PINN 250983 - Rehab Old Pinn Trailhead Parking Area/Shuttle Stop
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest pre-solicitation from .
- Solicitation number
- 140P2026R0023
- Agency
-
National Office
National Park Service, Department of the Interior
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The National Park Service, under the Department of the Interior, is seeking contractors to rehabilitate the Old Pinnacles Trailhead Parking Area and Shuttle Stop at Pinnacles National Park in California. The project encompasses comprehensive site improvements including paving a 10,500 square foot parking area, installing accessible facilities, creating pedestrian walkways, extending water infrastructure, and adding a shuttle stop with shade structure. Contractors must demonstrate capability to work in sensitive natural and cultural resource environments while minimizing visitor disruption and managing the logistics of a public park setting. The government will award a single Firm-Fixed-Price contract through a competitive Request for Proposals anticipated in late Spring 2026. Interested parties must submit a completed Sources Sought Survey Questionnaire by 2:00 PM Mountain Time on January 15, 2026, to shellie_murphy@nps.gov, and the formal RFP process will follow this market research phase.
This opportunity is not designated as a set-aside contract and is open to both large and small businesses, with a potential small business set-aside to be determined. The project budget is valued between $2 million and $3 million, with a firm-fixed-price contract structure requiring performance and payment bonding. The work must be completed within a 365-calendar day performance period and falls under NAICS code 237310 (Highway, Street, and Bridge Construction) with a size standard of $45 million. Key project deliverables include paving for 30 automobiles and 2 oversized vehicles, installing a 400 square foot accessible prefabricated vault toilet, extending 1,200 linear feet of water line, and relocating existing trail kiosks as part of the overall site rehabilitation effort.
Notice text
PINN 250983 - Rehab Old Pinn Trailhead Parking Area/Shuttle Stop
Files
| File | Type | Posted |
|---|---|---|
| A14_SSN_Survey_1.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Pinn 250983 - rehabilitate old pinnacles | Award Notice | |
| PINN 250983 - Rehab Old Pinn Trailhead Parking Area/Shuttle Stop | Pre-Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| BRCA 310427 Southbound Shuttle Stop | National Office | No set-aside | |
| NPS Repair or Alteration of Highways, Roads, Streets, Trails and Bridges Multip | — | No set-aside | |
| Request for Proposal Effigy Mounds National Monument - EFMO 224159/318539 | — | No set-aside | |
| Administrative Parking Lot Repairs | Forest Service | Total Small Business | |
| GRSM 321788 - Oconaluftee River Trail | — | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity