About this opportunity
The U.S. Army Corps of Engineers Northwestern Division - Seattle District issued this Special Notice to announce a Virtual Industry Day for the Ediz Hook Beach Nourishment Project in Port Angeles, Washington. The industry day was scheduled for September 5, 2025, from 10:00 AM to 10:30 AM PDT to provide information and gather feedback from potential contractors. The project involves procuring and placing up to 40,000 tons of 6 to 12-inch minus rounded cobble along the seaward toe of the Ediz Hook armor stone revetment to a height of +12 feet Mean Lower Low Water. Construction is expected to occur in one season lasting 4-8 weeks, with an estimated contract value between $1,000,000 and $5,000,000. The work is classified under NAICS code 237990 (Other Heavy and Civil Engineering Construction).
The primary purpose of this Special Notice is to identify qualified, experienced sources capable of performing beach nourishment construction work and to solicit industry input on project considerations. Key project requirements include using land-based equipment exclusively, temporarily removing and stockpiling existing armor stone for access, and rebuilding the revetment upon completion of nourishment activities. Critical deadlines include project start on July 16, 2026, completion of all work below the High Tide Line by September 30, 2026, and final project completion including cleanup by October 15, 2026. The government is considering this as a small business set-aside opportunity, with NAICS code 237990 determining small business eligibility criteria. Contractors must demonstrate capability in beach nourishment projects and provide rock quality testing including gradation tests and weigh scale tickets, with the anticipated solicitation release in December 2025 or January 2026.
Notice text
2 versions
Update #2 · Latest ·
AGENCY/OFFICE: U.S. Army Corps of Engineers
LOCATION: USACE Northwestern Division – Seattle (NWS) District
TITLE: INDUSTRY DAY – Ediz Hook Beach Nourishment Project
LOCATION: Virtual - information provided below.
DATE: 05 September 2025
TIME: 10:00 AM to 10:30 AM PDT
DESCRIPTION:
The United States Army Corps of Engineers (USACE), Northwestern Division - Seattle District (NWS) is hosting a Virtual Industry Day event to provide additional information and gain feedback from industry on the Ediz Hook Beach Nourishment project in Port Angeles, Washington. The Government is seeking qualified, experienced sources capable of performing this type of project.
The agency has been tasked to solicit for and award a construction contract to procure and place beach nourishment fill material along the seaward toe of the Ediz Hook armor stone revetment to a height of +12 ft Mean Lower Low Water (MLLW). Up to 40,000 tons of 6 to 12” minus rounded cobble is expected to be placed within a 2,900 ft zone along the revetment. Construction will occur in one season and is expected to last 4-8 weeks based on available funding.
Access to repair area would occur over existing roads and over the armored slope of the revetment near the east end of the paper mill near Sta. 151+00. Contractor must temporarily remove and stockpile armor stone to facilitate to the repair area. Upon completion of beach nourishment placement activities, contractor must rebuild the revetment using the stockpiled armor stone.
All work (transport and placement) must be performed using land-based equipment. Work is anticipated to begin 16 July 2026. All construction activity below the High Tide Line must be complete by 30 September 2026. The entire project, including cleanup of the premises, must be complete by 15 October 2026.
In accordance with Federal Acquisition Regulation (FAR) Part 36, the estimated construction price range for this project is: Between $1,000,000 and $5,000,000. Estimated duration of the actual construction activities is 4-8 weeks.
The VIRTUAL Industry Day Event will take place on 05 September 2022 at 10:00 AM PDT via Teams. Below is the link to join this meeting.
https://dod.teams.microsoft.us/l/meetup-join/19%3adod%3ameeting_dc569b2535cb40d395efb2281f2e98c5%40thread.v2/0?context=%7b%22Tid%22%3a%22fc4d76ba-f17c-4c50-b9a7-8f3163d27582%22%2c%22Oid%22%3a%22d7bba062-d8ea-4476-9299-c1e9adc8b209%22%7d
Meeting ID: 993 130 529 665
Passcode: Cb35WY7T
If you would like to provide feedback for consideration on the documents, please provide them by email to: Mckenna Rain, Contract Specialist, at Mckenna.T.Rain@usace.army.mil by 12 September 2025, 12:00 PM PDT.
