2-Phase Stand-Alone, Design Build P284 F-35C Hangar at NAS Lemoore

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
N6247318R2203
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

PSC
Not on record
Place of performance
700 Avenger Ave, Lemoore, CA 93246 US

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Constructs a multi-story aircraft maintenance hangar with reinforced concrete masonry unit, metal-deck, combination of steep slope standing seam metal roof and low slope built-up roof, and pile foundation. The facility will have high bay space; shops and maintenance space; and operations, training, and administrative space. Hangar facility to include aircraft cooling air system, aircraft service stations/kiosks, emergency generator for power and fire suppression storage tanks. Constructs aircraft parking apron, taxiway connections, and shoulders. Parking apron to include aircraft service stations/kiosks. Constructs operational storage. Renovates existing space to provide a battery shop. Constructs a new preengineered building for a tool room. This project will provide Anti-Terrorism/Force Protection (AT/FP) features and comply with AT/FP regulations, and physical security mitigation in accordance with DoD Minimum Anti-Terrorism Standards for Buildings. User Generated Unit Cost is used for specific AT/FP features are included in the unit costs. Special costs include Post Construction Contract Award Services (PCAS), condensed schedule premium, and temporary facilities. Special costs also include monitoring during Secure Access Program Facility (SAPF) construction; including surveillance by Construction Security Technicians and Cleared American Guards during secure space finish work in accordance with Intelligence Community guidance. Construction monitoring is required to observe the construction to ensure there are no abnormalities that could affect and compromise the SAPF. Operations and Maintenance Support Information (OMSI) is included in this project. Department of Defense and Department of the Navy principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development will be included in the design and construction of this project as appropriate. Special construction features include temporary facilities, a wash rack utilities support control building, and liquid oxygen storage. Site preparation includes removal of existing pavement, contaminated soil removal, excavation, grading, site clearing and grubbing, borrow material, and site cleanup. Paving and site improvements include grading, road access, curbs and gutters, ready storage locker pads, parking for approximately 300 spaces, pedestrian features, security fencing, canopy site development, landscaping, stormwater infiltration system, airfield support facilities, wash rack and hazmat storage area. Electrical utilities include primary and secondary distribution systems, unit substations, aircraft protection equipment shelters, generators, lighting, and telecommunications infrastructure. Mechanical utilities include natural gas lines, water distribution lines, stormwater, sanitary sewer lines, fire protection systems and supply lines, and water storage tanks. Facilities will be designed to meet or exceed the useful service life specified in DoD Unified Facility Criteria. Facilities will incorporate features that provide the lowest practical life cycle cost solutions satisfying the facility requirements with the goal of maximizing energy efficiency.

Update #1 ·

Constructs a multi-story aircraft maintenance hangar with reinforced concrete masonry unit, metal-deck, combination of steep slope standing seam metal roof and low slope built-up roof, and pile foundation. The facility will have high bay space; shops and maintenance space; and operations, training, and administrative space. Hangar facility to include aircraft cooling air system, aircraft service stations/kiosks, emergency generator for power and fire suppression storage tanks. Constructs aircraft parking apron, taxiway connections, and shoulders. Parking apron to include aircraft service stations/kiosks. Constructs operational storage. Renovates existing space to provide a battery shop. Constructs a new pre-engineered building for a tool room. This project will provide Anti-Terrorism/Force Protection (AT/FP) features and comply with AT/FP regulations, and physical security mitigation in accordance with DoD Minimum Anti-Terrorism Standards for Buildings. User Generated Unit Cost is used for specific AT/FP features are included in the unit costs. Special costs include Post Construction Contract Award Services (PCAS), condensed schedule premium, and temporary facilities. Special costs also include monitoring during Secure Access Program Facility (SAPF) construction; including surveillance by Construction Security Technicians and Cleared American Guards during secure space finish work in accordance with Intelligence Community guidance. Construction monitoring is required to observe the construction to ensure there are no abnormalities that could affect and compromise the SAPF. Operations and Maintenance Support Information (OMSI) is included in this project. Department of Defense and Department of the Navy principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development will be included in the design and construction of this project as appropriate. Special construction features include temporary facilities, a wash rack utilities support control building, and liquid oxygen storage. Site preparation includes removal of existing pavement, contaminated soil removal, excavation, grading, site clearing and grubbing, borrow material, and site cleanup. Paving and site improvements include grading, road access, curbs and gutters, ready storage locker pads, parking for approximately 300 spaces, pedestrian features, security fencing, canopy site development, landscaping, stormwater infiltration system, airfield support facilities, wash rack and hazmat storage area. Electrical utilities include primary and secondary distribution systems, unit substations, aircraft protection equipment shelters, generators, lighting, and telecommunications infrastructure. Mechanical utilities include natural gas lines, water distribution lines, stormwater, sanitary sewer lines, fire protection systems and supply lines, and water storage tanks. Facilities will be designed to meet or exceed the useful service life specified in DoD Unified Facility Criteria. Facilities will incorporate features that provide the lowest practical life cycle cost solutions satisfying the facility requirements with the goal of maximizing energy efficiency.

Files

Notice history

Notice Type Posted
2-Phase Stand-Alone, Design Build P284 F-35C Hangar at NAS Lemoore Award Award Notice
This notice Latest solicitation Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors