Overhaul the UH-1N Main Rotor Hub Assembly
Award Notice Posted
- Solicitation number
- FA8524-25-D-0004
- Agency
-
Air Force Sustainment Center
Air Force Materiel Command, Department of Defense
- Awarded
- to Able Aerospace Services, Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- FA852425D0004 Federal IDV award
- NAICS code
- 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing
- Place of performance
- Mesa, Arizona 85212, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Materiel Command Air Force Sustainment Center has awarded a Federal Contract Opportunity (ID: 4466dc16cbc447218cc08209b47ec34c) to Able Aerospace Services, Inc. for an overhaul of UH-1N Main Rotor Hub Assemblies. The contract, valued at $10,553,162.00, covers the repair and replacement of 27 total main rotor hub assemblies (24 master and 3 sub assemblies) for Bell 205 and 212 model helicopters. The contract period of performance spans from May 28, 2025, through May 27, 2028, with a requirement that all repairs and overhauls be completed within 180 days after asset induction. The awardee must be a Bell certified vendor for component repairs and was selected through a competitive, firm-fixed-price acquisition process.
Notice text
Awardee of this contract possess the pre-qualification requirements as being a Bell certified vendor for component repairs on the Bell 205 and 212 model helicopters. Unit of issue is Each (EA). This is a FFP Competitive acquisition for the Main Rotor Hub Assembly applicable to the UH-1N aircraft.
National Stock Number(NSN) Part Number Nomenclature Qty
1615-01-509-9741 204-012-101-029G Main Rotor Hub Assembly Master 24
1615-01-509-9742 204-012-101-015G Main Rotor Hub Assembly Sub 3
This contract Period of Performance (PoP) is from 28 May 2025 through 27 May 2028. All repairs/overhauls are to be completed 180 days after induction of the assets.
Awarded contract FA852425D0004 to Able Aerospace Services, Inc. for 10553162.00 on 2025-05-28.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Award Notice | |
| Overhaul the UH-1N Main Rotor Hub Assembly | Solicitation | |
| Overhaul the UH-1N Main Rotor Hub Assembly | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Overhaul of the UH-60 POWER TURBINE MODULE | ACC Redstone | No set-aside | |
| Overhaul of the AH-64 Apache Housing Assy, Pitch M/R | ACC Redstone | No set-aside | |
| Solicitation for Overhaul of the Hydraulic Valve | ACC Redstone | Total Small Business | |
| Stabilizer bar damper assembly / 27F, HH-60 all variations pave hawk helicopter | Aviation | No set-aside | |
| FMS Repair QTY: 4, H-60 | Naval Supply Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity