Attachment No. 4 - PIT ATCT Parking Lot Plans.pdf
PDF 3 MB Posted
- Solicitation number
- 00PIT2
About this file
These are detailed engineering plan drawings for the refurbishment of the parking lot and sidewalks at Pittsburgh International Airport (PIT ATCT) prepared by the U.S. Department of Transportation Federal Aviation Administration. The seven-page technical drawing set includes comprehensive site plans, existing and proposed site layouts, paving and striping plans, and detailed construction specifications for various elements including:
Key technical details include multiple construction phases involving removing and replacing concrete sidewalks, curbs, gutters, and asphalt surfaces; installing new mountable curbs and ADA parking features; repairing entry awning posts and light pole bases; adding geotextile filter fabric; implementing new concrete and gravel surfaces; and making infrastructure improvements around the base building. The drawings provide precise engineering specifications for each project element, with detailed cross-section views, material requirements, and construction notes, including directives to submit finish grade elevations, daily progress photos, and verify utility locations before excavation. The project drawings are signed by Michael Loughman and Doug Weaver, with drawing dates corresponding to the federal contract opportunity previously described.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PIT ATCT Parking Lot Rebid _ Final Package _BINDER
| PIT Cover Sheet Model (1) |
| PIT A01 Model (1) |
| PIT A02 Model (3.17.25) |
| PIT ATCT Parking Lot Rebid _ Final Package _BINDER |
| PIT A03 Model (1) |
| PIT A04 Model (1) |
| PIT A05_pavingplan Model (1) |
| PIT A07 Model (1) |
File details come from the government source that posted it. Updated .