Small Business Program Inquiries:
Enshane Hill-Nomoto: Enshane.Nomoto@usace.army.mil
https://www.nws.usace.army.mil/Business-With-Us/Small-Business/
Thank you for your interest in this USACE project.
Update #1 ·
AGENCY/OFFICE: U.S. Army Corps of Engineers
LOCATION: USACE Northwestern Division – Seattle (NWS) District
TITLE: INDUSTRY DAY – Ediz Hook Beach Nourishment Project
LOCATION: Virtual - information provided below.
DATE: 05 September 2025
TIME: 10:00 AM to 10:30 AM PDT
DESCRIPTION:
The United States Army Corps of Engineers (USACE), Northwestern Division - Seattle District (NWS) is hosting a Virtual Industry Day event to provide additional information and gain feedback from industry on the Ediz Hook Beach Nourishment project in Port Angeles, Washington. The Government is seeking qualified, experienced sources capable of performing this type of project.
The agency has been tasked to solicit for and award a construction contract to procure and place beach nourishment fill material along the seaward toe of the Ediz Hook armor stone revetment to a height of +12 ft Mean Lower Low Water (MLLW). Up to 40,000 tons of 6 to 12” minus rounded cobble is expected to be placed within a 2,900 ft zone along the revetment. Construction will occur in one season and is expected to last 4-8 weeks based on available funding.
Access to repair area would occur over existing roads and over the armored slope of the revetment near the east end of the paper mill near Sta. 151+00. Contractor must temporarily remove and stockpile armor stone to facilitate to the repair area. Upon completion of beach nourishment placement activities, contractor must rebuild the revetment using the stockpiled armor stone.
All work (transport and placement) must be performed using land-based equipment. Work is anticipated to begin 16 July 2026. All construction activity below the High Tide Line must be complete by 30 September 2026. The entire project, including cleanup of the premises, must be complete by 15 October 2026.
In accordance with Federal Acquisition Regulation (FAR) Part 36, the estimated construction price range for this project is: Between $1,000,000 and $5,000,000. Estimated duration of the actual construction activities is 4-8 weeks.
The VIRTUAL Industry Day Event will take place on 05 September 2022 at 10:00 AM PDT via Teams. Below is the link to join this meeting.
https://dod.teams.microsoft.us/l/meetup-join/19%3adod%3ameeting_dc569b2535cb40d395efb2281f2e98c5%40thread.v2/0?context=%7b%22Tid%22%3a%22fc4d76ba-f17c-4c50-b9a7-8f3163d27582%22%2c%22Oid%22%3a%22d7bba062-d8ea-4476-9299-c1e9adc8b209%22%7d
Meeting ID: 993 130 529 665
Passcode: Cb35WY7T
If you would like to provide feedback for consideration on the documents, please provide them by email to: Mckenna Rain, Contract Specialist, at Mckenna.T.Rain@usace.army.mil by 12 September 2025, 12:00 PM PDT.
Small Business Program Inquiries:
Enshane Hill-Nomoto: Enshane.Nomoto@usace.army.mil
https://www.nws.usace.army.mil/Business-With-Us/Small-Business/
Thank you for your interest in this USACE project.
Files
| File | Type | Posted |
|---|---|---|
| Ediz Hook Industry Day Slides.pdf | ||
| IndustryDay_Follow-up.docx | DOCX document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| FY26 Willapa Harbor Maintenance Dredging | ENDIST Seattle | No set-aside | |
| USCG Station at Cape Disappointment | ENDIST Portland | No set-aside | |
| St. Lucie South Jetty Repair Industry Day | ENDIST Jacksonville | No set-aside | |
| Virtual Industry Day for FY27 USACE Enterprise Dredge Delivery Center National Small Business MATOC | ENDIST Wilmington | Total Small Business | |
| James River Dredging Industry Day-Post Event Docs | ENDIST Norfolk | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity