NFSR #250 Reconstruction (M. P. 29. 30 to M. P. 47. 28) - R1, Nez Perce-Clearwater NFs, North Fork RD
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 12363N24R4005
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Not on record
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Pierce, Idaho 83546, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Agriculture Forest Service is seeking contractors to reconstruct approximately 18 miles of the National Forest Service Road (NFSR) 250 on the Nez Perce-Clearwater National Forests in Idaho. The project aims to correct ineffective shaping and drainage, and replace end-of-life drainage structures to improve the drivability and drainage of the road system. The work includes removal of existing culverts and installation of 62 corrugated metal culverts, reconditioning of the roadways, and the supply of riprap and aggregate surface course by the Government. Contractors must provide all labor, equipment, structures, supervision, transportation, and other necessary items to complete the project. The Government's construction estimate is between $250,000 and $500,000, and the work must be performed between July 1 and October 31 in 2024 and 2025.
This opportunity is not set aside for any specific business size or type. The main NAICS code is 237310 - Highway, Street, and Bridge Construction, and the primary PSC code is Y1BO - Highway, Street, and Bridge Construction. There are no incumbent contractors or potential incumbents mentioned in the pre-solicitation notice. Bid bonds and performance and payment bonds will be required from the awardee.
Notice text
The objective of the NFSR #250 Reconstruction project is to correct the impacts of ineffective shaping and drainage on the National Forest Service Road (NFSR) 250 and replace end-of-life drainage structures. The project will improve the drivability and drainage of the road system. This project is being performed on the North Fork Ranger District of the Nez Perce-Clearwater National Forests. US Forest Service stewardship funds are being utilized to accomplish watershed restoration while stimulating the local economy; as a stewardship project, advertisement using Full and Open competition is required per USFS policy.
The NFSR #250 Reconstruction project requires removal of existing culverts and installation of 62 corrugated metal culverts of varying lengths with diameters of 18", 24", and 36". Work also includes reconditioning the roadways to provide clean ditches and catch basins and appropriate drainage. Riprap, to address a fill slope failure, and aggregate surface course, for installation at culvert replacement locations, shall be supplied by the Government. Approximately 18 miles of Forest Road shall be treated. The contractor shall furnish all labor, equipment, structures, supervision, transportation, operating supplies (except those designated as Government-furnished), and incidentals necessary to complete the project as required by the contract, plans and specifications.
The project is located approximately 30 miles North of Pierce, Idaho. Travel south of Pierce, Idaho via Idaho Highway 11 to NFSR 100 to the intersection with NFSR 250. Work begins on M.P. 29.30 of NFSR 250 and ends on M.P. 47.28 NFSR 250.
The Government’s construction estimate is between $250,000 and $500,000. It is anticipated that the full solicitation with complete technical specifications and drawings shall be issued in mid-April. Due to the proximity of NFSR #250 to the North Fork of the Clearwater River and fish habitat concerns, road reconstruction work shall be performed between July 1st and October 31st only. Work outside of this period is prohibited.
Construction work may commence on or after 7/1/2024. No less than 25% of the total linear feet of corrugated metal pipe required shall be installed by 10/31/2024. Work during the 2025 field season may commence on or after 7/1/2025. All work shall be completed by October 31, 2025.
Bid bonds will be required. Performance and payment bonds will be required from the awardee.
Notice history
| Notice | Type | Posted |
|---|---|---|
| NFSR #250 Reconstruction (M. P. 29. 30 to M. P. 47. 28) - R1, Nez Perce-Clearwater NFs, North Fork RD | Award Notice | |
| NFSR #250 Reconstruction (M. P. 29. 30 to M. P. 47. 28) - R1, Nez Perce-Clearwater NFs, North Fork RD | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| End of the World Long Term Stewardship | Forest Service | No set-aside | |
| Custer Gallatin National Forest Ashland and Sioux Road Maintenance | Region 6 - Pacific Northwest Region | Total Small Business | |
| ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 | Federal Highway Administration | No set-aside | |
| ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements | Federal Highway Administration | No set-aside | |
| GAOA Powell Duplex Improvements, Nez Perce - Clearwater National Forest | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity