Amendment1Pages2_4.docx

DOCX document 21 KB Posted

Attached to
Nez Perce-Clearwater NFs - Selway Road Repairs, Nineteenmile Culvert Construction and Gedney Bridge Repairs
Solicitation number
AG-0343-S-16-0007
Issued by

About this file

Amendment 1 Pages 2-4

View the file

Other files

File Type Posted
Amend1.doc DOC document
Amendment1Attachment2DrawingSheet_3.pdf PDF
ConstructionRFP.docx DOCX document
SelwayRoadRepairPlansFinal.pdf PDF
19-MileFSSS.pdf PDF
Nineteenmile_Culvert_Plans_Final.pdf PDF
Gedney_Creek_Bridge_Repair_Plans_Final.pdf PDF
Gedney_Creek_Bridge_Repair_FSSS.pdf PDF
Selway_Road_FSSS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION: AG-0343-S-16-0007

SELWAY ROAD REPAIRS, NINETEENMILE CULVERT CONSTRUCTION AND GEDNEY BRIDGE REPAIRS

Amendment 1, Page 2 of 4 Dated 5/12/2016

3. Replace Sheet 3 of the Construction Plans for Selway Road Repairs NFSR No. 223 to reflect the corrected Estimated Quantity for Item No. 30605, Calcium Chloride Pellet Dust Abatement of 90 Tons. Sheet has been uploaded as a separate attachment to FBO.

4. Amend Sheet of the Construction Plans for Selway Road Repairs NFSR No. 223 as follows: Change the Qty in Row 3 to indicate that application of 90 Tons of Dust Palliative will begin at M.P. 6.78.

5. Amend Sheet 2, 19-Mile Bridge Replacement - Construction Plans, Summary of Quantities, Item No. 30809 Crushed Aggregate as follows. Strike the words (Government Furnished) and replace with (Contactor Furnished). This corrects a discrepancy with Schedule of Items B-2.

6. Amend Sheet 2, Gedney Creek Bridge Repairs - Construction Plans, Summary of Quantities, Item No. 30809 Crushed Aggregate as follows. Strike the words (Government Furnished Material Source) and replace with (Contactor Furnished Material Source). This corrects a discrepancy with Schedule of Items B-3.

7. Offer due date is extended to Tuesday, May 17, 4:00 PM Local Time. This Amendment must be acknowledged in accordance with the instructions provided in Block 11 of the SF-30 or by completing Block 19 of the SF-1442 Offer Form.

SOLICITATION: AG-0343-S-16-0007

SELWAY ROAD REPAIRS, NINETEENMILE CULVERT CONSTRUCTION AND GEDNEY BRIDGE REPAIRS

Amendment 1, Page 3 of 4 Dated 5/12/2016

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICES

SELWAY ROAD REPAIRS, NINETEENMILE CULVERT CONSTRUCTION

AND GEDNEY BRIDGE REPAIRS

NFSR No. 223, MP 6.78 – MP 19.45 Moose Creek Ranger District Nez Perce - Clearwater National Forests Idaho County, Idaho B-1– Selway Road Repairs

ITEM

NO

SPEC NO

DESCRIPTION

MEATHOD OF MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

1
15101
Mobilization
LSQ
Lump Sum
1
$_________
$_______________
2
15221
Construction Survey & Staking
LSQ
Lump Sum
1
$_________
$_______________
3
15702
Silt Fence, Install and Remove after Construction
CQ
Linear Foot
576
$_________
$_______________
4
20401
Roadway Excavation
CQ
Cubic Yard
720
$_________
$_______________
5
25501
Mechanically Stabilized Earth Wall
CQ
Square Yard
275
$_________
$_______________
6
25503
Select Granular Backfill for MSE Wall (Contractor Furnished)
CQ
Cubic Yard
480
$_________
$_______________
7
30109
Aggregate Surface Course (Contractor Furnished)
CQ
Ton
28366
$_________
$_______________
8
30304
Road Reconditioning, Ditch Cleaning or Construction
CQ
Linear Foot
9130
$_________
$_______________
9
30326
Road Reconditioning, Roadbed
CQ
Mile
12.67
$_________
$_______________
10
30330
Shoulder Reconditioning, Remove Existing Shoulder Berm
LSQ
Lump Sum
1
$_________
$_______________
11
30605
Calcium Chloride Pellet Dust Abatement at 94% min. concentration
AQ
Ton
140
$_________
$_______________
12
60201
18" Pipe Culvert, 0.064" Thickness Steel, 0.075" Thickness Aluminum
AQ
Linear Foot
164
$_________
$_______________
13
60403
Inlet, Corrugated Metal Pipe Drop Inlet with Treated Timber Cover
AQ
Each
27
$_________
$_______________
14
60412
Treated Timber Drop Inlet Cover
AQ
Each
20
$_________
$_______________
15
60713
Remove, Clean and Relay Salvaged Culvert
AQ
Each
1
$_________
$_______________
16
60714
Cleaning Existing Culvert, In Place
AQ
Each
98
$_________
$_______________
17
62201A
Equipment Rental, Hydraulic Excavator with Thumb*
AQ
Hour
20
$_________
$_______________
18
62201B
Equipment Rental, Large Dump Truck*
AQ
Hour
32
$_________
$_______________
19
62201C
Equipment Rental, Road Grader*
AQ
Hour
20
$_________
$_______________
20
62201D
Equipment Rental, Water Truck*
AQ
Hour
10
$_________
$_______________
21
62201E
Equipment Rental, Pneumatic Tire Roller*
AQ
Hour
10
$_________
$_______________
22
63301
Replace Existing Signs and Wood Posts
AQ
Each
10
$_________
$_______________
23
63305
Posts, Steel U-Post for Mile Markers
AQ
Each
13
$_________
$_______________
24
63306
Object Markers, Mile Marker
AQ
Each
13
$_________
$_______________
25
62528
Seeding, Hydraulic Method
LSQ
Lump Sum
1
$_________
$_______________

TOTAL FOR ALL ITEMS BELOW.

File details come from the government source that posted it. Updated .