5 versions
Update #5 · Latest ·
The Reason for this Amendment is to:
1.) Include the government’s response to RFI’s / PPI’s
2.) Provide additional pictures as requested
3.) Provide an extension date on the RFQ to 25 FEB 22 Close of Business (COB) 1700 Eastern Standard Time (EST)
Please see link below for some already added photos from the site visit.
https://cac.piee.eb.mil/sol/xhtml/auth/offer/viewSolicitationRFPWithOffer.xhtml
CLIN 0001 HARLINGEN HURRICANE DAMAGE REPAIRS FFP1. GENERAL DESCRIPTION: The Department of the Navy has a requirement to replace roof flashing, reseal glass block wall, replace carpet tiles, ceiling tiles, drywall and mortar splits and cracks throughout the Main Building and the Motor Pool Building due to Hurricane Hannah. The work is located at the Naval Reserve Center, N.O.S.C. (Navy Operational Support Center), Harlingen, Texas. See Attachment A for project locations2. The Contractor shall provide all supervision, transportation, labor, materials, equipment and incidental work necessary to reseal glass block wall, replace carpet tiles, ceiling tiles, drywall and mortar splits and cracks throughout the Main Building and the Motor Pool Building due to Hurricane Hannah. See paragraph 5 for detailed statement work. The contractor shall comply with UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System for the administration of this contract. See Paragraph 15 for specifics. CLIN 0002 Replace Post Indicator Valve FFP The Contractor shall provide all supervision, transportation, labor, materials, equipment and incidental work necessary to post indictor valve and clean sprinkler heads located at Navy Operational Support Center Harlingen, Texas. See paragraph 4 for detailed statement work. CLIN 0003 Replace Main Water Supply Line FFP The Contractor shall provide all supervision, transportation, labor, materials, equipment and incidental work necessary to meet the scope of work as written in paragraph 5. Excavate and expose around main water valve on the West side of building, continue to excavate parallel to the building approximately 15 feet and then straight at the building approximately 30 feet. Install new type L copper line prior to running line in ditch, saw cut, break and remove approximately 2 square yards of concrete sidewalk. Sidewalk shall be restored to original condition after pipe installation. Core drill 3 inch hole on the west wall of the building. Hole to accommodate 3-inch copper line. Run new 3-inch copper piping adjacent to the exterior wall of the hazardous substance room and extend to the existing 3-inch line in the mechanical room. Tie in the 3-inch line to the existing cut-off valve. FOB: Destination PURCHASE REQUEST NUMBER: 5901605PSC CD: Z2NE *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=N6945022Q0005' to obtain more details.*
Update #4 ·
The Reason for this Amendment is to give 10 calendar business days from 16 February 2022 for PPI questions to clarify the site visit and to add additional pictures taken at the site visit.
CLIN 0001 HARLINGEN HURRICANE DAMAGE REPAIRS FFP1. GENERAL DESCRIPTION: The Department of the Navy has a requirement to replace roof flashing, reseal glass block wall, replace carpet tiles, ceiling tiles, drywall and mortar splits and cracks throughout the Main Building and the Motor Pool Building due to Hurricane Hannah. The work is located at the Naval Reserve Center, N.O.S.C. (Navy Operational Support Center), Harlingen, Texas. See Attachment A for project locations2. The Contractor shall provide all supervision, transportation, labor, materials, equipment and incidental work necessary to reseal glass block wall, replace carpet tiles, ceiling tiles, drywall and mortar splits and cracks throughout the Main Building and the Motor Pool Building due to Hurricane Hannah. See paragraph 5 for detailed statement work. The contractor shall comply with UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System for the administration of this contract. See Paragraph 15 for specifics. CLIN 0002 Replace Post Indicator Valve FFP The Contractor shall provide all supervision, transportation, labor, materials, equipment and incidental work necessary to post indictor valve and clean sprinkler heads located at Navy Operational Support Center Harlingen, Texas. See paragraph 4 for detailed statement work. CLIN 0003 Replace Main Water Supply Line FFP The Contractor shall provide all supervision, transportation, labor, materials, equipment and incidental work necessary to meet the scope of work as written in paragraph 5. Excavate and expose around main water valve on the West side of building, continue to excavate parallel to the building approximately 15 feet and then straight at the building approximately 30 feet. Install new type L copper line prior to running line in ditch, saw cut, break and remove approximately 2 square yards of concrete sidewalk. Sidewalk shall be restored to original condition after pipe installation. Core drill 3 inch hole on the west wall of the building. Hole to accommodate 3-inch copper line. Run new 3-inch copper piping adjacent to the exterior wall of the hazardous substance room and extend to the existing 3-inch line in the mechanical room. Tie in the 3-inch line to the existing cut-off valve. FOB: Destination PURCHASE REQUEST NUMBER: 5901605PSC CD: Z2NE *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=N6945022Q0005' to obtain more details.*
Update #3 ·
The Reason for this Amendment is to give 10 calendar business days from 16 February 2022 for PPI questions to clarify the site visit and to add additional pictures taken at the site visit.CLIN 0001 HARLINGEN HURRICANE DAMAGE REPAIRS FFP1. GENERAL DESCRIPTION: The Department of the Navy has a requirement to replace roof flashing, reseal glass block wall, replace carpet tiles, ceiling tiles, drywall and mortar splits and cracks throughout the Main Building and the Motor Pool Building due to Hurricane Hannah. The work is located at the Naval Reserve Center, N.O.S.C. (Navy Operational Support Center), Harlingen, Texas. See Attachment A for project locations2. The Contractor shall provide all supervision, transportation, labor, materials, equipment and incidental work necessary to reseal glass block wall, replace carpet tiles, ceiling tiles, drywall and mortar splits and cracks throughout the Main Building and the Motor Pool Building due to Hurricane Hannah. See paragraph 5 for detailed statement work. The contractor shall comply with UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System for the administration of this contract. See Paragraph 15 for specifics. CLIN 0002 Replace Post Indicator Valve FFP The Contractor shall provide all supervision, transportation, labor, materials, equipment and incidental work necessary to post indictor valve and clean sprinkler heads located at Navy Operational Support Center Harlingen, Texas. See paragraph 4 for detailed statement work. CLIN 0003 Replace Main Water Supply Line FFP The Contractor shall provide all supervision, transportation, labor, materials, equipment and incidental work necessary to meet the scope of work as written in paragraph 5. Excavate and expose around main water valve on the West side of building, continue to excavate parallel to the building approximately 15 feet and then straight at the building approximately 30 feet. Install new type L copper line prior to running line in ditch, saw cut, break and remove approximately 2 square yards of concrete sidewalk. Sidewalk shall be restored to original condition after pipe installation. Core drill 3 inch hole on the west wall of the building. Hole to accommodate 3-inch copper line. Run new 3-inch copper piping adjacent to the exterior wall of the hazardous substance room and extend to the existing 3-inch line in the mechanical room. Tie in the 3-inch line to the existing cut-off valve. FOB: Destination PURCHASE REQUEST NUMBER: 5901605PSC CD: Z2NE *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=N6945022Q0005' to obtain more details.*
Update #2 ·
CLIN 0001 HARLINGEN HURRICANE DAMAGE REPAIRS FFP1. GENERAL DESCRIPTION: The Department of the Navy has a requirement to replace roof flashing, reseal glass block wall, replace carpet tiles, ceiling tiles, drywall and mortar splits and cracks throughout the Main Building and the Motor Pool Building due to Hurricane Hannah. The work is located at the Naval Reserve Center, N.O.S.C. (Navy Operational Support Center), Harlingen, Texas. See Attachment A for project locations2. The Contractor shall provide all supervision, transportation, labor, materials, equipment and incidental work necessary to reseal glass block wall, replace carpet tiles, ceiling tiles, drywall and mortar splits and cracks throughout the Main Building and the Motor Pool Building due to Hurricane Hannah. See paragraph 5 for detailed statement work. The contractor shall comply with UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System for the administration of this contract. See Paragraph 15 for specifics.
CLIN 0002 Replace Post Indicator Valve FFPThe Contractor shall provide all supervision, transportation, labor, materials, equipment and incidental work necessary to post indictor valve and clean sprinkler heads located at Navy Operational Support Center Harlingen, Texas. See paragraph 4 for detailed statement work.
CLIN 0003 Replace Main Water Supply Line FFPThe Contractor shall provide all supervision, transportation, labor, materials, equipment and incidental work necessary to meet the scope of work as written in paragraph 5. Excavate and expose around main water valve on the West side of building, continue to excavate parallel to the building approximately 15 feet and then straight at the building approximately 30 feet. Install new type L copper line prior to running line in ditch, saw cut, break and remove approximately 2 square yards of concrete sidewalk. Sidewalk shall be restored to original condition after pipe installation. Core drill 3 inch hole on the west wall of the building. Hole to accommodate 3-inch copper line. Run new 3-inch copper piping adjacent to the exterior wall of the hazardous substance room and extend to the existing 3-inch line in the mechanical room. Tie in the 3-inch line to the existing cut-off valve.FOB: DestinationPURCHASE REQUEST NUMBER: 5901605PSC CD: Z2NE *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=N6945022Q0005' to obtain more details.*
Update #1 ·
CLIN 0001 HARLINGEN HURRICANE DAMAGE REPAIRS FFP1. GENERAL DESCRIPTION: The Department of the Navy has a requirement to replace roof flashing, reseal glass block wall, replace carpet tiles, ceiling tiles, drywall and mortar splits and cracks throughout the Main Building and the Motor Pool Building due to Hurricane Hannah. The work is located at the Naval Reserve Center, N.O.S.C. (Navy Operational Support Center), Harlingen, Texas. See Attachment A for project locations2. The Contractor shall provide all supervision, transportation, labor, materials, equipment and incidental work necessary to reseal glass block wall, replace carpet tiles, ceiling tiles, drywall and mortar splits and cracks throughout the Main Building and the Motor Pool Building due to Hurricane Hannah. See paragraph 5 for detailed statement work. The contractor shall comply with UFGS 01 31 23.13 20 Electronic Construction and Facility Support Contract Management System for the administration of this contract. See Paragraph 15 for specifics.CLIN 0002 Replace Post Indicator Valve FFPThe Contractor shall provide all supervision, transportation, labor, materials, equipment and incidental work necessary to post indictor valve and clean sprinkler heads located at Navy Operational Support Center Harlingen, Texas. See paragraph 4 for detailed statement work.CLIN 0003 Replace Main Water Supply Line FFPThe Contractor shall provide all supervision, transportation, labor, materials, equipment and incidental work necessary to meet the scope of work as written in paragraph 5. Excavate and expose around main water valve on the West side of building, continue to excavate parallel to the building approximately 15 feet and then straight at the building approximately 30 feet. Install new type L copper line prior to running line in ditch, saw cut, break and remove approximately 2 square yards of concrete sidewalk. Sidewalk shall be restored to original condition after pipe installation. Core drill 3 inch hole on the west wall of the building. Hole to accommodate 3-inch copper line. Run new 3-inch copper piping adjacent to the exterior wall of the hazardous substance room and extend to the existing 3-inch line in the mechanical room. Tie in the 3-inch line to the existing cut-off valve.FOB: DestinationPURCHASE REQUEST NUMBER: 5901605PSC CD: Z2NE *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=N6945022Q0005' to obtain more details.*