogged.
2. Remove sediment and vegetation accumulated in the upper and lower stilling basins so that the riprap is visible and functioning as intended.
3. Provide engineered design criteria for future improvements to the Drury Gulch Creek Diversion.
UPDATED- 18 August 2021
-Amendment 001 has been uploaded, please see attached.
-For requesting GFI, please send Ron Perry the POC that you would like to receive all GFI documentation.
UPDATED- 24 August 2021
-Amendment 002 has been uploaded, please see attached.
UPDATED- 30 AUGUST 2021
- Amendment 003 has been uploaded, please see attached.
-Amendment 004 has been uploaded, please see attached.
*Reminder, please include a copy of all amendments signed when submitting proposals*
Update #4 ·
The Contractor shall, in accordance with the terms and conditions set forth below, furnish all labor, management, facilities, supplies, equipment, transportation, and material (other than those to be furnished by the Government), and do all things necessary for, or incidental to, performance of the work as set forth below. The Contractor shall furnish to the Government reports and other data together with supporting material developed during the period of service. During the prosecution of the work, the Contractor shall provide adequate professional supervision and quality control to assure the accuracy, quality, completeness, and progress of the work.
The main objectives in this Scope of Work (SOW) are to perform post remedial action maintenance for the Kodiak Drury Gulch former used defense site (Drury Gulch), to include:
1. Clear accumulated sediment from inside the Drury Gulch Creek Diversion Culvert. The culvert is 450 feet long, 15-inches in diameter, and currently 80% clogged.
2. Remove sediment and vegetation accumulated in the upper and lower stilling basins so that the riprap is visible and functioning as intended.
3. Provide engineered design criteria for future improvements to the Drury Gulch Creek Diversion.
UPDATED- 18 August 2021
-Amendment 001 has been uploaded, please see attached.
-For requesting GFI, please send Ron Perry the POC that you would like to receive all GFI documentation.
UPDATED- 24 August 2021
-Amendment 002 has been uploaded, please see attached.
UPDATED- 30 AUGUST 2021
- Amendment 003 has been uploaded, please see attached.
Update #3 ·
The Contractor shall, in accordance with the terms and conditions set forth below, furnish all labor, management, facilities, supplies, equipment, transportation, and material (other than those to be furnished by the Government), and do all things necessary for, or incidental to, performance of the work as set forth below. The Contractor shall furnish to the Government reports and other data together with supporting material developed during the period of service. During the prosecution of the work, the Contractor shall provide adequate professional supervision and quality control to assure the accuracy, quality, completeness, and progress of the work.
The main objectives in this Scope of Work (SOW) are to perform post remedial action maintenance for the Kodiak Drury Gulch former used defense site (Drury Gulch), to include:
1. Clear accumulated sediment from inside the Drury Gulch Creek Diversion Culvert. The culvert is 450 feet long, 15-inches in diameter, and currently 80% clogged.
2. Remove sediment and vegetation accumulated in the upper and lower stilling basins so that the riprap is visible and functioning as intended.
3. Provide engineered design criteria for future improvements to the Drury Gulch Creek Diversion.
UPDATED- 18 August 2021
-Amendment 001 has been uploaded, please see attached.
-For requesting GFI, please send Ron Perry the POC that you would like to receive all GFI documentation.
UPDATED- 24 August 2021
-Amendment 002 has been uploaded, please see attached.
Update #2 ·
The Contractor shall, in accordance with the terms and conditions set forth below, furnish all labor, management, facilities, supplies, equipment, transportation, and material (other than those to be furnished by the Government), and do all things necessary for, or incidental to, performance of the work as set forth below. The Contractor shall furnish to the Government reports and other data together with supporting material developed during the period of service. During the prosecution of the work, the Contractor shall provide adequate professional supervision and quality control to assure the accuracy, quality, completeness, and progress of the work.
The main objectives in this Scope of Work (SOW) are to perform post remedial action maintenance for the Kodiak Drury Gulch former used defense site (Drury Gulch), to include:
1. Clear accumulated sediment from inside the Drury Gulch Creek Diversion Culvert. The culvert is 450 feet long, 15-inches in diameter, and currently 80% clogged.
2. Remove sediment and vegetation accumulated in the upper and lower stilling basins so that the riprap is visible and functioning as intended.
3. Provide engineered design criteria for future improvements to the Drury Gulch Creek Diversion.
UPDATED- 18 August 2021
-Amendment 001 has been uploaded, please see attached.
-For requesting GFI, please send Ron Perry the POC that you would like to receive all GFI documentation.
Update #1 ·
The Contractor shall, in accordance with the terms and conditions set forth below, furnish all labor, management, facilities, supplies, equipment, transportation, and material (other than those to be furnished by the Government), and do all things necessary for, or incidental to, performance of the work as set forth below. The Contractor shall furnish to the Government reports and other data together with supporting material developed during the period of service. During the prosecution of the work, the Contractor shall provide adequate professional supervision and quality control to assure the accuracy, quality, completeness, and progress of the work.
The main objectives in this Scope of Work (SOW) are to perform post remedial action maintenance for the Kodiak Drury Gulch former used defense site (Drury Gulch), to include:
1. Clear accumulated sediment from inside the Drury Gulch Creek Diversion Culvert. The culvert is 450 feet long, 15-inches in diameter, and currently 80% clogged.
2. Remove sediment and vegetation accumulated in the upper and lower stilling basins so that the riprap is visible and functioning as intended.
3. Provide engineered design criteria for future improvements to the Drury Gulch Creek Diversion.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity