Poplar Island, 2019 Expansion Structures, Talbot County, MD

Awarded Award Notice Posted

Solicitation number
W912DR19B0009
Agency
ENDIST Baltimore US Army Corps of Engineers, Department of Defense
Awarded
to Mclean Contracting Company
Set-aside
No set-aside

Opportunity facts

Contract number
W912DR19C0034 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Poplar Island Talbot County, Maryland, United States

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

Awarded Vendors: MCLEAN CONTRACTING COMPANY. Contract Award Dollar Amount: $4,444,444.00. Contract Award Date: 2019-09-03.

Update #5 ·

AMENDMENT 0002 ATTACHED..

Update #4 ·

PLEASE EMAIL PATRICIA.MORROW@USACE.ARMY.MIL TO RECEIVE A COPY OF THE PLANS AND SPECIFICATIONS.
.

Update #3 ·

SOLICIATION NO. W912DR19B0019: Poplar Island, 2019 Expansion Structures, Talbot County, MD

This is an Invitation for Bid (IFB) for a Design-Bid-Build Construction Contract to continue construction on the lateral expansion of Poplar Island. Poplar Island is located in the Chesapeake Bay between Jefferson and Coaches Islands, and is approximately 20 minutes (by boat) northwest of Tilghman Island. The 2019 Expansion Structures project involves the construction of two combination spillway/inlet structures for Poplar Island expansion wetland cells 7 and 9.


The Magnitude of Construction is between $1,000,000.00 and $5,000,000.00. The Construction duration is approximately 300 calendar days.


The North American Industry Classification System code for this procurement is 237990 which has a small business size standard of $36,500,000. This will be an unrestricted procurement.


The Government will require a contractor to provide all labor, material and equipment to construct two combined spillway inlet structures at Poplar Island, Spillway 17 and Spillway 19. Construction work for Spillway 17 will take place primarily along the northern boundary of existing wetland Cell 7; construction work for Spillway 19 will take place primarily along the western boundary of wetland Cell 9. See Enclosure 1 - Project Map for spillway locations. Work consists of building a sheet pile cofferdam, removing 350-lb armor stone, removing dike fill material, constructing an impervious earth cutoff blanket, placing the precast culverts on the specified subgrade and base, constructing the spillway structure and wing walls, and replacing the dike fill and armor stone. The spillway structures will consist of a pair of 6 ft. by 6 ft. box culverts approximately 27 feet in length with wing walls. Each structure also includes a steel platform and a sluice gate. The depth of water at both locations is approximately 10-12 feet.



The Site Visit will be held on 01 July 2019. The boat will depart the project land base (located at 21548 Chicken Point Road, Tilghman, MD 21671) at 1000. All prospective bidders are required to contact USACE Project Engineer Catherine Perkins at 410-336-0648 to confirm attendance.

Added: Jun 20, 2019 1:52 pm Modified: Jun 20, 2019 3:43 pmTrack Changes PLEASE EMAIL PATRICIA.MORROW@USACE.ARMY.MIL TO RECEIVE A COPY OF THE SPECIFICATIONS.
.

Update #2 ·

PLEASE EMAIL PATRICIA.MORROW@USACE.ARMY.MIL TO RECEIVE A COPY OF THE SPECIFICATIONS..

Update #1 ·

SOLICIATION NO. W912DR19B0019: Poplar Island, 2019 Expansion Structures, Talbot County, MD

This is an Invitation for Bid (IFB) for a Design-Bid-Build Construction Contract to continue construction on the lateral expansion of Poplar Island. Poplar Island is located in the Chesapeake Bay between Jefferson and Coaches Islands, and is approximately 20 minutes (by boat) northwest of Tilghman Island. The 2019 Expansion Structures project involves the construction of two combination spillway/inlet structures for Poplar Island expansion wetland cells 7 and 9.


The Magnitude of Construction is between $1,000,000.00 and $5,000,000.00. The Construction duration is approximately 300 calendar days.


The North American Industry Classification System code for this procurement is 237990 which has a small business size standard of $36,500,000. This will be an unrestricted procurement.


The Government will require a contractor to provide all labor, material and equipment to construct two combined spillway inlet structures at Poplar Island, Spillway 17 and Spillway 19. Construction work for Spillway 17 will take place primarily along the northern boundary of existing wetland Cell 7; construction work for Spillway 19 will take place primarily along the western boundary of wetland Cell 9. See Enclosure 1 - Project Map for spillway locations. Work consists of building a sheet pile cofferdam, removing 350-lb armor stone, removing dike fill material, constructing an impervious earth cutoff blanket, placing the precast culverts on the specified subgrade and base, constructing the spillway structure and wing walls, and replacing the dike fill and armor stone. The spillway structures will consist of a pair of 6 ft. by 6 ft. box culverts approximately 27 feet in length with wing walls. Each structure also includes a steel platform and a sluice gate. The depth of water at both locations is approximately 10-12 feet.

.

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Poplar Island, 2019 Expansion Structures, Talbot County, MD This notice · Award Award Notice
Poplar Island, 2019 Expansion Structures, Talbot County, MD Latest pre-solicitation Pre-Solicitation
Poplar Island, 2019 Expansion Structures, Talbot County, MD Pre-Solicitation
Poplar Island, 2019 Expansion Structures, Talbot County, MD Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity