Nez Perce-Clearwater National Forests: Lolo Motorway Surface and Drainage Improvement Project Part 1
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 12034320Q4005
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Kamiah ID 83536 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks a contractor to complete surface and drainage improvement work on approximately 16 miles of road reconditioning and 5 miles of full depth reclamation on the Lolo Motorway located on the Nez Perce-Clearwater National Forests in Idaho. Additional requirements include removing and replacing culverts, widening narrow sections, shaping drainage features, and installing drainage dips. The selected contractor must furnish all labor, equipment, materials, and supervision to complete the project by October 31, 2020. The solicitation closes on July 14, 2020. The Forest Service will evaluate proposals based on technical acceptability and price.
This requirement has been set aside for total small business participation. The primary NAICS code is 237110 and PSC code R499. The estimated value ranges from $100,000 to $250,000 to be completed at locations between Township 36 North Range 7 East and Township 37 North Range 11 East in Idaho. Construction is prohibited on a section of the Lolo Motorway from August 3-7, 2020. The place of performance will be on the Nez Perce-Clearwater National Forests in Kamiah, Idaho.
Notice text
2 versions
Update #2 · Latest ·
This contract is for Part 1 of the Lolo Motorway Surface and Drainage Improvement Project on the Nez Perce- Clearwater National Forest, Idaho County, Idaho. Part 1 requires completing approximately 16 miles of road reconditioning and 5 ½ miles of full depth reclamation. In addition, 12” and 18” culvert shall be removed and replaced and excavation and embankment shall be performed to widen existing narrow sections of the road. Shaping of the road to provide appropriate drainage and cleaning of the ditches and catch basins of existing culverts is also required along with installation of driveable drainage dips. Contractor shall furnish all labor, equipment, structures, supervision, transportation, operating supplies (except those designated as Government-furnished), and incidentals necessary to complete the project as required by the contract, plans, and specifications.
The project is approximately 43.5 mi east of Kamiah, Idaho. From Kamiah take Woodland Road 0.50 Miles. Turn right onto Glenwood for approximately 11.3 miles to Road #100 which is an extension of Tommy Taha Connect. Stay on Road #100 for approximately 16.2 miles to Road #103. Turn right on Road #103 for approximately 14.8 miles to the junction with Road #104. Turn right on Road # 104 for approximately 0.75 Miles to the junction with Road #500 – Pete’s Fork Junction (MP 22.59) start of the project. This project is located on the Lochsa Ranger District and begins in Township 36 North Range 7 East and goes through T36N R8E, T36N R9E, T36N R10E, T37N R10E, and Ends in Township 37 North, Range 11 East, at Road #500 junction with Road #107.
Government cost estimate, per FAR 36.204, is between $100,000 - $250,000.
No pre-bid tour is planned. See Section L-12 FAR 52.236-27 Site Visit (Construction) (FEB 1995) Alternate I (FEB 1995) for details. Photos of road surface conditions have been provided as an attachment in Section J.
Estimated start date: 8/1/2020 Completion deadline: 10/31/2020. (See Section F, FAR Clause 52.211-10 Alt I.) IMPORTANT: Construction/reconstruction work on the Lolo Motorway (Road 500) is prohibited from August 3, 2020 through August 7, 2020. Equipment must be moved off the road prism during this period to allow the public total access of the roadway for the scheduled Appaloosa Trail Ride.
This project has been solicited as total small business set-aside. All responsible sources may submit a quotation which shall be considered by the agency.
The Contracting Officer for this project, Karen Ruklic, works out of the Nez Perce-Clearwater National Forests Grangeville office. The physcial address is 104 Airport Road, Grangeville, ID 83530.
RFQ was amended on 6/19/2020 to add a 6-inch depth requirement to the Full Depth Reclamation specification found within Attachment J-2 Forest Service Supplemental Specifications. Deadline for receipt of quotes unchanged.
Update #1 ·
This contract is for Part 1 of the Lolo Motorway Surface and Drainage Improvement Project on the Nez Perce- Clearwater National Forest, Idaho County, Idaho. Part 1 requires completing approximately 16 miles of road reconditioning and 5 ½ miles of full depth reclamation. In addition, 12” and 18” culvert shall be removed and replaced and excavation and embankment shall be performed to widen existing narrow sections of the road. Shaping of the road to provide appropriate drainage and cleaning of the ditches and catch basins of existing culverts is also required along with installation of driveable drainage dips. Contractor shall furnish all labor, equipment, structures, supervision, transportation, operating supplies (except those designated as Government-furnished), and incidentals necessary to complete the project as required by the contract, plans, and specifications.
The project is approximately 43.5 mi east of Kamiah, Idaho. From Kamiah take Woodland Road 0.50 Miles. Turn right onto Glenwood for approximately 11.3 miles to Road #100 which is an extension of Tommy Taha Connect. Stay on Road #100 for approximately 16.2 miles to Road #103. Turn right on Road #103 for approximately 14.8 miles to the junction with Road #104. Turn right on Road # 104 for approximately 0.75 Miles to the junction with Road #500 – Pete’s Fork Junction (MP 22.59) start of the project. This project is located on the Lochsa Ranger District and begins in Township 36 North Range 7 East and goes through T36N R8E, T36N R9E, T36N R10E, T37N R10E, and Ends in Township 37 North, Range 11 East, at Road #500 junction with Road #107.
Government cost estimate, per FAR 36.204, is between $100,000 - $250,000.
No pre-bid tour is planned. See Section L-12 FAR 52.236-27 Site Visit (Construction) (FEB 1995) Alternate I (FEB 1995) for details. Photos of road surface conditions have been provided as an attachment in Section J.
Estimated start date: 8/1/2020 Completion deadline: 10/31/2020. (See Section F, FAR Clause 52.211-10 Alt I.) IMPORTANT: Construction/reconstruction work on the Lolo Motorway (Road 500) is prohibited from August 3, 2020 through August 7, 2020. Equipment must be moved off the road prism during this period to allow the public total access of the roadway for the scheduled Appaloosa Trail Ride.
This project has been solicited as total small business set-aside. All responsible sources may submit a quotation which shall be considered by the agency.
The Contracting Officer for this project, Karen Ruklic, works out of the Nez Perce-Clearwater National Forests Grangeville office. The physcial address is 104 Airport Road, Grangeville, ID 83530.
Files
| File | Type | Posted |
|---|---|---|
| Amend1_Reclamation_6inch_Depth.doc | DOC document | |
| Final_RFQ.doc | DOC document | |
| AttachmentJ3_DRAWINGS_Final_NoAgg.pdf | ||
| AttachmentJ2_FSSS_edited3inch.pdf | ||
| AttachmentJ4_SitePhotos.pptx | PPTX presentation |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Nez Perce-Clearwater National Forests: Lolo Motorway Surface and Drainage Improvement Project Part 1 | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Custer Gallatin National Forest Ashland and Sioux Road Maintenance | Region 6 - Pacific Northwest Region | Total Small Business | |
| ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 | Federal Highway Administration | No set-aside | |
| End of the World Long Term Stewardship | Forest Service | No set-aside | |
| GAOA Powell Duplex Improvements, Nez Perce - Clearwater National Forest | Forest Service | Total Small Business | |
| Access Road Repair National Elk Refuge | — | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity