Poplar-2019ExpansionStructures-Pre-Bid_Overview.pdf
PDF 3 MB Posted
- Attached to
- Poplar Island, 2019 Expansion Structures, Talbot County, MD Federal contract opportunity
- Solicitation number
- W912DR19B0009
About this file
PRE BID OVERVIEW POWERPOINT
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912DR19B0009_BID_ABSTRACT_072519.pdf | ||
| W912DR19B0009_Amendment_0002_071219.pdf | ||
| Pre-Bid_SignIn-1July2019.jpg | JPG image | |
| W912DR19B0009_AMENDMENT_0001_070119.pdf | ||
| W912DR19B0009_POPLAR_ISLAND_2019_EXPANSION_STRUCTURES_SOLICITATION.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
.59
“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”
Poplar Island, 2019 Expansion Structures Project Overview for Pre-Bid Site Visit 1 July 2019
PAUL S. SARBANES
ECOSYSTEM RESTORATION
PROJECT AT POPLAR ISLAND
PRESENTATION OBJECTIVES
Poplar Expansion Overview
2019 Expansion Structures Scope
Requests For Information Process
Solicitation Schedule
POPLAR - PLAN FEATURE MAP
PHASE I
(EXISTING)
PHASE II
(EXISTING)
VERTICAL EXPANSION
(CELL 2 RAISING)
LATERAL
EXPANSION
(UNDERWAY)
VERTICAL EXPANSION
(CELL 6 RAISING)
ONGOING EXPANSION PROGRESS
Image taken 26 March 2019
2019 EXPANSION STRUCTURES – SCOPE
SHEET GI002
2019 EXPANSION STRUCTURES – SCOPE
SHEET GI901
72019 EXPANSION STRUCTURES – SCOPE
SHEET C-101
82019 EXPANSION STRUCTURES – SCOPE
SHEET C-501
9BID SCHEDULE
REQUESTS FOR INFORMATION
(RFI) PROCESS
All Questions Must Be Submitted through ProjNet www.projnet.org
Directions in Solicitation, pg 6 RFI Deadline is Friday 5 July @ 1000 http://www.projnet.org/
2019 EXPANSION STRUCTURES SCHEDULE
SCHEDULE*
Solicitation 20 June 2019 Pre-Bid Site Visit 1 July 2019 RFI Deadline 5 July 2019 @ 10am EST Bid Opening 16 July 2019 @ 11am EST *Schedule as of 1 July 2019
300 Day Duration = Fall 2019 to Summer 2020
CONCURRENT POPLAR CONSTRUCTION
Lateral CT 3 through July 2020
Dredged Material Inflow Winter 2019/2020
MES Spillway Operations Ongoing
Rock Reefs Early 2020?
Lateral CT 2 To Be Completed
Summer 2019
THANK YOU FOR ATTENDING
SITE VISIT:
Cell 7 Cell 9 Staging Areas South Bulkhead
| Paul S. Sarbanes ecosystem restoration project at poplar island |
| Slide Number 2 |
| Slide Number 3 |
| ONGOING EXPANSION PROGRESS |
| 2019 Expansion STRUCTURES – SCOPE�SHEET GI002� |
| 2019 Expansion STRUCTURES – SCOPE�SHEET GI901� |
| 2019 Expansion STRUCTURES – SCOPE�SHEET C-101� |
| Slide Number 8 |
| BID SCHEDULE� |
| Slide Number 10 |
| 2019 Expansion Structures SCHEDULE |
| CONCURRENT POPLAR CONSTRUCTION |
| Thank you FOR ATTENDING |