N6247318R2203_RFP_Phase_One_Amendment_0001.pdf

PDF 459 KB Posted

Attached to
2-Phase Stand-Alone, Design Build P284 F-35C Hangar at NAS Lemoore
Solicitation number
N6247318R2203
Issued by

About this file

N6247318R2203_RFP_Phase_One_Amendment_0001.pdf

View the file

Other files

File Type Posted
N6247318R2203_RFP_Phase_One_Amendment_0002.pdf PDF
N6247318R2203_P284_Phase_One_RFP.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5201980

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

BEST VALUE TRADEOFF TWO PHASE UNRESTRICTED FULL AND OPEN SINGLE AWARD STAND ALONE DESIGN BUILD MILCON FY19 CONSTRUCTION CONTRACT FOR P-284 F-35C MAINTENANCE HANGAR AT NAVAL AIR STATION (NAS) LEMOORE, CALIFORNIA

THE PURPOSE OF THIS AMENDMENT IS TO CHANGE THE FACTORS AND ANSWER RFIS.

SEE PAGE TWO FOR DETAILS.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Dec-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6247318R2203

X 9B. DATED (SEE ITEM 11)

09-Nov-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Dec-2018

CODE

NAVFAC SOUTHWEST

CAPITAL IMPROVEMENTS CONTRACT CORE

CODE: CIMAR

1220 PACIFIC HIGHWAY

SAN DIEGO CA 92132-5190

N62473 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6247318R2203

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

AMENDMENT 0001 – DATED 04 DECEMBER 2018

This is an amendment to subject RFP:

1. Proposal receipt deadline remains unchanged at 10 December 2018 by 2:00 p.m., Local Time.

2. Solicitation 1442 Block 9. B. TELEPHONE NO. 619-532-4428 is incorrect. Do not call this phone number. To contact the Contract Specialist Brandon Spaulding by phone call 619-532-3290, or by email at brandon.spaulding@navy.mil.

3. RFP Section F. EVALUATION FACTORS FOR AWARD, FACTOR 2: EXPERIENCE is hereby revised as follows:

FROM:

(1) Construction Experience:

Submit a minimum of three (3) and up to a maximum of five (5) relevant construction projects for the Offeror that best demonstrates your experience on projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as projects that include at least two of the following elements:

New Construction of a Multi-bay aircraft hangar;

New Construction of an accredited ICD-705.v1.3 compliant facility (Meeting Physical and Technical Standards for Sensitive Compartmented Information Facilities);

Construction coordination with airfield operations New Construction with special shallow foundations with structural fill and deep stone column systems.

All relevant projects when combined must demonstrate experience with all four (4) of the above elements.

Weighting of submissions:

A relevant project with three or more of the above relevancy criteria may be given more weight;

A relevant project with an awarded construction cost of $80M or above may be given more weight.;

The minimum awarded construction cost must be at least $50M for a project to be relevant.

Projects submitted for the Offeror shall be 100% Complete within the past five (5) years of the date of issuance of this RFP; except for projects submitted with special shallow foundations with structural fill and deep stone column systems – those projects shall be 100% Complete within the past ten (10) years of the date of issuance of this RFP.

(2) Design Experience

Submit a minimum of three (3) and up to a maximum of five (5) relevant design projects for the Offeror that best demonstrates your experience on projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as projects that include as least two of the following elements:

Design of a Single-bay or Multi-bay aircraft hangar (new construction only);

Design of an accredited ICD-705 compliant facility (Meeting Physical and Technical Standards for Sensitive Compartmented Information Facilities) (new construction only);

Design with coordination with airfield operations;

Design of with special shallow foundations with structural fill and deep stone column systems (new construction only).

All submitted projects when combined must include all four (4) of the above elements.

Weighting of submissions:

A relevant project with three or more of the above relevancy criteria may be given more be weight.

A relevant project with an awarded construction cost of $80M or above may be given more weight;

The minimum awarded construction cost must be at least $50M for a project to be relevant.

Projects submitted shall be completed within the past five (5) years of the date of issuance of this RFP. For design-build projects, the design portion of the contract shall have been completed within the past five (5) years of the date of issuance of this RFP; except for projects submitted with special shallow foundations with structural fill and deep stone column systems; those projects shall be completed within the past ten (10) years of the date of issuance of this

RFP.

TO:

(1) Construction Experience:

Submit a minimum of two (2) and up to a maximum of five (5) relevant construction projects for the Offeror that best demonstrates your experience on projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as projects that include at least two of the following elements:

New Construction of a Single-bay or Multi-bay aircraft hangar;

New Construction of an accredited ICD-705.v1.3 compliant facility (Meeting Physical and Technical Standards for Sensitive Compartmented Information Facilities);

Construction coordination with airfield operations New Construction with special shallow foundations with structural fill and deep stone column systems.

