About this opportunity
The U.S. Army Corps of Engineers Louisville District is seeking a small business contractor to demolish the Nolin River Lake Project Office and adjacent storage building located in Bee Spring, Kentucky, following a fire that rendered the facility in poor condition. The solicitation requires comprehensive demolition services, including the removal and disposal of friable asbestos waste, with all necessary personnel, equipment, and materials to be provided by the contractor. Key contract requirements include strict compliance with federal, state, and local regulations, third-party air monitoring, and proper waste disposal at an approved facility. A site visit was originally scheduled for February 19, 2025, but was rescheduled to February 26, 2025, and is highly encouraged for contractors to understand the project's complexities. Electronic quotes are due by March 7, 2025, at 2:00 p.m. ET, with submissions accepted via email to amber.l.drones@usace.army.mil.
The contract is a 100% small business set-aside under NAICS code 238910 with a size standard of $19 million, and the estimated construction costs range between $100,000-$250,000. The project site is located at 2150 Nolin Dam Rd. in Bee Spring, KY 42207, with work expected to commence within 14 calendar days of the Notice to Proceed (NTP) and conclude 90 calendar days thereafter. The contractor must be certified for asbestos abatement in Kentucky and will be responsible for handling approximately 350 cubic yards of friable asbestos waste, including demolishing concrete slabs and foundations. Performance and payment bonds are required, and the finished site must be prepared with geotextile fabric, stone, and a properly compacted and graded surface. The observation deck overlooking the dam will remain intact, and the contractor will not be responsible for debris that has migrated beyond the silt fence into the lake.
Notice text
3 versions
Update #3 · Latest ·
An Amendment has been posted with questions and answers, and with attached site visit log.
*************************************************WEATHER DELAY******************************************************
THE SITE VISIT FOR 19 FEB 2025 IS RESCHEDULED TO 26 FEB 2025 AN AMENDMENT WILL BE POSTED 19 FEB 2025 WITH UPDATED DATE/TIME OF SITE VISIT.
*************************************************WEATHER DELAY******************************************************
The contractor shall furnish all personnel, equipment, supplies and materials necessary to Demolish the Existing Project Office and adjacent storage building at Nolin River Lake, located at 2150 Nolin Dam Rd. Bee Spring, KY. 42207. The Project Office experienced a fire and is in overall poor condition, all debris from the project office is to be considered friable asbestos waste. Prices should include mobilization & de-mobilization, fuel, labor, material, equipment and any applicable permits. The contractor’s work and responsibility shall include all planning, programming, administration, management, supervision, communications and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work shall be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Work will begin within 14 calendar days of the Notice to Proceed (NTP) and will conclude 90 calendar days after the NTP.
This procurement is 100% set-aside for Small Business, NAICS 238910.
Note: A site visit is HIGHLY ENCOURAGED for the contractor to review the complexities of the work site, verify existing conditions, and collect exact measurements. A single site visit will be held on 19 February 2025, at 1000 local time. If the initial site visit is missed the Contractor may request, with no guarantee, a site visit with the TPOC, Cam Harris (502) 678-9993 and/or Project Manager Deryck Rodgers (270) 286-4511.
Quotes are due by 7 March 2025, 2:00 p.m. ET. Fax submittals will not be accepted. Electronic submittals may be emailed to amber.l.drones@usace.army.mil.
Update #2 ·
*************************************************WEATHER DELAY******************************************************
THE SITE VISIT FOR 19 FEB 2025 IS RESCHEDULED TO 26 FEB 2025 AN AMENDMENT WILL BE POSTED 19 FEB 2025 WITH UPDATED DATE/TIME OF SITE VISIT.
*************************************************WEATHER DELAY******************************************************
The contractor shall furnish all personnel, equipment, supplies and materials necessary to Demolish the Existing Project Office and adjacent storage building at Nolin River Lake, located at 2150 Nolin Dam Rd. Bee Spring, KY. 42207. The Project Office experienced a fire and is in overall poor condition, all debris from the project office is to be considered friable asbestos waste. Prices should include mobilization & de-mobilization, fuel, labor, material, equipment and any applicable permits. The contractor’s work and responsibility shall include all planning, programming, administration, management, supervision, communications and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work shall be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Work will begin within 14 calendar days of the Notice to Proceed (NTP) and will conclude 90 calendar days after the NTP.
This procurement is 100% set-aside for Small Business, NAICS 238910.
Note: A site visit is HIGHLY ENCOURAGED for the contractor to review the complexities of the work site, verify existing conditions, and collect exact measurements. A single site visit will be held on 19 February 2025, at 1000 local time. If the initial site visit is missed the Contractor may request, with no guarantee, a site visit with the TPOC, Cam Harris (502) 678-9993 and/or Project Manager Deryck Rodgers (270) 286-4511.
Quotes are due by 7 March 2025, 2:00 p.m. ET. Fax submittals will not be accepted. Electronic submittals may be emailed to amber.l.drones@usace.army.mil.
Update #1 ·
The contractor shall furnish all personnel, equipment, supplies and materials necessary to Demolish the Existing Project Office and adjacent storage building at Nolin River Lake, located at 2150 Nolin Dam Rd. Bee Spring, KY. 42207. The Project Office experienced a fire and is in overall poor condition, all debris from the project office is to be considered friable asbestos waste. Prices should include mobilization & de-mobilization, fuel, labor, material, equipment and any applicable permits. The contractor’s work and responsibility shall include all planning, programming, administration, management, supervision, communications and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work shall be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein. Work will begin within 14 calendar days of the Notice to Proceed (NTP) and will conclude 90 calendar days after the NTP.
This procurement is 100% set-aside for Small Business, NAICS 238910.
Note: A site visit is HIGHLY ENCOURAGED for the contractor to review the complexities of the work site, verify existing conditions, and collect exact measurements. A single site visit will be held on 19 February 2025, at 1000 local time. If the initial site visit is missed the Contractor may request, with no guarantee, a site visit with the TPOC, Cam Harris (502) 678-9993 and/or Project Manager Deryck Rodgers (270) 286-4511.
Quotes are due by 7 March 2025, 2:00 p.m. ET. Fax submittals will not be accepted. Electronic submittals may be emailed to amber.l.drones@usace.army.mil.
Files
| File | Type | Posted |
|---|---|---|
| W912QR25Q0005 U00002.pdf | ||
| W912QR25Q0005 U00001.pdf | ||
| W912QR25Q0005.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity