NM FLAP TRAIL 77000(1), El Camino Real Trail DTFH6817B00014

Award Notice Posted

Solicitation number
DTFH6817B00014
Agency
Awarded
to Laforge & Budd Construction Co Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
6982AF18C000004 Federal contract award
PSC
Not on record
Place of performance
Santa Fe County, New Mexico 87540, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

PROJECT DETAILS:  NM FLAP TRAIL77000(1), El Camino Real Trail

 

The El Camino Real Trail project located on the west side of Santa Fe, New Mexico.  The general scope of improvements is construction of approximately 15 miles of a new multi-use trail described as follows: 


•·       Approx. 3.4 miles of 10' wide asphalt concrete pavement trail.


•·       Approx. 1.7 miles of 4' wide aggregate surface trail.


•·       Approx. 10 miles of 30-inch tread natural surface trail. 


Proposed new construction work includes linear grading, aggregate base, asphalt concrete pavement, concrete box culvert extension (existing Double 12'x10' CBC), minor culvert extensions, trailhead parking area, fence, signing, and interpretive signs.


 


The project is located on Santa Fe County, Bureau of Land Management, and United State Forest Service lands.  The contractor will need to take care to insure no disturbance to the land adjacent to the construction limits.  Also, the contractor must utilize machinery with a maximum width of 48 inches, i.e. mini dozers, mini excavators and mini crawler carriers for construction of the natural surface trail portion, and should have experience in construction of sustainable natural surface trails. 


 


SIGNIFICANT QUANTITIES:


 


Schedule A:



  • 20420-0000 Embankment Construction:  6,300 CUYD
  • 30202-1000 C:  5,700 TON
  • 40301-0000 Asphalt Concrete Pavement:  2,100 TON
  • 55201-0100 Structural Concrete, Class A:  220 CUYD
  • 61501-0100 Sidewalk, Concrete:  2,340 SQYD
  • 62405-0300 Placing Conserved Topsoil, 4-Inch Depth:  41,800 SQYD


Option X: 



  • 21201-0000 Lineal Grading (Type 1):  3.800 MILE
  • 21201-0000 Lineal Grading (Type 2):  5.800 MILE
  • 21201-0000 Lineal Grading (Type 3):  0.600 MILE
  • 30111-2000 Aggregate Surface Course, 6-Inch Depth:  3,900 TON

    Estimated total cost for Schedule A and Option X is $2.5 to $4 million.


Update #1 ·

THIS IS NOT AN INVITATION FOR BID.  PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE.  THE TENTATIVE ADVERTISEMENT DATE IS SEPTEMBER 11, 2017.  THIS PROJECT WILL BE ADVERTISED ON A TOTAL SMALL BUSINESS SET ASIDE BASIS.

PROJECT DETAILS:  NM FLAP TRAIL77000(1), El Camino Real Trail

 

The El Camino Real Trail project located on the west side of Santa Fe, New Mexico.  The general scope of improvements is construction of approximately 15 miles of a new multi-use trail described as follows: 


•·       Approx. 3.4 miles of 10' wide asphalt concrete pavement trail.


•·       Approx. 1.7 miles of 4' wide aggregate surface trail.


•·       Approx. 10 miles of 30-inch tread natural surface trail. 


Proposed new construction work includes linear grading, aggregate base, asphalt concrete pavement, concrete box culvert extension (existing Double 12'x10' CBC), minor culvert extensions, trailhead parking area, fence, signing, and interpretive signs.


 


The project is located on Santa Fe County, Bureau of Land Management, and United State Forest Service lands.  The contractor will need to take care to insure no disturbance to the land adjacent to the construction limits.  Also, the contractor must utilize machinery with a maximum width of 48 inches, i.e. mini dozers, mini excavators and mini crawler carriers for construction of the natural surface trail portion, and should have experience in construction of sustainable natural surface trails. 


 


SIGNIFICANT QUANTITIES:


 


Schedule A:



  • 20420-0000 Embankment Construction:  6,300 CUYD
  • 30202-1000 C:  5,700 TON
  • 40301-0000 Asphalt Concrete Pavement:  2,100 TON
  • 55201-0100 Structural Concrete, Class A:  220 CUYD
  • 61501-0100 Sidewalk, Concrete:  2,340 SQYD
  • 62405-0300 Placing Conserved Topsoil, 4-Inch Depth:  41,800 SQYD


Option X: 



  • 21201-0000 Lineal Grading (Type 1):  3.800 MILE
  • 21201-0000 Lineal Grading (Type 2):  5.800 MILE
  • 21201-0000 Lineal Grading (Type 3):  0.600 MILE
  • 30111-2000 Aggregate Surface Course, 6-Inch Depth:  3,900 TON

    Estimated total cost for Schedule A and Option X is $2.5 to $4 million.


Files

File Type Posted
Bid_summary.pdf PDF
Questions_10-4-2017.pdf PDF
DTFH6817B00014.pdf PDF
Hydraulics.pdf PDF
NM_FLAP_77000_(1)_Bid_Set~2017-08-11_Stamped.pdf PDF

Notice history

Notice Type Posted
This notice Latest Award Notice
NM FLAP TRAIL77000(1), El Camino Real Trail Original Award Notice