NM FLAP TRAIL77000(1), El Camino Real Trail
Award Notice Posted
- Solicitation number
- DTFH6817B00014
- Agency
-
Federal Highway Administration
Department of Transportation
- Awarded
- to Laforge & Budd Construction Co Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- 6982AF18C000004 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Santa Fe County, New Mexico 87540, United States
Notice details come from SAM.gov. Updated .
Notice text
Added: Jun 23, 2017 10:45 am
THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are Small Businesses, HUBZone small businesses, Woman owned small business concerns, 8(a) small businesses, or Service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs MUST submit the following by e-mail to CFLAcquisitions@dot.gov or by telefax to 720-963-3360 (Attn: Craig Holsopple) for receipt by close of business (2 p.m. local Denver time) on June 30, 2017:
(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;
(2) A copy of the letter from SBA stating date of HUBZone small business certification or acceptance to the 8(a) small business program. In the case of a Service Disabled Veteran Owned Small Business Concern, you must provide proof of eligibility (DD form 214 or a letter of adjudication from the Veterans Administration). This information must be provided in order to determine eligibility - DO NOT SEND COPIES OF YOUR CCR PROFILE;
(3) Letter from bonding agent stating your firm's capability to bond for a single project of $4 million, and your firm's aggregate bonding capacity; and
(4) Provide a list of road construction projects of equal or greater value and scope to the El Camino Real Trail project in which you performed (as the prime contractor) construction of a new multi-use trails including embankment construction, embankment construction, asphalt concrete pavement, structural concrete, sidewalk, concrete, lineal grading, and placing conserved topsoil. State whether your firm was the prime contractor or subcontractor on the project. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.
The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/
A Qualified HUBZone SBC receiving a HUBZone contract for general construction must spend at least 50% of the cost of the contract incurred for personnel on its own employees or employees of other qualified HUBZone SBCs. This requirement may be met by expending at least 50% of the cost of the contract incurred for personnel on its employees or it may subcontract at least 35% of the cost of the contract performance incurred for personnel to one or more qualified HUBZone SBCs. A qualified HUBZone SBC prime contractor may not, however, subcontract more than 50% of the cost of the contract incurred for personnel to non-qualified HUBZone SBCs.
PROJECT DETAILS: NM FLAP TRAIL77000(1), El Camino Real Trail
The project located on the west side of Santa Fe, New Mexico. The general scope of improvements is construction of approximately 15 miles of a new multi-use trail described as follows:
•· Approx. 3.4 miles of 10' wide asphalt concrete pavement trail.
•· Approx. 1.7 miles of 4' wide aggregate surface trail.
•· Approx. 10 miles of 30-inch tread natural surface trail.
Proposed new construction work includes linear grading, aggregate base, asphalt concrete pavement, concrete box culvert extension (existing Double 12'x10' CBC), minor culvert extensions, trailhead parking area, fence, signing, and interpretive signs.
The project is located on Santa Fe County, Bureau of Land Management, and United State Forest Service lands. The contractor will need to take care to insure no disturbance to the land adjacent to the construction limits. Also, the contractor must utilize machinery with a maximum width of 48 inches, i.e. mini dozers, mini excavators and mini crawler carriers for construction of the natural surface trail portion, and should have experience in construction of sustainable natural surface trails.
SIGNIFICANT QUANTITIES:
Schedule A:
- 20420-0000 Embankment Construction: 6,300 CUYD
- 30202-1000 C: 5,700 TON
- 40301-0000 Asphalt Concrete Pavement: 2,100 TON
- 55201-0100 Structural Concrete, Class A: 220 CUYD
- 61501-0100 Sidewalk, Concrete: 2,340 SQYD
- 62405-0300 Placing Conserved Topsoil, 4-Inch Depth: 41,800 SQYD
Option X:
- 21201-0000 Lineal Grading (Type 1): 3.800 MILE
- 21201-0000 Lineal Grading (Type 2): 5.800 MILE
- 21201-0000 Lineal Grading (Type 3): 0.600 MILE
- 30111-2000 Aggregate Surface Course, 6-Inch Depth: 3,900 TON
Construction is anticipated between October 2017 and April 2018 dependent upon which Schedule and Option is awarded. Estimated total cost is $2.5 to $4 million.
Notice history
| Notice | Type | Posted |
|---|---|---|
| NM FLAP TRAIL 77000(1), El Camino Real Trail DTFH6817B00014 | Award Notice | |
| This notice | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity