Operation & Maintenance for SBIWTP

Awarded Award Notice Posted

Solicitation number
IBM15R0001
Agency
International Boundary and Water Commission U.S.-Mexico
Awarded
to Veolia Water West Operating Services Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
IBM15C0006 Federal contract award
NAICS code
221320 Sewage Treatment Facilities
PSC
Not on record
Place of performance
2995 Clearwater Way San Diego, California 92173, United States

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

Added: Aug 25, 2015 6:37 pm

THIS IS AN AWARD NOTICE.

Update #4 ·

Added: Apr 20, 2015 4:43 pm Amendment A002 is now posted. Please refer to the attachments.

Acknowledgement of the Amendment is required.

Update #3 ·

Added: Apr 10, 2015 3:20 pm Amendment A001 is now posted. Please refer to the attachments.

Acknowledgement of the Amendment is required.

Update #2 ·

Added: Feb 17, 2015 4:06 pm Modified: Mar 12, 2015 11:38 amTrack Changes

THIS IS A SOLICITATION NOTICE. THE USIBWC IS REQUESTING OFFERS AT THIS TIME.

The United States Section of the International Boundary and Water Commission (USIBWC), has a requirement for a firm fixed price, non-personal services contract for the operation and maintenance (O&M) of the South Bay International Wastewater Treatment Plant (SBIWTP) and facilities located in San Diego County, California.

The Contractor shall provide, all labor, material, management and other resources required to perform full service operation and maintenance (O&M) of the South Bay International Wastewater Treatment Plant (SBIWTP), and South Bay Land Outfall (SBLO) located in San Diego, California, San Diego County. Full service operation and maintenance is defined as complete facility operation and maintenance, including but not limited to providing day-to-day contract management, planning, supervision, administration, personnel; plant influent and effluent sampling and laboratory testing; equipment operation, maintenance, servicing, repair and replacement; system monitoring and operation; data recording, markups of plant as built, management and reporting; quality control; capital improvements; vehicles and vehicle fleet management, operation, maintenance and repair; housekeeping; grounds maintenance; consumable supplies including chemicals, and other services related to the operation and maintenance of the SBIWTP.

The SBIWTP is a twenty five (25) million gallon per day (MGD) wastewater treatment plant located at 2995 Clearwater Way, in San Diego, California, San Diego County, north of the International Boundary, and near the intersections of Monument and Dairy Mart Roads. The Construction of the plant's advanced primary treatment phase was completed on September 27, 1997 and the construction of secondary treatment phase was completed on January 2011. The plant is treating wastewater originating in Tijuana, Baja California, Mexico and the SBIWTP is operated under the authority of the United States Section, International Boundary and Water Commission (USIBWC). An average of twenty five million gallons per day (25 MGD) of effluent is being discharged through the South Bay Ocean Outfall (SBOO), and is subject to the requirements of the National Pollutant Discharge Elimination System (NPDES) Permit, Permit Number CA0108928, Order Number R9-2014-0009.

There will be a thirty (30) day phase-in period from September 1, 2015 to September 30, 2015. The Contract will consist of a Base Year from October 1, 2015 through September 30, 2016 plus four (4) one year option periods. This will be an unrestricted procurement under the NAICS code 221320 (Sewage Treatment Facilities), size standard is $20.5 million.

Update #1 ·

Added: Feb 17, 2015 4:06 pm THIS IS A PRESOLICITATION NOTICE. PLEASE DO NOT CONTACT US WITH QUESTIONS. QUESTIONS WILL NOT BE ANSWERED AT THIS TIME. QUESTIONS WILL BE ANSWERED DURING THE SOLICITATION PHASE OF THE REQUIREMENT.

The United States Section of the International Boundary and Water Commission (USIBWC), has a requirement for a firm fixed price, non personal services contract for the operation and maintenance (O&M) of the South Bay International Wastewater Treatment Plant (SBIWTP) and facilities located in San Diego County, California.

The Contractor shall provide, all labor, material, management and other resources required to perform full service O&M of the SBIWTP and South Bay Land Outfall (SBLO). Full service operation and maintenance is defined as complete facility operation and maintenance, including but not limited to providing day-to-day contract management, planning, supervision, administration, personnel; plant influent and effluent sampling and laboratory testing; equipment operation, maintenance, servicing, repair and replacement; system monitoring and operation; data recording, markups of plant as built, management and reporting; quality control; capital improvements; vehicles and vehicle fleet management, operation, maintenance and repair; housekeeping; grounds maintenance; consumable supplies including chemicals, and other services related to the operation and maintenance of the SBIWTP.

The SBIWTP is a twenty five (25) million gallon per day (MGD) wastewater treatment plant located at 2995 Clearwater Way, in San Diego, California, San Diego County, north of the International Boundary, and near the intersections of Monument and Dairy Mart Roads. The Construction of the plant's advanced primary treatment phase was completed on September 27, 1997 and the construction of secondary treatment phase was completed on January 2011. The plant is treating wastewater originating in Tijuana, Baja California, Mexico and the SBIWTP is operated under the authority of the United States Section, International Boundary and Water Commission (USIBWC). An average of twenty five million gallons per day (25 MGD) of effluent is being discharged through the South Bay Ocean Outfall (SBOO), and is subject to the requirements of the National Pollutant Discharge Elimination System (NPDES) Permit, Permit Number CA0108928, Order Number R9-2014-0009; the California Regional Water Quality Control Board (CRWQCB) Monitoring and Reporting Program, Number: R9-2014-0009; and the California Ocean Plan.

There will be a thirty (30) day transition period from September 1, 2015 to September 30, 2015. The Contract will consist of a Base Year from October 1, 2015 through September 30, 2016 plus four (4) one year option periods. This will be an unrestricted procurement under the NAICS code 221320 (Sewage Treatment Facilities), size standard is $20.5 million.

Attachments

Files attached to this notice, newest first
File Type Posted
Amendment_A002.pdf PDF
Questions_ _Answers.docx DOCX document
Attachment_1_--_FINAL_PWS_04-20-2015_(A002).docx DOCX document
Attachment_1_--_FINAL_PWS_04-10-2015_(A001).docx DOCX document
Amendment_A001.pdf PDF
Sign-In_Sheet.PDF PDF
Questions_ _Answers.docx DOCX document
Attachment_6_--_SBIWTP_Plant_Site_ _Gen_Location_Map.pdf PDF
Attachment_14_--_San_Diego_Upgrade_Strategy_DRAFT.docx DOCX document
Attachment_7_--_SBIWTP_Monthly_Flow_Rpt_FY14.pdf PDF
Attachment_2_--_Required_Performance_Metrics.docx DOCX document
Attachment_4_--_SBIWTP_O M_History_FY14_(a)_(Section_C.2.3).pdf PDF
Attachment_8_--_WD_05-2057_(Rev.-16).pdf PDF
Attachment_11_--_SBIWTP_Monthly_Maintenance_Expense_FY14.pdf PDF
Attachment_13_--_Storm_Water_Permit_and_General_Order_No._2014-0057-DWQ.pdf PDF
Attachment_5_--_SBIWTP_O M_History_FY14_(b)_(Section_C.2.3).pdf PDF
Attachment_10_--_Annual_Equipment_Inventory_FY14.pdf PDF
Attachment_15_-_508.docx DOCX document
Attachment_9_-_IBWC_FORM_99.pdf PDF
Attachment_12_--_SBIWTP_List_of_Permits_and_Fees.pdf PDF
Attachment_1_--_FINAL_PWS_02-24-2015.docx DOCX document
Attachment_3_--_Order_No._R9-2014-0009.pdf PDF
IBM15R0001_FINAL.pdf PDF
Show all 23

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity