Oahe bridge crane rehab
Awarded Award Notice Posted
- Solicitation number
- w9128F-17-R-0011
- Agency
- ENDIST Omaha US Army Corps of Engineers, Department of Defense
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- W9128F18C0002 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- Pierre South Dakota Oahe dam Pierre, South Dakota 57501, United States
Notice details come from SAM.gov. Updated .
Notice text
6 versions
Update #6 · Latest ·
Added: Sep 06, 2017 5:33 pm ProjNet has been re-opened for questions and will be closed on 11 September 2017 at 4:30pm (CDT)
Update #5 ·
Added: Aug 14, 2017 3:22 pm
The site visit sign in sheet has been uploaded.
Update #4 ·
Added: Aug 08, 2017 8:54 pm Amendment 0001 and associated drawings have been added.
Update #3 ·
Added: Apr 20, 2017 5:18 pm
Modified: Jul 28, 2017 6:27 pmTrack Changes
Magnitude of construction is estimated between 1 million and 5 million. This project is a 100% small business set-aside with proposals due 29 August 2017.
Oahe Bridge Crane Pre-solicitation Notice
General
This work covers the design, fabrication, install, and commissioning for a general electrical and mechanical rehabilitation and load testing of two 250 ton overhead bridge cranes located at Oahe Powerhouse. In addition three below the hook (BTH) lifting devices will be NDT inspected and load tested as part of the contract. Each bridge crane has two trolleys with a main hoist of 125 tons and an aux hoist of 25 tons. The two bridge cranes operate in tandem for a total lift capacity of 500 tons using a 500 ton rated lifting beam. Rehabilitation work can occur either on site or crane can be removed from site. The cranes current lift capacity will remain the same.
Mechanical
All existing brakes for the main hoist, aux hoist and the bridge and trolley drive will be replaced. Second holding brakes will be added to the main and aux hoist. All main and aux hoist gearboxes shall be replaced with new along with new machinery bases. All motor couplings will be replaced. All gearboxes will have split lip seals installed. The existing drums and final open gear reduction will be reused.
Electrical
All electrical components will be removed from the cranes including main line conductors, drive motors, controls, cabinets, lights and other misc. equipment.
New motors and VFD's will be installed in addition to a new cable festoon system for the trolley. The existing bus rail for bridge travel will also be replaced to meet new code requirements. The new cab will be installed with new electrical equipment (panels and step-down transformers).
New load cells with HMI readouts will be added to the crane.
Structural
The existing trolley rail running the length of the bridge girders shall be removed and replaced along with associated hardware.
The existing open cab shall be removed and replaced with a new closed cab design
Minor extension of existing trolley frame will be required for machinery access.
Lead based paint abatement will be required for trolley.
Load Testing
Solicitation will include the load testing of each individual crane at 250 tons and load testing of the cranes in tandem at 500 tons at 100% capacity and 125% capacity. Two 250 ton lifting beams and one 500 ton lifting beam will also be load tested up to 125% capacity
Update #2 ·
Added: Apr 20, 2017 5:18 pm
magnitude of construction is estimated between 1 million and 5 million.
Oahe Bridge Crane Pre-solicitation Notice
General
This work covers the design, fabrication, install, and commissioning for a general electrical and mechanical rehabilitation and load testing of two 250 ton overhead bridge cranes located at Oahe Powerhouse. In addition three below the hook (BTH) lifting devices will be NDT inspected and load tested as part of the contract. Each bridge crane has two trolleys with a main hoist of 125 tons and an aux hoist of 25 tons. The two bridge cranes operate in tandem for a total lift capacity of 500 tons using a 500 ton rated lifting beam. Rehabilitation work can occur either on site or crane can be removed from site. The cranes current lift capacity will remain the same.
Mechanical
All existing brakes for the main hoist, aux hoist and the bridge and trolley drive will be replaced. Second holding brakes will be added to the main and aux hoist. All main and aux hoist gearboxes shall be replaced with new along with new machinery bases. All motor couplings will be replaced. All gearboxes will have split lip seals installed. The existing drums and final open gear reduction will be reused.
Electrical
All electrical components will be removed from the cranes including main line conductors, drive motors, controls, cabinets, lights and other misc. equipment.
New motors and VFD's will be installed in addition to a new cable festoon system for the trolley. The existing bus rail for bridge travel will also be replaced to meet new code requirements. The new cab will be installed with new electrical equipment (panels and step-down transformers).
New load cells with HMI readouts will be added to the crane.
Structural
The existing trolley rail running the length of the bridge girders shall be removed and replaced along with associated hardware.
The existing open cab shall be removed and replaced with a new closed cab design
Minor extension of existing trolley frame will be required for machinery access.
Lead based paint abatement will be required for trolley.
Load Testing
Solicitation will include the load testing of each individual crane at 250 tons and load testing of the cranes in tandem at 500 tons at 100% capacity and 125% capacity. Two 250 ton lifting beams and one 500 ton lifting beam will also be load tested up to 125% capacity
Update #1 ·
Added: Apr 20, 2017 4:56 pm
Oahe Bridge Crane Pre-solicitation Notice
General
This work covers the design, fabrication, install, and commissioning for a general electrical and mechanical rehabilitation and load testing of two 250 ton overhead bridge cranes located at Oahe Powerhouse. In addition three below the hook (BTH) lifting devices will be NDT inspected and load tested as part of the contract. Each bridge crane has two trolleys with a main hoist of 125 tons and an aux hoist of 25 tons. The two bridge cranes operate in tandem for a total lift capacity of 500 tons using a 500 ton rated lifting beam. Rehabilitation work can occur either on site or crane can be removed from site. The cranes current lift capacity will remain the same.
Mechanical
All existing brakes for the main hoist, aux hoist and the bridge and trolley drive will be replaced. Second holding brakes will be added to the main and aux hoist. All main and aux hoist gearboxes shall be replaced with new along with new machinery bases. All motor couplings will be replaced. All gearboxes will have split lip seals installed. The existing drums and final open gear reduction will be reused.
Electrical
All electrical components will be removed from the cranes including main line conductors, drive motors, controls, cabinets, lights and other misc. equipment.
New motors and VFD's will be installed in addition to a new cable festoon system for the trolley. The existing bus rail for bridge travel will also be replaced to meet new code requirements. The new cab will be installed with new electrical equipment (panels and step-down transformers).
New load cells with HMI readouts will be added to the crane.
Structural
The existing trolley rail running the length of the bridge girders shall be removed and replaced along with associated hardware.
The existing open cab shall be removed and replaced with a new closed cab design
Minor extension of existing trolley frame will be required for machinery access.
Lead based paint abatement will be required for trolley.
Load Testing
Solicitation will include the load testing of each individual crane at 250 tons and load testing of the cranes in tandem at 500 tons at 100% capacity and 125% capacity. Two 250 ton lifting beams and one 500 ton lifting beam will also be load tested up to 125% capacity.
Attachments
| File | Type | Posted |
|---|---|---|
| Am0006.pdf | ||
| Am0005.pdf | ||
| Am0004_Dwgs.pdf | ||
| Am0004.pdf | ||
| Record_of_attendance_(2nd_Site_Visit).pdf | ||
| Am0003.pdf | ||
| Record_of_attendance.pdf | ||
| Am0002.pdf | ||
| Am0001.pdf | ||
| Record_of_attendance.pdf | ||
| Am0001.pdf | ||
| Reference_Drawings_FIO.pdf | ||
| Bridge_Crane_Oahe_Specs.pdf | ||
| Oahe_Bridge_Crane_-_F_size_dwgs_-_FINAL_6-13-2017.pdf |
Show all 14
Notice history
| Notice | Type | Posted |
|---|---|---|
| Rehabilitation of Powerhouse Bridge Crane at Oahe Dam, SD | Award Notice | |
| Oahe bridge crane rehab | Award Notice | |
| bridge crane rehab Oahe Dam | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity