Pojoaque Basin Regional Water System Phase II Design-Build
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- 140R4025R0032
- Agency
-
Bureau of Reclamation
Department of the Interior
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Bureau of Reclamation within the Department of the Interior is seeking contractors for the Pojoaque Basin Regional Water System Phase II Design-Build project, a water infrastructure construction initiative classified under NAICS code 237110 for Water and Sewer Line and Related Structures Construction. This pre-solicitation notice represents a sources sought inquiry to identify qualified contractors capable of designing and constructing water supply facilities as part of the second phase of this regional water system development. The procurement falls under PSC category Y1NE for Construction of Water Supply Facilities, indicating the project involves significant infrastructure development for water distribution and treatment capabilities. Interested parties have until October 17, 2025, to respond to this sources sought notice, which was posted on September 17, 2025. The government has provided a supporting document titled "SOURCES_SOUGHT__140R4025R0032_PBRWS_Ph2_w_map_1.pdf" that contains additional project details and mapping information for potential respondents.
This procurement does not include any set-aside designations, making it a full and open competition available to all qualified contractors regardless of size or socioeconomic status. The notice does not identify any incumbent contractors or previous award recipients for related phases of this water system project. No specific contract values, budget ranges, or award amounts have been disclosed in this preliminary sources sought phase of the procurement process. The timeline for actual construction services and project completion has not been specified in the available documentation. The design-build delivery method suggests the selected contractor will be responsible for both the engineering design and construction phases of the water infrastructure project, requiring comprehensive capabilities in both disciplines.
Notice text
Pojoaque Basin Regional Water System Phase II Design-Build
Files
| File | Type | Posted |
|---|---|---|
| SOURCES_SOUGHT__140R4025R0032_PBRWS_Ph2_w_map_1.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Pojoaque Basin Regional Water System Phase II Desi | Solicitation | |
| Pojoaque Basin Regional Water System Phase II Design-Build | Pre-Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| HAVO 326181 Rehabilitate Rainshed&Water Treatment | National Office | No set-aside | |
| LB Lateral Water Line and Facilities Replacement for Wastewater System | — | No set-aside | |
| White Horse Hill National Game Preserve Water Main Extension | — | Total Small Business | |
| Kelly Pierson OSS | Indian Health Service | Total Small Business | |
| YOSE 22866 Rehabilitate Hodgdon Meadows Water System and YOSE 196755 Extend Hod | — | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity