Nez Perce Clearwater National Forest - Red River Work Center Wastewater Electrical Distribution and Solenoid Valve Project

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
1240LU24Q0052
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Elk City, Idaho 83525, United States

Notice details come from SAM.gov. Updated .

About this opportunity

Paragraph 1:

The Department of Agriculture Forest Service is soliciting offers for a project to replace the wastewater electrical distribution and solenoid valve system at the Red River Work Center in the Nez Perce Clearwater National Forest. The work includes removing and disposing of existing sewer distribution vault piping, installing new hydraulically controlled solenoid valve manifolds, and installing new electrical wiring and custom controls. Contractors will be required to provide labor and materials for site work, excavation, piping, electrical, and other related trades. Proposals are due by August 5, 2024, and the government estimates the work will be completed by September 30, 2024.

Paragraph 2:

This contract opportunity is set aside for small businesses. The contract value is estimated to be between $100,000 and $250,000. The work will be performed in Elk City, Idaho. There is no incumbent contractor identified, and the government has provided detailed drawings, specifications, and clarifications to assist interested parties in submitting their offers.

Notice text

2 versions

Update #2 · Latest ·

Work for this project consists of providing labor and materials for the removal and disposal of the sewer distribution vault piping, installation of new hydraulically controlled solenoid valve manifolds within existing distribution vaults, and installation of new electrical wiring and custom control for valve operation. The work includes but is not limited to furnishing and installation of equipment and providing all labor in the general trades of work: site work, excavation, trenching and backfill, piping laying, electrical equipment installation, epoxy painting, and other related trades. Please read solicitation documents carefully, as well as sign and acknowledge amendment 0001.

Update #1 ·

Work for this project consists of providing labor and materials for the removal and disposal of the sewer distribution vault piping, installation of new hydraulically controlled solenoid valve manifolds within existing distribution vaults, and installation of new electrical wiring and custom control for valve operation. The work includes but is not limited to furnishing and installation of equipment and providing all labor in the general trades of work: site work, excavation, trenching and backfill, piping laying, electrical equipment installation, epoxy painting, and other related trades. Please read solicitation documents carefully.

Files

Notice history

Notice Type Posted
Nez Perce Clearwater National Forest - Red River Work Center Wastewater Electrical Distribution and Solenoid Valve Project Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Fernan Ranger Station lift station electrical repair Coeur d Alene, Idaho, United States · NAICS 238210 Region 1 - Northern Region Total Small Business
Lagoon Aeration Mammoth Cave, Kentucky 42259, United States · NAICS 221320 Forest Service Total Small Business
GAOA Powell Duplex Improvements, Nez Perce - Clearwater National Forest Kamiah, Idaho, United States · NAICS 236118 Forest Service Total Small Business
Oconaluftee Waterline Replacement Cherokee, North Carolina 28719, United States · NAICS 237110 Forest Service Total Small Business
Ross Springs Waterline Replacement Utah 84078, United States · NAICS 237110 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors