NOAA: Relative Humidity Calibration Standard built to Specifications

Closed Solicitation Posted

Solicitation number
1305M226Q0197
Agency
National Oceanic and Atmospheric Administration Department of Commerce
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
334519 Other Measuring and Controlling Device Manufacturing
PSC
6640 Laboratory Equipment And Supplies
Place of performance
Sterling, Virginia 20166, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The National Oceanic and Atmospheric Administration seeks two Relative Humidity Calibration Standards built to specifications for the NWS Sterling Field Support Center, with an amended proposal due date of September 21, 2026. The procurement is 100% set-aside for small business entities and will be awarded on a firm-fixed price basis to the responsive, responsible quoter providing best value under FAR 12.203(c)(2).

Place of performance is Sterling, Virginia. The equipment must meet stringent sensor specifications: dew/frost point measurement range of −62°C to 54°C with accuracy of 0.1°C maximum and reproducibility of 0.05°C maximum; relative humidity measurement range of 1–100% at 20°C; display resolution of 0.01°C or better; and a heated hose for gas sampling with minimum length of 55 inches fitting within a 1.874-inch diameter port hole. Additional requirements include a front-facing digital display, PT100 Class A temperature probe, 316L stainless steel electropolished sample gas circuit, maximum dimensions of 20 inches width × 12 inches height × 24 inches length, maximum weight of 75 pounds, 100–120 VAC 50/60 HZ power source, serial communications capability with third-party terminal programs, 1-year minimum calibration interval, and ISO-17025 accredited calibration with certification.

Quoters must respond to ten required submission items including UEI, active SAM registration, representations and certifications via SAM, organizational conflict of interest statements, manufacturing location, small business status verification under NAICS 334519, and approximate lead time for delivery. Evaluation criteria are specifications compliance (evaluated by NOAA and SFSC), past performance on related contracts with two to three references, and price for total CLIN 0001 including shipping and handling. Failure to respond to any required submission item results in non-compliance determination and elimination from consideration. An amendment posted September 16 extends the acceptance period by five calendar days; all previous quoters must sign and return the amendment form SF-30 or prior submissions will be excluded from final review.

Notice text

2 versions

Update #2 · Latest ·

THE PURPOSE OF THIS AMENDMENT IS TO EXTEND THE SOLICITATION ACCEPTANCE PERIOD BY AN ADDITIONAL FIVE CALENDAR DAYS. ALL QUOTERS ARE OFFERED THE OPPORTUNITY TO REVIEW FOR COMPLIANCE, INCLUSION OF ALL REQUIRED COMPONENTS ASSOCIATED WITH THE EQUIPMENT BEING PROPOSED THAT WOULD FACILITATE SUCCESSFUL INTEGRATION WITH ALL EXISTING EQUIPMENT TO MEET ALL PERFORMANCE CRITERIA AS SPECIFIED IN THE STATEMENT OF WORK, ALL ASSOCIATED DOCUMENTATION INCLUDING BUT NOT LIMITED TO MANUALS & WARRANTY INFORMATION AND/OR REVISE AND RESUBMIT THEIR ORIGINAL QUOTES IF NEEDED TO REFLECT THE PROPER CURRENT PRICING FOR TOTAL COSTS.

IN ADDITION, ALL PREVIOUS QUOTERS WILL BE REQUIRED TO SIGN AND RETURN THIS AMENDMENT AS ACKNOWLEDGEMENT OF THE REQUIRED CHANGES. ANY PREVIOUS SUBMISSIONS THAT DO NOT SUBMIT A SIGNED MODIFICATION, FORM SF-30, WILL NO LONGER BE CONSIDERED FOR FURTHER CONSIDERATION DURING THE FINAL REVIEW PROCESS.

The National Oceanic and Atmospheric Administration (NOAA) intends to award a firm fixed price contract for an two (2) Relative Humidity Calibration Standards as built to specifications for the NWS Sterling Field Support Center (SFSC) in Sterling, VA. The Government intends to make an award to the responsive responsible quoter providing the best value in accordance with FAR 12.203(c)(2) and is 100% set-aside for small business entities.

DOC, Eastern Acquisition Division requires that all contractors doing business with this office be registered with the System for Award Management (SAM). No award can be made to a company not registered in SAM. Contractors active in SAM have a unique entity identifier (UEI) that is used to do business with the federal government. The Government has moved to a free new, non-proprietary identifier that will have to be requested in, and assigned by, the System for Award Management (SAM.gov). You can register and access the site by going to www.sam.gov.


Please see Instructions to Offerors and full Solicitation as attached.


**Contractors who do not respond to items 1 through 10 included in the "Instructions to Offerors" may be considered non-compliant with the requirements of the solicitation and no further consideration shall be given for award.

Update #1 ·

The National Oceanic and Atmospheric Administration (NOAA) intends to award a firm fixed price contract for an two (2) Relative Humidity Calibration Standards as built to specifications for the NWS Sterling Field Support Center (SFSC) in Sterling, VA. The Government intends to make an award to the responsive responsible quoter providing the best value in accordance with FAR 12.203(c)(2) and is 100% set-aside for small business entities.

DOC, Eastern Acquisition Division requires that all contractors doing business with this office be registered with the System for Award Management (SAM). No award can be made to a company not registered in SAM. Contractors active in SAM have a unique entity identifier (UEI) that is used to do business with the federal government. The Government has moved to a free new, non-proprietary identifier that will have to be requested in, and assigned by, the System for Award Management (SAM.gov). You can register and access the site by going to www.sam.gov.


Please see Instructions to Offerors and full Solicitation as attached.


**Contractors who do not respond to items 1 through 10 included in the "Instructions to Offerors" may be considered non-compliant with the requirements of the solicitation and no further consideration shall be given for award.

Attachments

Files attached to this notice, newest first
File Type Posted
2 SF-30 1305M226Q0197_Amendment 0001_v.1.pdf PDF
7 SOW for RFQ.pdf PDF
5 SOL 1305M226Q0197_V.1.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity