A14_MktResearch_SourcesSoughtNotice_1.pdf

PDF 126 KB Posted

Attached to
PERL 264852 Pearl Harbor National Monument Replace Shoreside Dock at Pearl Ha
Solicitation number
140P2021R0016
Issued by

About this file

This document is a sources sought notice from the National Park Service for replacement of a floating dock and gangways at the Pearl Harbor Visitor Center. The project will replace two existing floating concrete dock sections and gangways with new post-tensioned pre-fabricated sections and gangways. The dock sections will be approximately 90 feet long by 15 feet wide by 8 feet deep and equipped with anti-skid coatings, rails, gates, cleats, fenders, a dive ladder, and davit. A new shoreside structural mooring system and guide pile removal are also included. The estimated cost is between $1-5 million and the period of performance is June 2021 through August 2022. Interested parties must submit capabilities information by November 30, 2020 specific to logistics, maritime construction experience, working in active harbors, protecting resources, and phased construction maintaining public access. The purpose is to provide continued safe visitor access to the USS Arizona Memorial for over one million annual visitors and reduce risks by extending the dock lifespan to 20-30 years.

View the file

Other files

File Type Posted
A14_MktResearch_SourcesSoughtNotice Ext_2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The National Park Service has a requirement for the following project. If you are interested, please submit your detailed capabilities in WRITING to demonstrate same or similar experience. This is not a request for proposal or invitation to bid. No proposal package, solicitation, specification or drawings are available with this announcement. Response to this announcement is strictly voluntary; no reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information requests. If you choose to submit a package, clearly identify the park and project on your package (PERL 264852 Replace Floating Dock) and identify your socioeconomic status (8(a), HUBZone, Service Disabled Veteran, WOSB, EDWOSB, and Small).

Your email capability information MUST be 10 pages or less and be SPECIFIC to the scope provided.

Your response is due no later than 4:00 pm Mountain Time on November 30, 2020.

The Government anticipates conducting a competitive acquisition for this requirement. The amount of interest or lack thereof will determine the possibility of a competitive set-aside or full and open competition (the size of a small business firm includes all parents, subsidiaries, affiliates, etc.—see 13 CFR 121.108.) Misrepresentation of size status can result in penalties. All firms should be registered and certified in www.SAM.gov.

Please refer to the current SBA rules regarding HUBZone firms, effective October 1, 2011.

Send your email responses gabriel_castellaos@nps.gov.

Analysis of the quality of responses to this sources sought announcement will be considered in the market research being conducted, and in the making of any small business set-aside determination for this requirement.

Pearl Harbor National Monument Replace Shoreside Dock at Pearl Harbor Visitor Center NAICS Code: 237990 Estimated Cost Range: $1 million - $5 million Estimated Period of Performance: June 2021 – August 2022

Project Description The purpose of this project is to replace the existing two concrete floating dock sections at the Pearl Harbor Visitor Center shoreside dock area with two new post-tensioned, pre-fabricated floating dock sections of approximately the same size dimensions (each 90’ L x 15’ W x 8’ D). The new dock sections will be equipped with skid resistant coatings, anodized aluminum rails and gates, mooring cleats and fenders, a dive ladder and a davit for lifting heavy items into/out of the water. The two existing pedestrian gangways will be replaced with new gangways and the existing guide piles that secure the dock sections in place will be removed. In addition, a new shoreside structural mooring system will be installed on the land to provide stabilization for the new dock and gangways.

http://www.sam.gov/ mailto:gabriel_castellaos@nps.gov

The shoreside dock provides the only access to the USS Arizona Memorial for over one million visitors annually. This project will extend the life cycle of the dock to a 20-30 year period ensuring safe, stable and continued visitor access to the USS Arizona Memorial which is a major destination for many US and international visitors to Hawaii. It reduces risks and hazards for the visitors and enables the park to meet it’s mission.

****Firms interested in the project should possess the following specialized skills and experience and address these specialized skills and experience in their responses to this Notice.

1. Experience in the construction of similar complexity and size projects including:

a. Logistics of coordinating and procuring pre-fabricated materials to be shipped from great distances

b. Maritime construction, including on-water demolition/construction of floating docks, gangways, anchor piles and structural mooring systems

2. Experience working in a similar environment, including:

a. Working adjacent to other contractors working on different projects

b. Working in an active maritime harbor busy with regular US Naval operations

c. Responsibility for the protection of cultural and natural resources

d. Experience working in tropical and on-water with tidal fluctuations and low water table/ high ground water conditions.

e. Experience working in remote area where material deliveries and worker commutes are difficult.

3. Experience with phased construction in a public environment, including:

a. Phased demolition/construction that safely maintains partial public access/visitation to the project site within or adjacent to the work zone project site throughout construction

File details come from the government source that posted it. Updated .