Pittsburgh International Airport (PIT) Refurbish Parking Lot and Sidewalk
Closed Solicitation Posted
- Solicitation number
- 00PIT2
- Agency
-
Southwestern Region
Federal Aviation Administration, Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238990 All Other Specialty Trade Contractors
- Place of performance
- Pittsburgh, Pennsylvania 15231, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Aviation Administration (FAA) Southwestern Region is soliciting proposals for a comprehensive parking lot and sidewalk refurbishment project at Pittsburgh International Airport. The project requires a contractor to supply materials, labor, tools, and services to complete specific infrastructure improvements, including removing and replacing concrete sidewalks, curbs, and gutters, milling and resurfacing asphalt pavement, refurbishing an exterior door structural facade, performing parking lot striping, and repairing security chainlink fencing. Proposals will be evaluated using a Best Value source selection process, with submissions assessed as either "Acceptable" or "Unacceptable". The solicitation requires contractors to have an active System for Award Management (SAM) registration and to provide performance and payment bonds. Key dates include a mandatory site visit on 5/09/2025, with proposal submissions due by 6/06/2025 at 12:00 EST, and the FAA intends to issue a Notice to Proceed (NTP) within 30 days of contract award.
The contract is set aside exclusively for small businesses in the NAICS category 238990 (All Other Specialty Trade Contractors), with an estimated project value between $300,000 and $500,000. The place of performance is Pittsburgh International Airport, located in Pennsylvania (ZIP 15231). Contractors must comply with Davis-Bacon wage requirements and provide detailed documentation, including a construction schedule, shop drawings, and site visit reports. The project has a 90-day duration and will require contractors to coordinate closely with the Contracting Officer's Representative (COR) and follow specific technical specifications for electrical systems, site access, and infrastructure improvements. Invoicing will be completed monthly via the DELPI system, with payments based on the percentage of work completed. Potential combined set-asides may include opportunities for 8(a) certified Small Disadvantaged Businesses (SDB) and Service-Disabled Veteran-Owned Small Businesses (SDVOSB).
Notice text
Scope: The Contractor shall supply materials, labor, tools, plant, supplies, equipment,
transportation, superintendence, temporary construction of every nature, and other services and
facilities necessary to complete the construction of the described works, including incidental
work as necessary.
B. Project description scope of work shall generally include:
1. Remove old concrete sidewalk and replace,
2. Remove temporary asphalt sidewalk and replace with concrete,
3. Remove and replace concrete curb and gutter,,
4. Milling and resurfacing asphat pavement,
5. Refurbish exterior door structural facade
6. Parking lot striping,
7. Security chainlink fence repairs