All relevant projects when combined must demonstrate experience with all four (4) of the above elements.

Weighting of submissions:

A relevant project with three or more of the above relevancy criteria may be given more weight;

A relevant project with an awarded construction cost of $80M or above may be given more weight.;

The minimum awarded construction cost must be at least $30M for a project to be relevant.

Projects submitted for the Offeror shall be 100% Complete within the past seven (7) years of the date of issuance of this RFP; except for projects submitted with special shallow foundations with structural fill and deep stone column systems – those projects shall be 100% Complete within the past ten (10) years of the date of issuance of this RFP.

(2) Design Experience

Submit a minimum of two (2) and up to a maximum of five (5) relevant design projects for the Offeror that best demonstrates your experience on projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as projects that include as least two of the following elements:

Design of a Single-bay or Multi-bay aircraft hangar (new construction only);

Design of an accredited ICD-705 compliant facility (Meeting Physical and Technical Standards for Sensitive Compartmented Information Facilities) (new construction only);

Design with coordination with airfield operations;

Design of with special shallow foundations with structural fill and deep stone column systems (new construction only).

All submitted projects when combined must include all four (4) of the above elements.

Weighting of submissions:

A relevant project with three or more of the above relevancy criteria may be given more be weight.

A relevant project with an awarded construction cost of $80M or above may be given more weight;

The minimum awarded construction cost must be at least $30M for a project to be relevant.

Projects submitted shall be completed within the past seven (7) years of the date of issuance of this RFP. For design-build projects, the design portion of the contract shall have been completed within the past seven (7) years of the date of issuance of this RFP; except for projects submitted with special shallow foundations with structural fill and deep stone column systems; those projects shall be completed within the past ten (10) years of the date of issuance of this RFP.

4. RFP Section F. EVALUATION FACTORS FOR AWARD, FACTOR 8: PRICE is hereby revised as follows:

FROM:

Note 1: A price that appears to be either unreasonably high or unreasonably low in relation to the proposed work may be indicative of an inherent lack of understanding of the solicitation requirements and may result in the overall proposal being considered unacceptable.

TO:

Note 1: A price that appears to be unreasonably high in relation to the proposed work may be indicative of an inherent lack of understanding of the solicitation requirements and may result in the overall proposal being considered unacceptable.

5. RFP Section 00700 - Contract Clauses, 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) is hereby revised as follows:

FROM:

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 754 calendar days. * The time stated for completion shall include final cleanup of the premises.

*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

TO:

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 754 calendar days. * The time stated for completion shall include final cleanup of the premises. Early Beneficial Occupancy Date (BOD) will be required for one Aviation Logistics Information Server (ALIS) room on 31 March 2021.

*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

6. The following information is provided in response to RFIs:

Question 1:

I do understand this is going to be new construction. Will you be needing testing and inspection?

Answer 1:

Yes, per RFP requirements.

Question 2:

The Proposal Submission Requirements for Factor 2 Experience are extremely limiting and will thereby disqualify most highly qualified and experienced General Contractors. Based on our current interpretation of the requirements for Factor 2 Experience, it appears as though we do not qualify. In fact, based on contract awards for Hangars in the past several years, we don’t believe there are but maybe one or two contractors in the nation that could qualify (if that). Most Hangars values are in the $30,000,000 range so it is unlikely that contractors will meet the requirement.

Additionally, projects that include Accredited ICD-705.v1.3 Compliant Facilities and/or special foundations are not common, especially when required to be over the $50,000,000 requirement. So without revision to the requirements, you will very likely end up with only one bidder, or maybe even no bidders. Please review the Technical requirements for Experience and consider a revision to allow more qualified competition.

Answer 2:

Factor 2 Experience has been revised, see item 3 above.

Question 3:

The Proposal Submission Requirements for Factor 2 Experience, requires Offerors to submit relevant projects to demonstrate experience. The RFP further defines relevant projects to include one of (4) elements including: (1) Multi-bay Aircraft Hangars; (2) Accredited ICD-705.v1.3 Compliant Facilities; (3) Coordination with Airfield Operations; and (4) New Construction with special shallow foundations. Additionally, each project submitted must be valued at greater than $50,000,000 and completed within the past 5 years (10 years for Element 4). Quite simply, Hangar projects valued at greater than $50,000,000 are few and far between. Most recent military Hangar projects are valued between $30,0000,000 - $40,000,000. Some of the recently awarded KC-46A Hangar projects have a higher value, but that is because the Hangars are much larger in size and include a significant amount of non-Hangar scope (i.e., airfield paving, site and infrastructure improvements, demolition). However, the KC-46A program is relatively new and most of those hangars are not yet complete. Please consider revising the definition for relevant projects to include projects greater than $30,000,000 completed within the past 5 year period.

Answer 3:

See response to RFI 2.

Question 4:

For Factor 2 Experience, if a mega-project included a $30,000,000 Hangar, plus multiple other buildings (e.g., Passenger Terminal, Cargo Facility, etc.), please confirm that the required $50,000,000 value threshold is for the Hangar and related site improvements only. Or can the value of all buildings be used to reach the $50,000,000 value?

Answer 4:

Factor 2 Experience has been revised, see item 3 above. The minimum awarded construction cost for a project to be relevant, includes the Hangar and related site improvements only, additional buildings are not considered in calculating the minimum threshold.

Question 5:

For Factor 2 Experience, Offerors are required to submit relevant projects that can include “Multi-bay Aircraft Hangars”. Most F-35 Hangars include only one “bay” that accommodates multiple F-35 Aircraft. Is an F-35 Hangar that includes only one bay but accommodates multiple F-35 Aircraft considered acceptable?

Answer 5:

Yes, Factor 2 Experience has been revised, see item 3 above.

Question 6:

I noticed this opportunity references “temporary facilities” as part of the SOW. However, I was unable to find any further explanation for the temporary facilities requirements.

Can you elaborate? Any assistance is appreciated.

Answer 6:

The “temporary facilities” will be elaborated on in the plans and specifications that will be released in Phase Two of the solicitation.

Question 7:

RFP: Section 00100, Factor 2 - Experience, (a) Solicitation Submittal Requirements, (1) Construction Experience and (2) Design Experience, Page 14 and 15 of 61

In the relevancy criteria for construction and design project experience, the RFP states "For the purposes of this evaluation, a relevant project is further defined as projects that include at least two of the following elements:

referring to the bullet list of four items defining relevant projects.

In our experience, the four relevancy criteria are very unique and not frequently found in combination with each other on projects. In order for the Government to have the best selection of highly relevant project experience to evaluate, we respectfully request that the RFP be changed to read: "For the purposes of this evaluation, a relevant project is further defined as projects that include at least one of the following elements:"

Answer 7:

See response to RFI 2.

Question 8:

RFP: Section 00100, Factor 2 - Experience, (a) Solicitation Submittal Requirements, (1) Construction Experience and (2) Design Experience, Page 14 and 15 of 61

The RFP states that, with the exception of those involving special shallow foundations with structural fill and deep stone column systems, all projects submitted for the Offeror and the design partner "shall be 100% complete within the past five (5) years of the date of issuance of this RFP …"

In our experience, hangar and airfield projects tend to be large and not as frequently solicited as other project types.

In order for the Government to have the best selection of highly relevant project experience to evaluate, we respectfully request that the RFP be changed to allow Offerors and design partners to submit projects completed within the past ten (10) years of the date of issuance of this RFP.

Answer 8:

See response to RFI 2.

Question 9:

RFP: Section 00100, Factor 2 - Experience, (a) Solicitation Submittal Requirements, (1) Construction Experience and (2) Design Experience, Page 14 and 15 of 61

The second bulleted item in relevancy criteria list for construction and design project experience reads: "• New Construction (or Design) of an accredited ICD-705.v1.3 compliant facility (Meeting Physical and Technical Standards for Sensitive Compartmented Information Facilities);"

There have been many relevant and innovative SCIF projects designed and built under the previous intelligence community standard, DCID 6/9. We respectfully request that the RFP be amended to allow offerors and design partners submit SCIF project experience completed within the past 10 years, including projects designed or built according to DCID 6/9.

Answer 9:

See response to RFI 2.

Question 10:

We are interested in bidding the new Hangar project and would like to know what I need to do to get the specifications and plans?

Answer 10:

This is Phase One of a Two Phase solicitation. The specifications and plans will be provided in Phase Two only to the Phase One bidders selected to proceed to Phase Two.

Question 11:

I already checked the website called fedbizzopps.com, to find more information related to this project, but I did not find any plans and I

Wanted to know if you would be able to provide an specific date regarding the plan submittal.

Answer 11:

See response to RFI 10.

Question 12:

The Experience Factor is similar restrictive and effective disqualifies just about every potential Offeror.

Also, I have attached a list of recent Hangar project awards. The list is every Contract Award for a new “military” Hangar posted since July 2014. As you will see, there just aren’t that many Hangars that are valued at greater than $50 million. The list shows that there are only (12) Hangars awarded over $50 million in the past (4) years.

And of those, only (3) Contractors have been awarded more than one contract: Hensel Phelps, Core Tech-AMEC- SKEC & Harper Construction.

(Note: Both of Core Tech’s Hangars are located in Guam. And both of Hensel Phelps’ Hangars are located in Hawaii. Those locations significantly increase the construction cost.)

Answer 12:

See response to RFI 2.

Question 13:

Regarding Factor 2 – Experience criteria, we suggests revising the minimum design criteria to reflect awarded construction costs of $40M in lieu of $50M to enable greater flexibility for the design team members. The current design criteria is highly restrictive particularly for ICD 705 compliant facilities. The suggested design experience would be revised as follows:

(2) Design Experience:

Submit a minimum of three (3) and up to a maximum of five (5) relevant construction projects for the Offeror that best demonstrates your experience on projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as projects that include at least two of the following elements:

* New Construction of a Multi-bay aircraft hangar;

* New Construction of an accredited ICD-705.v1.3 compliant facility (Meeting Physical and Technical Standards for Sensitive Compartmented Information Facilities);

* Construction coordination with airfield operations

* New Construction with special shallow foundations with structural fill and deep stone column systems.

All relevant projects when combined must demonstrate experience with all four (4) of the above elements.

Weighting of submissions:

* A relevant project with three or more of the above relevancy criteria may be given more weight;

* A relevant project with an awarded construction cost of $80M or above may be given more weight.;

The minimum awarded construction cost must be at least $40M for a project to be relevant.

Projects submitted shall be completed within the past five (5) years of the date of issuance of this RFP. For design-build projects, the design portion of the contract shall have been completed within the past five (5) years of the date of issuance of this RFP; except for projects submitted with special shallow foundations with structural fill and deep stone column systems; those projects shall be completed within the past ten (10) years of the date of issuance of this

RFP.

Please advise if the Phase 1 solicitation can be revised accordingly.

Answer 13:

See response to RFI 2.

Question 14:

We are interested in bidding on the above mentioned project, but I have been unable to locate docs. Is there any way you can send me a link to the project docs?

Answer 14:

See response to RFI 10.

Question 15:

RFP Section 00100, Factor 2 - Experience, Paragraph (a) Solicitation Submittal Requirements, (1) Construction Experience and (2) Design Experience, Page 14 and 16 of 61

The RFP states that "The minimum awarded construction cost must be at least $50M for a project to be relevant."

Based on our experience and observation, it is unlikely that enough otherwise well-qualified offerors have built hangars over $50M during the past 5 years to present a competitive selection of such projects to evaluate. We respectfully request that this relevant awarded construction cost minimum be reduced to at least $40M.

Answer 15:

See response to RFI 2.

Question 16:

RFP Section 00100, Factor 2 - Experience, Paragraph (a) Solicitation Submittal Requirements, (1) Construction

Experience and (2) Design Experience, Page 14 and 15 of 61

The second bulleted item in relevancy criteria list for construction and design project experience reads: "• New Construction (or Design) of an accredited ICD-705.v1.3 compliant facility (Meeting Physical and Technical Standards for Sensitive Compartmented Information Facilities);"

A brief review of the change history for ICD-705 indicates that each version of the specification has many small modifications and a few significant ones, however none that greatly alter the intent or complexity of the requirements. Also, it should be noted that there were also significant time lags during the transition from the DCID 6/9 specification to ICD-705 and from the first version of ICD-705 to later versions. There were many projects that began with one specification and were amended to apply features of the new specification. We respectfully request that the RFP be amended to allow offerors and design partners to submit project experience executed under any version of ICD-705, as well as under the previous standard, DCID 6/9.

Answer 16:

See response to RFI 9.

Question 17:

SF1442, Box 13, Item A, Page 1

Because of unanswered RFIs currently in progress that are critical to Factor 2 project experience selection, we respectfully request that the due date for the phase 1 proposal be moved one week to December 17th, 2018.

Answer 17:

The RFP Phase One due date is NOT extended.

Question 18:

I been looking at fedbizopps.gov to follow up with the changes and uploaded information about this project, and the only thing I see is the solicitation 1 being posted. According to that file the deadline to submit a proposal is December 10th, 2018 and I was wondering if the deadline is going to change or it still for the same day. If the deadline is not going to change, I just wanted to know if more information will be provided on the website

Answer 18:

All amendments and required documentation to bid on Phase One of the RFP will be provided on NECO and/or FBO on or before the RFP due date.

7. All other paragraphs, provisions, and conditions to this proposed contract remain unchanged.

The offeror must acknowledge receipt of all amendments on the offer schedule.

(End of Summary of Changes)