NIST Granite Paver Maintenance and Repair
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 1333ND26QNB190467
- Agency
-
National Institute of Standards and Technology
Department of Commerce
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238990 All Other Specialty Trade Contractors
- PSC
- Y1AA Construction Of Office Buildings
- Place of performance
- Gaithersburg, Maryland 20899, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The National Institute of Standards and Technology seeks granite paver maintenance and repair services at its Gaithersburg campus, with quotations due August 28 at 1:00 PM ET. This is a 100% small business set-aside under NAICS 238990 with a small business size standard of $19.0 million.
Place of performance is the NIST Gaithersburg campus, Building 101. Work includes cleaning, resetting, and tuckpointing granite pavers; replacing mortar setting beds with 1-inch Type S polymer mixed mortar and 16-gauge wire mesh; and replacing cracked pavers with Coldspring Granite Concord Gray. The main entrance must remain open during construction. All work requires contractor-submitted Safety Plans, Activity Hazard Analyses, Quality Control Plans, and Site Coordination Plans (requiring approximately four-week approval period). Performance period is 365 calendar days from Notice to Proceed.
The procurement comprises three firm-fixed-price contract line items: CLIN 0001 (Building 101 Main Entrance, approximately 250 square feet of new pavers and mortar bed), CLIN 0002 (Building 101 Side Entrance, approximately 600 linear feet of joint tuckpointing and 200 square feet of paver replacement), and CLIN 0003 (not-to-exceed allowance priced using unit rates). Mandatory site visit is August 13 at 10:00 AM; contractors must register by August 12 with Philip Huynh at philip.huynh@nist.gov. Amendment 0001 (August 19) added As-Builts Series 3 and Series 5 as attachments.
Offerors must submit technical and price volumes separately, provide evidence of two similar paver repair projects within five years, identify a qualified job foreman, and include a bid bond per FAR 52.228-1. Wage determination MD20260043 (Modification 2, effective June 4, 2026) applies prevailing wage rates including $32.28 base for Carpenter and $59.50 base for Electrician, plus fringe benefits. Executive Order 14026 minimum wage of $15.00 per hour and paid sick leave under Executive Order 13706 apply. Davis-Bacon wage determinations and security/facility access requirements per NIST guidelines are mandatory. Award will be made to the lowest-priced technically acceptable offer using simplified acquisition procedures without discussions unless the Government determines discussions are necessary.
Notice text
2 versions
Update #2 · Latest ·
Amendment 0001
The purpose of this Amendment is to provide the following documents available in the attachements section of this posting:
- As-Builts - Series 3
- As-Builts - Series 5
All terms and conditions remain unchanged.
END OF AMENDMENT
This is a combined synopsis/solicitation for the National Institute of Standards and Technology (NIST) Granite Paver Maintenance and Repair requirement as described in the attached Statement of Work (SOW). Please see attached combined synopsis/solicitation, Statement of Work (SOW), Wage Determination, NIST Guidelines for Contractors and A/E Firms, Revolutionary FAR Overhaul (RFO) Provisions and Clauses, and Granite Paver Unit Pricing Schedule.
NIST intends to conduct a Site Visit for this requirement on 8/13/2026 at 10AM. Please see instructions in the combined synopsis/solicitation. Those planning on attending must notify NIST of your intention and provide the information detailed in the attached synopsis/solicitation by no later than Wednesday, 8/12/2026.
Update #1 ·
This is a combined synopsis/solicitation for the National Institute of Standards and Technology (NIST) Granite Paver Maintenance and Repair requirement as described in the attached Statement of Work (SOW). Please see attached combined synopsis/solicitation, Statement of Work (SOW), Wage Determination, NIST Guidelines for Contractors and A/E Firms, Revolutionary FAR Overhaul (RFO) Provisions and Clauses, and Granite Paver Unit Pricing Schedule.
NIST intends to conduct a Site Visit for this requirement on 8/13/2026 at 10AM. Please see instructions in the combined synopsis/solicitation. Those planning on attending must notify NIST of your intention and provide the information detailed in the attached synopsis/solicitation by no later than Wednesday, 8/12/2026.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| NIST Granite Paver Maintenance and Repair | Award Notice | |
| This notice | Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity