Norfolk CSRM Phase 1A - Pump Stations and Tide Gate Design-Build Project located in Norfolk, Virginia

Closed Pre-Solicitation Posted

Not the latest version. See the latest pre-solicitation from .

Solicitation number
W9123624R4003
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Norfolk, Virginia 23510, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers Norfolk District is seeking capabilities statements from potential contractors for the Norfolk CSRM Phase 1A - Pump Stations and Tide Gate Design-Build Project in Norfolk, Virginia. The project involves the construction of a tide gate, sliding or swinging gate closures, and pump stations, along with required utility relocations and installations. Interested firms should submit by November 9, 2023 a narrative no longer than six pages demonstrating relevant experience on similar design-build construction contracts valued between $25-100 million, including company information, SAM registration status, bonding capacity, and details of up to five completed similar projects.

There is no set-aside designation for this procurement. The main NAICS code is 237990 and PSC code is C211. The construction duration is estimated to be 1,825 calendar days from notice to proceed, with an anticipated solicitation date in the third quarter of fiscal year 2024 and award values between $25-100 million. The selected contractor will be required to perform all work in accordance with the access and security requirements of the customer.

Notice text

2 versions

Update #2 · Latest ·

10/26/2023: Revision made to the attachment to remove the second sentance from question #6 as it is not applicable.

The citywide, Norfolk CSRM Program is split into five (5) implementation phases. Phase 1 covers the downtown Norfolk area which extends from Ghent through Downtown Norfolk, connecting to the Ohio Creek Watershed project, which is split into Phases 1A and 1B, and Phase 1A is split into two acquisitions: (1) Phase 1A - Pump Stations and Tide Gate (DB) and (2) Phase 1A – Wall/Levee and Living Shoreline (Design-Bid-Build (DBB)).

This Stand Alone, “C” Type Contract is intended to cover Phase 1A – Pump Stations and Tide Gate (DB) from Berkley Bridge to Campostella (excluding the Casino parcel) as shown in Figure 1 below. The scope may include, but is not limited to, new construction of a tide gate, sliding or swinging gate closures, and pumps stations with required utility relocations and installation for the noted areas. The Contractor shall be required to perform all work in accordance with the access and security requirements of the customer.

This contract will cover DB construction and is anticipated to have a construction duration of 1,825 calendar days (5 years) from Notice to Proceed.

Please see attached document for more project information.

Update #1 ·

The citywide, Norfolk CSRM Program is split into five (5) implementation phases. Phase 1 covers the downtown Norfolk area which extends from Ghent through Downtown Norfolk, connecting to the Ohio Creek Watershed project, which is split into Phases 1A and 1B, and Phase 1A is split into two acquisitions: (1) Phase 1A - Pump Stations and Tide Gate (DB) and (2) Phase 1A – Wall/Levee and Living Shoreline (Design-Bid-Build (DBB)).

This Stand Alone, “C” Type Contract is intended to cover Phase 1A – Pump Stations and Tide Gate (DB) from Berkley Bridge to Campostella (excluding the Casino parcel) as shown in Figure 1 below. The scope may include, but is not limited to, new construction of a tide gate, sliding or swinging gate closures, and pumps stations with required utility relocations and installation for the noted areas. The Contractor shall be required to perform all work in accordance with the access and security requirements of the customer.

This contract will cover DB construction and is anticipated to have a construction duration of 1,825 calendar days (5 years) from Notice to Proceed.

Please see attached document for more project information.

Files

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Fort Eustis Dredge Material Management Area Construction in Newport News, Virginia Fort Eustis, Virginia 23604, United States · NAICS 237990 ENDIST Norfolk No set-aside
Norfolk Harbor Inner Channel to Newport News Maintenance Dredging located in Hampton Roads, Virginia Virginia, United States · NAICS 237990 ENDIST Norfolk No set-aside
W9123627BA004: NASA Wallops Breakwater Project in Wallops Island, Virginia Wallops Island, Virginia, United States · NAICS 237990 ENDIST Norfolk Total Small Business
James River Dredging Industry Day-Post Event Docs Virginia, United States · NAICS 237990 ENDIST Norfolk Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors