Pack Animal Support
Closed Solicitation Posted
- Solicitation number
- 140G0326Q0089
- Agency
-
Office of Acquisitions and Grants
US Geological Survey, Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 115210 Support Activities for Animal Production
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Geological Survey (USGS) Oregon Water Science Center is seeking pack animals and wrangler services to support wilderness fieldwork in the Mark O. Hatfield Wilderness Area near Mount Hood, Oregon. The procurement requires an experienced contractor to provide pack train transport (mules, horses, or similar animals) and qualified wranglers for three separate trips between July 27 and October 31, 2026, with each trip involving transportation of 800–1,200 pounds of supplies approximately six miles from the Wahtum Lake trailhead to a base camp. Key requirements include obtaining all necessary U.S. Forest Service permits, providing weed-free hay feed, ensuring adequate water for animals, and maintaining strict compliance with wilderness regulations and leave-no-trace practices. The contract will be awarded using Lowest Price Technically Acceptable (LPTA) criteria, with past performance considered as an evaluation factor. Vendors must submit questions by Thursday, April 16, 2026, at 5:00 PM PT, and quotes must be submitted electronically to elizabeth_adam@ios.doi.gov by Wednesday, April 22, 2026, at 5:00 PM PT.
This is a total small business set-aside solicitation under NAICS code 115210 (Support Activities for Animal Production) with no identified incumbent contractor. No specific budget range has been disclosed in the solicitation materials. Each trip will be billed individually upon completion as a separate contract element, and vendors must provide a firm fixed-price quote with a signed Standard Form 18, detailed technical description, work plan, company information, and wrangler experience documentation. Services are limited to packing supplies inbound on the first day of each trip and packing out all refuse, equipment, and collected geological samples on the final day, with the wrangler not required to cook for geologists or remain at camp during operations. Performance will take place at the Mark O. Hatfield Wilderness Area in the Benson Plateau area accessible via the Wahtum Lake trailhead, with individual trips separated by at least five days.
Notice text
2 versions
Update #2 · Latest ·
*** AMENDMENT ONE ***
PACK ANIMALS AND WRANGLER/S FOR WILDERNESS FIELDWORK - MULTNOMAH, OR
The purpose of this Amendment is to answer vendor questions and extend the due date for quotes to Wednesday, April 22, 2026, at 5:00pm PT. No further questions will be accepted.
Questions and Answers
1) Is the trailhead large enough to accommodate a 24ft gooseneck stock trailer? plus staging area for making loads/saddling etc?
Answer: I think there is plenty of space at the Wahtum Lake trailhead for the trailer and staging.
2) Is the wrangler required to cook for the camp/geologists?
Answer: No. The wrangler is only required to deliver and off-load the gear to the destination camp and then pick up at the end of the week.
3) Are the geologists hiking in/out or are we expected to provide riding animals for them?
Answer: The geologists will be hiking in and out.
4) Will the trails be cleared by trail crews before the initial trip, or will the packers be expected to clear trail from downed trees on the way into the camping location? ( we would of course bring a crosscut saw for trees here and there that may have fallen between trips)
Answer: This is a tough question. The trail is not clear as of the latest hiker reports but we expect/hope it will be cleared (by the Forest Service or the Pacific Crest Trail Association or other hiker groups) by the time of the required services in August. I suggest that we make the contract contingent on the trail having been cleared to a condition passable for pack animals. We don't want to build significant trail clearing into the contract.
5) According to "onX" mapping, it appears it's about 5-6 miles by trail to the Benson Plateau area. Is that an accurate rough estimate?
Answer: Yes, this is correct.
6) Is the wrangler expected to stay around camp during operations until the conclusion of the trip? If so, what are appropriate means of stock containment that have been approved such as high lining, electric fence, picket/hobbles?
Answer: No, the wrangler is not expected to stay, just drop off and pick up.
7) Excluding last minute changes from weather related issues, how far in advance is it expected that we can coordinate/plan trips, if we were driving from out of state.
Answer: I anticipate that we should provide a tentative schedule upon awarding the contract, with any modifications (aside from fire or weather issues) having at least seven days notice.
8) Is the wrangler also expected to set up/break down camp for the geologists or just deliver the camp loads to the camp site/trailhead.
Answer: The geologists will set up and break down the camps.
9) is it a one lump sum payment at the conclusion of the three trips, or will each trip be billed/paid per trip?
Answer: I'm not sure about this but I expect that each trip will be a separate element of the contract and that the contractor can invoice upon completion of each individual trip.
10) Is the wrangler required to provide any bear proof trash receptacles for camp refuse?
Answer: No.
11) will the packer need to pick up the gear at a local forest service office or will gear be brought to the packer at the trailhead?
Answer: The gear will be delivered to the trailhead or possibly an alternate local site at the mutual agreement of the contractor and the geologist party.
Update #1 ·
PACK ANIMALS AND WRANGLER/S FOR WILDERNESS FIELDWORK - MULTNOMAH, OR
REQUEST FOR QUOTE
INTRODUCTION
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) Part 12.
SMALL BUSINESS SET-ASIDE
SERVICE CONTRACT LABOR STANDARDS STATUTE APPLICABLE
DESCRIPTION
The US Geological Survey (USGS), Oregon Water Science Center (ORWSC), requiresthe services of pack animals and wrangler/s as described in the attached Statement of Work (SOW).
RELEVANT INFORMATION
The North American Industry Classification System (NAICS) code 115210 Support Activities for Animal Production, and associated size standard $11.0 million applies to this announcement, along with Product Service Code W088 Lease or Rental of Equipment - Live Animals.
All services will be performed at the Mark O. Hatfield Wilderness area.
QUESTIONS
Questions to Liz Adam at elizabeth_adam@ios.doi.gov by Thursday, April 16, 2026, at 5:00pm PT.
SUBMISSION OF QUOTES
Quotes shall only be accepted through electronic mail addressed to the Contracting Officer at elizabeth_adam@ios.doi.gov Tuesday, April 21, 2026, at 10:00am PT. Quotes submitted by hardcopy or any web portal shall not be accepted or considered
Offerors are to include a technical description of the services being offered in sufficient detail to evaluate compliance with the requirements in the solicitation as seen in the Evaluation Factors (see provision). This may include a work plan, company information, and experience of the wrangler/s.
EVALUATION FACTORS
- Lowest Price Technically Acceptable (LPTA)
- Past performance considered
ESTIMATED PERIOD OF PERFORMANCE
July 27, 2026 - October 31, 2026
Offerors shall return the following:
- Signed SF-18
- Firm, fixed price quote
- Relevant technical information including work plan and experience.
- System for Award Management (SAM) Unique Identification Entity (UEI).
Attached Pages:
- Statement of Work
- Provisions and Clauses
Files
| File | Type | Posted |
|---|---|---|
| Sol_140G0326Q0089_Amd_0001.pdf | ||
| Sol_140G0326Q0089.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity