Awarded Award Notice Posted

Solicitation number
w9128F-17-R-0011
Agency
ENDIST Omaha US Army Corps of Engineers, Department of Defense
Awarded
to Washington Equipment Manufacturing Company, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
W9128F18C0002 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Pierre South Dakota Oahe dam Pierre, South Dakota 57501, United States

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

Added: Sep 06, 2017 5:33 pm ProjNet has been re-opened for questions and will be closed on 11 September 2017 at 4:30pm (CDT)

Update #5 ·

Added: Aug 14, 2017 3:22 pm

The site visit sign in sheet has been uploaded.

Update #4 ·

Added: Aug 08, 2017 8:54 pm Amendment 0001 and associated drawings have been added.

Update #3 ·

Added: Apr 20, 2017 5:18 pm Modified: Jul 28, 2017 6:27 pmTrack Changes Magnitude of construction is estimated between 1 million and 5 million.  This project is a 100% small business set-aside with proposals due 29 August 2017. 

Oahe Bridge Crane Pre-solicitation Notice

General
This work covers the design, fabrication, install, and commissioning for a general electrical and mechanical rehabilitation and load testing of two 250 ton overhead bridge cranes located at Oahe Powerhouse. In addition three below the hook (BTH) lifting devices will be NDT inspected and load tested as part of the contract. Each bridge crane has two trolleys with a main hoist of 125 tons and an aux hoist of 25 tons. The two bridge cranes operate in tandem for a total lift capacity of 500 tons using a 500 ton rated lifting beam. Rehabilitation work can occur either on site or crane can be removed from site. The cranes current lift capacity will remain the same.


Mechanical
All existing brakes for the main hoist, aux hoist and the bridge and trolley drive will be replaced. Second holding brakes will be added to the main and aux hoist. All main and aux hoist gearboxes shall be replaced with new along with new machinery bases. All motor couplings will be replaced. All gearboxes will have split lip seals installed. The existing drums and final open gear reduction will be reused.



Electrical
All electrical components will be removed from the cranes including main line conductors, drive motors, controls, cabinets, lights and other misc. equipment.
New motors and VFD's will be installed in addition to a new cable festoon system for the trolley. The existing bus rail for bridge travel will also be replaced to meet new code requirements. The new cab will be installed with new electrical equipment (panels and step-down transformers).


New load cells with HMI readouts will be added to the crane.


Structural
The existing trolley rail running the length of the bridge girders shall be removed and replaced along with associated hardware.
The existing open cab shall be removed and replaced with a new closed cab design
Minor extension of existing trolley frame will be required for machinery access.
Lead based paint abatement will be required for trolley.


Load Testing


Solicitation will include the load testing of each individual crane at 250 tons and load testing of the cranes in tandem at 500 tons at 100% capacity and 125% capacity. Two 250 ton lifting beams and one 500 ton lifting beam will also be load tested up to 125% capacity

Update #2 ·

Added: Apr 20, 2017 5:18 pm magnitude of construction is estimated between 1 million and 5 million.

Oahe Bridge Crane Pre-solicitation Notice

General
This work covers the design, fabrication, install, and commissioning for a general electrical and mechanical rehabilitation and load testing of two 250 ton overhead bridge cranes located at Oahe Powerhouse. In addition three below the hook (BTH) lifting devices will be NDT inspected and load tested as part of the contract. Each bridge crane has two trolleys with a main hoist of 125 tons and an aux hoist of 25 tons. The two bridge cranes operate in tandem for a total lift capacity of 500 tons using a 500 ton rated lifting beam. Rehabilitation work can occur either on site or crane can be removed from site. The cranes current lift capacity will remain the same.


Mechanical
All existing brakes for the main hoist, aux hoist and the bridge and trolley drive will be replaced. Second holding brakes will be added to the main and aux hoist. All main and aux hoist gearboxes shall be replaced with new along with new machinery bases. All motor couplings will be replaced. All gearboxes will have split lip seals installed. The existing drums and final open gear reduction will be reused.



Electrical
All electrical components will be removed from the cranes including main line conductors, drive motors, controls, cabinets, lights and other misc. equipment.
New motors and VFD's will be installed in addition to a new cable festoon system for the trolley. The existing bus rail for bridge travel will also be replaced to meet new code requirements. The new cab will be installed with new electrical equipment (panels and step-down transformers).


New load cells with HMI readouts will be added to the crane.


Structural
The existing trolley rail running the length of the bridge girders shall be removed and replaced along with associated hardware.
The existing open cab shall be removed and replaced with a new closed cab design
Minor extension of existing trolley frame will be required for machinery access.
Lead based paint abatement will be required for trolley.


Load Testing


Solicitation will include the load testing of each individual crane at 250 tons and load testing of the cranes in tandem at 500 tons at 100% capacity and 125% capacity. Two 250 ton lifting beams and one 500 ton lifting beam will also be load tested up to 125% capacity

Update #1 ·

Added: Apr 20, 2017 4:56 pm Oahe Bridge Crane Pre-solicitation Notice

General
This work covers the design, fabrication, install, and commissioning for a general electrical and mechanical rehabilitation and load testing of two 250 ton overhead bridge cranes located at Oahe Powerhouse. In addition three below the hook (BTH) lifting devices will be NDT inspected and load tested as part of the contract. Each bridge crane has two trolleys with a main hoist of 125 tons and an aux hoist of 25 tons. The two bridge cranes operate in tandem for a total lift capacity of 500 tons using a 500 ton rated lifting beam. Rehabilitation work can occur either on site or crane can be removed from site. The cranes current lift capacity will remain the same.


Mechanical
All existing brakes for the main hoist, aux hoist and the bridge and trolley drive will be replaced. Second holding brakes will be added to the main and aux hoist. All main and aux hoist gearboxes shall be replaced with new along with new machinery bases. All motor couplings will be replaced. All gearboxes will have split lip seals installed. The existing drums and final open gear reduction will be reused.



Electrical
All electrical components will be removed from the cranes including main line conductors, drive motors, controls, cabinets, lights and other misc. equipment.
New motors and VFD's will be installed in addition to a new cable festoon system for the trolley. The existing bus rail for bridge travel will also be replaced to meet new code requirements. The new cab will be installed with new electrical equipment (panels and step-down transformers).


New load cells with HMI readouts will be added to the crane.


Structural
The existing trolley rail running the length of the bridge girders shall be removed and replaced along with associated hardware.
The existing open cab shall be removed and replaced with a new closed cab design
Minor extension of existing trolley frame will be required for machinery access.
Lead based paint abatement will be required for trolley.


Load Testing


Solicitation will include the load testing of each individual crane at 250 tons and load testing of the cranes in tandem at 500 tons at 100% capacity and 125% capacity. Two 250 ton lifting beams and one 500 ton lifting beam will also be load tested up to 125% capacity.

Attachments

Files attached to this notice, newest first
File Type Posted
Am0006.pdf PDF
Am0005.pdf PDF
Am0004_Dwgs.pdf PDF
Am0004.pdf PDF
Record_of_attendance_(2nd_Site_Visit).pdf PDF
Am0003.pdf PDF
Record_of_attendance.pdf PDF
Am0002.pdf PDF
Am0001.pdf PDF
Record_of_attendance.pdf PDF
Am0001.pdf PDF
Reference_Drawings_FIO.pdf PDF
Bridge_Crane_Oahe_Specs.pdf PDF
Oahe_Bridge_Crane_-_F_size_dwgs_-_FINAL_6-13-2017.pdf PDF
Show all 14

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Rehabilitation of Powerhouse Bridge Crane at Oahe Dam, SD Latest Award Notice
Oahe bridge crane rehab This notice Award Notice
bridge crane rehab Oahe Dam Original Award Notice

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity