NOS WSR - Data Center Infrastructure
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W50S7X-26-Q-A003
- Agency
-
Army National Guard
Department of the Army, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- Place of performance
- McConnell AFB, Kansas 67221, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The 184 Kansas Air National Guard, on behalf of the Department of the Army National Guard, is procuring comprehensive data center infrastructure installation services under solicitation W50S7X-26-Q-A003. The contractor must engineer, design, procure, and install a complete data center solution including 38 server/network racks, cold aisle containment systems, 76 metered Power Distribution Units, and an environmental monitoring system compliant with Sensitive Compartmented Information Facility (SCIF) standards at Building 54, McConnell Air Force Base, Kansas. Critical requirements include ensuring all permanently installed electronic equipment is free of RF-transmitting capabilities by design, providing manufacturer certifications of compliance, and completing all on-site installation work within a mandatory 14-calendar-day window scheduled for July 8-21, 2026. The Government will evaluate proposals based on three factors: price reasonableness, technical ability to meet the Performance Work Statement specifications, and schedule/delivery capability. The solicitation was posted on March 4, 2026, with a response deadline of April 9, 2026 at 9:00 AM CST, and the Questions and Answers period remained open as of March 23, 2026.
This is a 100% small business set-aside with a $19,000,000 size standard under NAICS code 238210, and no incumbent contractor information has been disclosed in the available documents. The solicitation does not specify an award value or budget range, and funds are not presently available for the acquisition, with no contract award to be made until appropriated funds become available. The project comprises two contract line items: CLIN 0001 for base initial data center infrastructure installation and CLIN 0002 as an option for environmental monitoring system installation. The total period of performance is 180 calendar days from the date of award, with performance located at Building 54, McConnell Air Force Base, Wichita, Kansas 67221. Offerors must provide all-inclusive pricing covering procurement, engineering, design, installation, travel, lodging, materials, shipping, training, and one-year labor warranty, with the Government providing only site access, power receptacles, and active network connections.
Notice text
2 versions
Update #2 · Latest ·
NOS WSR - Data Center Infrastructure
3/23/2026 - Added RFIs listing under Attacmemts
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation will not be issued.
The contractor shall engineer, design, procure, and install a complete and functional data center solution focused on racks/cabinets, an aisle containment solution, Power Distribution Units (PDUs), and an environmental monitoring system according to the PWS
Period of Performance will be 180 days from date of award at Building 54, 52010 Jayhawk Drive, McConnell AFB, KS 67221.
Note: Required on site installation window is 08 July 2026 to 21 July 2026
“Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available."
ATTACHMENTS:
1. Combined Synopsis Solicitation
2. Clauses
3. PWS
4. Wage Determination
Update #1 ·
NOS WSR - Data Center Infrastructure
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested, and a written solicitation will not be issued.
The contractor shall engineer, design, procure, and install a complete and functional data center solution focused on racks/cabinets, an aisle containment solution, Power Distribution Units (PDUs), and an environmental monitoring system according to the PWS
Period of Performance will be 180 days from date of award at Building 54, 52010 Jayhawk Drive, McConnell AFB, KS 67221.
Note: Required on site installation window is 08 July 2026 to 21 July 2026
“Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available."
ATTACHMENTS:
1. Combined Synopsis Solicitation
2. Clauses
3. PWS
4. Wage Determination
Files
| File | Type | Posted |
|---|---|---|
| PWS-Data Center Infrastructure.pdf | ||
| RFIs Current as of 03232026.xlsx | XLSX spreadsheet | |
| SCA Wage Determination.txt | TXT text file | |
| Combined Synopsis Solicitation Data Center Infrasturcture - 184 Kansas Air National Guard.pdf | ||
| Clauses.pdf | ||
| PWS-Data Center Infrastructure.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| NOS WSR - Data Center Infrastructure | Award Notice | |
| This notice | Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity