Nez Perce-Clearwater NFs - Selway Road Repairs, Nineteenmile Culvert Construction and Gedney Bridge Repairs

Award Notice Posted

Solicitation number
AG-0343-S-16-0007
Agency
Awarded
to Ascorp Inc.
Set-aside
HUBZone

Opportunity facts

Contract number
AG-0343-C-16-0033 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Nez Perce-Clearwater National Forests Grangeville Office 104 Airport Road Grangeville, Idaho 83530, United States

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

Award made on 5/25/2016.

Update #3 ·

Project Description: This project is a Collaborative Forest Landscape Restoration Project (CFLRP). The goal of the CFLRP project is to utilize collaborative, science based ecosystem restoration techniques to improve watershed function while encouraging ecological, economic and social sustainability with an emphasis on providing local employment opportunities. In addition, the project is being performed in collaboration with the Nez Perce Tribe Watershed program. The goal of this partnership is to use restoration techniques to improve the waterway. This contract requires roadbed reconditioning and surfacing (4 to 6 inches of aggregate), retaining wall installation, dust abatement, road/bridge maintenance work and installation of an Aquatic Organism Passage culvert. A temporary detour construction and removal with temporary bridge will be required at the AOP culvert installation site. Erosion control will be used to protect watershed. All work shall be in compliance with this solicitation's specifications, and provisions. This includes furnishing labor, equipment, supervision, transportation, operating supplies, and incidentals.

Project Location: The project is located east of Kooskia, Idaho approximately 25 miles, near Lowell, ID. From Kooskia, ID travel East on Highway 12 for 23 miles to the junction of FS Road 223. The project begins at MP 6.78 of Road 223 and continues to MP 19.45. Road surfacing is required from MP 7.0 to 19.5. The AOP culvert installation will be performed at Nineteenmile Creek (MP 9.00); the bridge maintenance will be performed at Gedney Creek (MP 18.4). No formal pre-bid tour is planned.


Project Timing: The solicitation shall be issued in mid-April. Anticipated start date is July 1, 2016. The AOP culvert installation must be completed by September 30, 2016; the associated instream equipment operation window is July 15 - August 15, 2016. No road closures will be allowed from July 1st to September 15th each year. Outside this period, road closures will only be allowed Monday through Thursday, leaving the road passable Friday - Sunday. The final completion deadline for all items is October 31, 2017.

Estimated Price Range: The estimated price range for the total project is between $1,000,000 and $5,000,000.

This acquisition has been set-aside for HUBZone certified small businesses.

Solicitation was issued 4/15/2016. 

Amendment 1 was issued 5/12/16 to correct a quantity in Schedule of Items B-1 (Calcium Chloride Pellet Dust Abatement was decreased from 140 Tons to 90 Tons).  A few other clarifications were also made.  Response deadline extended to Tuesday, May 17, 4:00 PM Local Time.  Respondents must acknowledge this material amendment. 

Update #2 ·

Project Description: This project is a Collaborative Forest Landscape Restoration Project (CFLRP). The goal of the CFLRP project is to utilize collaborative, science based ecosystem restoration techniques to improve watershed function while encouraging ecological, economic and social sustainability with an emphasis on providing local employment opportunities. In addition, the project is being performed in collaboration with the Nez Perce Tribe Watershed program. The goal of this partnership is to use restoration techniques to improve the waterway. This contract requires roadbed reconditioning and surfacing (4 to 6 inches of aggregate), retaining wall installation, dust abatement, road/bridge maintenance work and installation of an Aquatic Organism Passage culvert. A temporary detour construction and removal with temporary bridge will be required at the AOP culvert installation site. Erosion control will be used to protect watershed. All work shall be in compliance with this solicitation's specifications, and provisions. This includes furnishing labor, equipment, supervision, transportation, operating supplies, and incidentals.

Project Location: The project is located east of Kooskia, Idaho approximately 25 miles, near Lowell, ID. From Kooskia, ID travel East on Highway 12 for 23 miles to the junction of FS Road 223. The project begins at MP 6.78 of Road 223 and continues to MP 19.45. Road surfacing is required from MP 7.0 to 19.5. The AOP culvert installation will be performed at Nineteenmile Creek (MP 9.00); the bridge maintenance will be performed at Gedney Creek (MP 18.4). No formal pre-bid tour is planned.


Project Timing: The solicitation shall be issued in mid-April. Anticipated start date is July 1, 2016. The AOP culvert installation must be completed by September 30, 2016; the associated instream equipment operation window is July 15 - August 15, 2016. No road closures will be allowed from July 1st to September 15th each year. Outside this period, road closures will only be allowed Monday through Thursday, leaving the road passable Friday - Sunday. The final completion deadline for all items is October 31, 2017.

Estimated Price Range: The estimated price range for the total project is between $1,000,000 and $5,000,000.

This acquisition has been set-aside for HUBZone certified small businesses.

Solicitation was issued 4/15/2016.

Update #1 ·

Project Description: This project is a Collaborative Forest Landscape Restoration Project (CFLRP). The goal of the CFLRP project is to utilize collaborative, science based ecosystem restoration techniques to improve watershed function while encouraging ecological, economic and social sustainability with an emphasis on providing local employment opportunities. In addition, the project is being performed in collaboration with the Nez Perce Tribe Watershed program. The goal of this partnership is to use restoration techniques to improve the waterway. This contract requires roadbed reconditioning and surfacing (4 to 6 inches of aggregate), retaining wall installation, dust abatement, road/bridge maintenance work and installation of an Aquatic Organism Passage culvert. A temporary detour construction and removal with temporary bridge will be required at the AOP culvert installation site. Erosion control will be used to protect watershed. All work shall be in compliance with this solicitation's specifications, and provisions. This includes furnishing labor, equipment, supervision, transportation, operating supplies, and incidentals.

Project Location: The project is located east of Kooskia, Idaho approximately 25 miles, near Lowell, ID. From Kooskia, ID travel East on Highway 12 for 23 miles to the junction of FS Road 223. The project begins at MP 6.78 of Road 223 and continues to MP 19.45. Road surfacing is required from MP 7.0 to 19.5. The AOP culvert installation will be performed at Nineteenmile Creek (MP 9.00); the bridge maintenance will be performed at Gedney Creek (MP 18.4). No formal pre-bid tour is planned.


Project Timing: The solicitation shall be issued in mid-April. Anticipated start date is July 1, 2016. The AOP culvert installation must be completed by September 30, 2016; the associated instream equipment operation window is July 15 - August 15, 2016. No road closures will be allowed from July 1st to September 15th each year. Outside this period, road closures will only be allowed Monday through Thursday, leaving the road passable Friday - Sunday. The final completion deadline for all items is October 15, 2017.

Estimated Price Range: The estimated price range for the total project is between $1,000,000 and $5,000,000.

This acquisition has been set-aside for HUBZone certified small businesses.

Files

File Type Posted
Amend1.doc DOC document
Amendment1Pages2_4.docx DOCX document
Amendment1Attachment2DrawingSheet_3.pdf PDF
19-MileFSSS.pdf PDF
Gedney_Creek_Bridge_Repair_Plans_Final.pdf PDF
Selway_Road_FSSS.pdf PDF
SelwayRoadRepairPlansFinal.pdf PDF
ConstructionRFP.docx DOCX document
Nineteenmile_Culvert_Plans_Final.pdf PDF
Gedney_Creek_Bridge_Repair_FSSS.pdf PDF