W912QR25Q0005 U00002.pdf
PDF 1 MB Posted
- Attached to
- Nolin River Lake Office Demolition
- Solicitation number
- W912QR25Q0005
About this file
This is Standard Form 30 (Amendment/Modification U0002) to solicitation W912QR25Q0005 for the Nolin River Lake Office Demolition project, containing questions and answers from a February 26, 2025 site visit. The amendment clarifies that the entire building, including concrete slabs and foundations, is considered friable asbestos material requiring proper disposal. The contractor is responsible for third-party air monitoring and may treat/remediate concrete components onsite following local, state and federal regulations if they wish to dispose of them as regular construction waste. The observation deck overlooking the dam will remain and not be demolished. The contractor will not be responsible for retrieving any contaminated debris that has migrated into the lake beyond the silt fence.
The document includes two pre-bid conference sign-in sheets from February 26, 2025, showing approximately 25 representatives from various construction, environmental, and demolition companies who attended. The amendment does not extend the original response deadline. The contract is being administered by the U.S. Army Engineer District, Louisville.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR25Q0005 U00001.pdf | ||
| W912QR25Q0005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912QR25Q0005
X 9B. DATED (SEE ITEM 11)
14-Feb-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Please see the Summary of Changes for Questions and Answers, and the attached site visit log from 26 FEB 2025.
10A. MOD. OF CONTRACT/ORDER NO.
U0002
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Mar-2025
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR25Q0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Q: Will the slab be considered asbestos containing material and must be disposed as asbestos?
A: Yes the building in its entirety will be considered friable asbestos material; if it is advantageous for the contractor to treat/remediate the concrete slab/foundations onsite all local, state, and federal laws shall be followed.
Q: Will the core of engineers be responsible for the 3rd party air monitoring or will that be the asbestos contractor responsibility?
A: Contractors responsibility
Q: Will the deck overlooking the dam be part of the demolition?
A: Observation deck to stay, not to be demolished
Q: It was seen that some of the debris has migrated past the silt fence, will it be the contractor responsible to retrieve the contaminated debris, that might be in the water?
A: Contractor will not be responsible for retrieving debris from the lake.
Q: If the concrete slab and foundation are properly washed and abated before breaking them up, can they be disposed of as regular construction waste, or is the entirety of the building and waste to be treated as asbestos containing?
A: The building in its entirety has been identified as friable asbestos waste, if the contractor were to abate the slab/foundations the local, state, and federal regulations would have to be followed to allow for the concrete debris to be disposed of as regular construction waste.
(End of Summary of Changes)