This is a firm-fixed price construction contract awarded by the U.S. Army Corps of Engineers to Marine Technologies, Inc., a Maryland-based small business. The contract, valued at $896,400.00, is for modifications to the Spillway #1 structure at Poplar Island in the Chesapeake Bay, including raising the existing structure, slip lining the discharge pipes, demolishing two steel structures, and plugging three existing spillway structures. The original solicitation was a sources sought notice to...
This is a $8,628,509.55 firm-fixed-price definitive contract awarded by the U.S. Army Corps of Engineers to Norfolk Dredging Company, a for-profit organization, for the Poplar Island Expansion Sand Stockpile 2016 project in Talbot County, Maryland. The work involves the hydraulic dredging of up to 1,350,000 cubic yards of sandy material from borrow areas near Poplar Island and placing it on the island in Cells 1D and 4C. The contract has a period of performance of approximately 400 calendar...
This firm-fixed-price construction contract was awarded by the U.S. Army Corps of Engineers, Baltimore District to Lindstrom Excavating Contractors, Inc. for the Poplar Island Cell 6 and Cell 11 Dike Raisings project in Talbot County, Maryland. The contract has a ceiling value of $8,900,435.00 and a completion date of November 8, 2025. The project involves using approximately 300,000 cubic yards of stockpiled sand to raise two existing containment cell dikes on Poplar Island, an ecosystem...
This firm-fixed-price construction contract was awarded by the U.S. Army Corps of Engineers (USACE), Baltimore District to Joint Forces Construction, L.L.C., a self-certified small disadvantaged, veteran-owned, and service-disabled veteran-owned business. The $1,395,030.00 contract is for the Fiscal Year 2023 Poplar Island Spillway Rehabilitation project in Talbot County, Maryland. The work involves slip lining pipes, structural repairs, and abandonment of unused spillway structures at the...
The U.S. Army Corps of Engineers, Baltimore District awarded a $2.2 million firm fixed price contract to New Dominion Construction LLC of Sherwood, Maryland. The contract is for repairs to the tidal inlet area at Poplar Island Cell 1C in Talbot County, Maryland. Work will include removing four failing wingwalls, installing sheet piling along dike slopes, repairing dikes and roads, and replacing existing guardrails. The repairs must be completed within 180 days in accordance with the...
This is a firm-fixed-price construction contract awarded by the U.S. Army Corps of Engineers, Baltimore District to Precon Marine Inc. for the Poplar Island Lateral Extension project. The contract has a ceiling value of $28,141,120.09 and a completion date of December 6, 2017. The work involves foundation preparation, dike construction, and dredging for the lateral expansion of Poplar Island in the Chesapeake Bay. The contract was not set aside for any small business program. Precon Marine...
This is a $947,100.00 firm fixed price definitive contract awarded by the U.S. Army Corps of Engineers, Baltimore District (USACE Baltimore) to N-Powell Company, Inc., an 8(a) certified small disadvantaged minority-owned and woman-owned business, for ecosystem restoration work at Poplar Island in Talbot County, Maryland. The project is part of the Recovery Act, a federal program intended to provide economic stimulus in the wake of the late-2000s recession. The contract has a completion date of...
This is a definitive $34,747,852.36 fixed-price contract awarded by the U.S. Army Corps of Engineers to H & L Contracting LLC, a for-profit partnership that provides dredging, coastal infrastructure construction, and erosion control services. The contract is for the Poplar Island Lateral Expansion, Contract 3, located in Talbot County, Maryland. There was no set-aside designation for this award, which was funded through the Corps of Engineers' civil works program. H & L Contracting has...
This contract, awarded by the U.S. Army Corps of Engineers Baltimore District, is for the 2018 Poplar Island Sand Stockpile Project. The $13,694,163.88 definitive contract, with a firm fixed-price pricing type, was awarded on February 27, 2018 to Cottrell Contracting Corporation, a self-certified small disadvantaged business. The project involves dredging, transportation, and placement of sand to support shoreline and habitat restoration efforts at Poplar Island, Maryland. Cottrell Contracting...
<p>This is a definitive contract awarded by the U.S. Army Corps of Engineers to The Wesson Group, LLC, a for-profit subchapter S corporation, for the Poplar Island Lateral Expansion Contract 2 project in Talbot County, Maryland. The contract was awarded on September 19, 2017 and has a potential value of $51,074,881.79, with a completion date of July 20, 2019. The contract is a firm fixed-price arrangement, and there was no set-aside used. The place of performance is Easton, Maryland.</p>
The U.S. Army Corps of Engineers (USACE), Baltimore District, awarded a firm-fixed-price contract valued at $5,864,280.03 to McLean Contracting Company for the construction of two combination spillway/inlet structures for the Poplar Island expansion project in Talbot County, Maryland. The 300-calendar-day construction contract, which does not utilize any set-aside designations, is for the creation of Spillway 17 and Spillway 19 as part of the expansion of wetland Cells 7 and 9 on Poplar Island in the Chesapeake Bay. The work includes building a sheet pile cofferdam, removing and replacing dike fill material and armor stone, and constructing the precast concrete culvert structures and associated wing walls and steel platforms. This contract award is part of the USACE's ongoing efforts to expand the Poplar Island environmental restoration project.