Norris Cotton Restack

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
47PB0023R0034
Agency
Region 1 Public Buildings Service, General Services Administration
Responses due
Set-aside
Competitive 8(a)

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z2AA Repair Or Alteration Of Office Buildings
Place of performance
Manchester, New Hampshire 03101, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The General Services Administration Public Buildings Service Region 1 seeks a contractor to perform interior renovation and fit-out work at the Norris Cotton Federal Building in Manchester, New Hampshire under solicitation number 47PB0023R0034. The selected contractor shall demolish walls, modify ceilings, mechanical, electrical and security systems, and provide finishes, phasing plans, and constructability reviews. Proposals will be evaluated based on management, past performance, and project schedule, with equal consideration for price. Proposals are due by June 12, 2023.

The opportunity is set aside for competitive 8(a) small businesses and involves NAICS codes 236220, 541330. Renovations must be completed within 237 calendar days while maintaining building occupancy. Questions were accepted through June 7th, with minutes from the pre-proposal meeting on May 22nd and site visits available. The estimated contract value is between $3-5 million to support renovations for the Veterans Benefits Administration space.

Notice text

3 versions

Update #3 · Latest ·

6/7/2023 The following document is uploaded.

Final Questions and Answers - Part 2 2023 06 07

6/1/2023 The following documents  are uploaded 

Amendment 0001

Questions and answers

Pre-Conference Site Visit and Attendence 

-----------------------------------------------------------------------------------------------------------------------------------------

construction contractor shall perform all required actions in accordance with the design criteria and supporting documents. The
interior renovation/fit-out includes Demolition, Wall Assembly changes, Reflective Ceiling Plan and Sprinkler Layout,
Electrical/Data, HVAC modifications, Finishes, audio visual design, entry card reader access, Life Safety, and Phasing to maintain
occupancy throughout construction.

The Contractor will perform a wide range of activities, such as: constructability reviews, cost estimating, work phasing reviews,
scheduling and general construction services. The Contractor is at risk and is responsible for involvement in the project development and administration of the construction. The Contractor shall have complete responsibility for all construction related to the project scope.

Update #2 ·

6/1/2023 The following documents  are uploaded 

Amendment 0001

Questions and answers

Pre-Conference Site Visit and Attendence 

-----------------------------------------------------------------------------------------------------------------------------------------

construction contractor shall perform all required actions in accordance with the design criteria and supporting documents. The
interior renovation/fit-out includes Demolition, Wall Assembly changes, Reflective Ceiling Plan and Sprinkler Layout,
Electrical/Data, HVAC modifications, Finishes, audio visual design, entry card reader access, Life Safety, and Phasing to maintain
occupancy throughout construction.

The Contractor will perform a wide range of activities, such as: constructability reviews, cost estimating, work phasing reviews,
scheduling and general construction services. The Contractor is at risk and is responsible for involvement in the project development and administration of the construction. The Contractor shall have complete responsibility for all construction related to the project scope.

Update #1 ·

The construction contractor shall perform all required actions in accordance with the design criteria and supporting documents. The
interior renovation/fit-out includes Demolition, Wall Assembly changes, Reflective Ceiling Plan and Sprinkler Layout,
Electrical/Data, HVAC modifications, Finishes, audio visual design, entry card reader access, Life Safety, and Phasing to maintain
occupancy throughout construction.

The Contractor will perform a wide range of activities, such as: constructability reviews, cost estimating, work phasing reviews,
scheduling and general construction services. The Contractor is at risk and is responsible for involvement in the project development and administration of the construction. The Contractor shall have complete responsibility for all construction related to the project scope.

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Norris Cotton Restack Award Award Notice
Norris Cotton Restack Latest solicitation Solicitation
Norris Cotton Restack This notice Pre-Solicitation
Elevator maintenance at the norris cotton federal building in manchester, NH Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity