Attachment F - Granite Paver Unit Pricing Schedule.xlsx
XLSX spreadsheet 9 KB Posted
- Attached to
- NIST Granite Paver Maintenance and Repair
- Solicitation number
- 1333ND26QNB190467
About this file
This is a unit pricing schedule template for the NIST Granite Paver Maintenance and Repair solicitation (1333ND26QNB190467). The schedule requires offerors to provide unit prices for nine line items covering granite paver maintenance and repair services at a NIST facility. The pricing items include reset existing granite pavers (SF), replace mortar setting bed (SF), replace unsuitable base (CY), tuckpoint joints (LF), clean granite pavers (SF), and granite replacement in three sizes—small, medium, and large (EA)—plus a mobilization/demobilization cost (EA). All submitted unit prices must be all-inclusive, encompassing labor, materials, equipment, overhead, profit, permits, testing, supervision, and incidentals.
The solicitation is issued by the National Institute of Standards and Technology (NIST), a bureau of the Department of Commerce. A mandatory site visit is scheduled for August 13, 2026, at 10:00 AM, with notification of attendance required by August 12, 2026. Offerors should reference the accompanying Statement of Work, wage determination, NIST contractor guidelines, and applicable FAR provisions for complete requirement details. This combined synopsis/solicitation represents a competitive procurement for maintenance and repair services on granite paver installations at a federal facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 - Unit Pricing
| Item No. | Description | Unit | Offeror Unit Price ($) | Notes |
| 0003AA | Reset existing granite pavers | SF | ||
| 0003AB | Replace mortar setting bed | SF | ||
| 0003AC | Replace unsuitable base | CY | ||
| 0003AD | Tuckpoint joints | LF | ||
| 0003AE | Clean granite pavers | SF | ||
| 0003AF | Granite replacement - Small | EA | ||
| 0003AG | Granite replacement - Medium | EA | ||
| 0003AH | Granite replacement - Large | EA | ||
| 0003AJ | Mobilization/Demobilization | EA | ||
| Instructions | ||||
| Complete the Offeror Unit Price column. Unit prices include all labor, materials, equipment, overhead, profit, permits, testing, supervision and incidentals. |
File details come from the government source that posted it. Updated .