Nez Perce Clearwater National Forest - Red River Work Center Wastewater Electrical Distribution and Solenoid Valve Project
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 1240LU24Q0052
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 23711 Water and Sewer Line and Related Structures Construction
- Place of performance
- Elk City, Idaho 83525, United States
Notice details come from SAM.gov. Updated .
About this opportunity
Paragraph 1:
The Department of Agriculture Forest Service is soliciting offers for a project to replace the wastewater electrical distribution and solenoid valve system at the Red River Work Center in the Nez Perce Clearwater National Forest. The work includes removing and disposing of existing sewer distribution vault piping, installing new hydraulically controlled solenoid valve manifolds, and installing new electrical wiring and custom controls. Contractors will be required to provide labor and materials for site work, excavation, piping, electrical, and other related trades. Proposals are due by August 5, 2024, and the government estimates the work will be completed by September 30, 2024.
Paragraph 2:
This contract opportunity is set aside for small businesses. The contract value is estimated to be between $100,000 and $250,000. The work will be performed in Elk City, Idaho. There is no incumbent contractor identified, and the government has provided detailed drawings, specifications, and clarifications to assist interested parties in submitting their offers.
Notice text
2 versions
Update #2 · Latest ·
Work for this project consists of providing labor and materials for the removal and disposal of the sewer distribution vault piping, installation of new hydraulically controlled solenoid valve manifolds within existing distribution vaults, and installation of new electrical wiring and custom control for valve operation. The work includes but is not limited to furnishing and installation of equipment and providing all labor in the general trades of work: site work, excavation, trenching and backfill, piping laying, electrical equipment installation, epoxy painting, and other related trades. Please read solicitation documents carefully, as well as sign and acknowledge amendment 0001.
Update #1 ·
Work for this project consists of providing labor and materials for the removal and disposal of the sewer distribution vault piping, installation of new hydraulically controlled solenoid valve manifolds within existing distribution vaults, and installation of new electrical wiring and custom control for valve operation. The work includes but is not limited to furnishing and installation of equipment and providing all labor in the general trades of work: site work, excavation, trenching and backfill, piping laying, electrical equipment installation, epoxy painting, and other related trades. Please read solicitation documents carefully.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Nez Perce Clearwater National Forest - Red River Work Center Wastewater Electrical Distribution and Solenoid Valve Project | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Fernan Ranger Station lift station electrical repair | Region 1 - Northern Region | Total Small Business | |
| Lagoon Aeration | Forest Service | Total Small Business | |
| GAOA Powell Duplex Improvements, Nez Perce - Clearwater National Forest | Forest Service | Total Small Business | |
| Oconaluftee Waterline Replacement | Forest Service | Total Small Business | |
| Ross Springs Waterline Replacement | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity