New fork vault toilet
Closed Solicitation Posted
- Solicitation number
- 140L6226Q0006
- Agency
- Wyoming Region Bureau of Land Management, Department of the Interior
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238120 Structural Steel and Precast Concrete Contractors
- Place of performance
- 625 West Pine Street Pinedale, Wyoming 82941, United States
- Points of contact
-
- Le, Huong hle@blm.gov (307) 775-6043
Notice details come from SAM.gov. Updated .
About this opportunity
The Bureau of Land Management Wyoming Region is soliciting proposals for the procurement and installation of a single precast concrete vault toilet at New Fork Campground in Sublette County, Wyoming. The contractor must supply a CXT Gunnison Style Left Hand Floor Plan Single vault toilet with specific design requirements including Barnwood textured walls in Sand Beige color and Cedar Shake textured roof in Nuss Brown color, capable of withstanding 250 pounds per square foot snow loads, 120 mile per hour winds, and Earthquake Zone 4 conditions while meeting ADA accessibility standards. The supplier must hold ISO 9001 and PCI certifications at the time of bid, with the concrete vault meeting strict specifications including minimum 610 pounds of cement per cubic yard, compressive strength minimums of 5000 psi at 28 days, and a seven-year leak warranty on the plastic liner. Evaluation will use Lowest Price Technically Acceptable (LPTA) source selection with a PASS/FAIL technical assessment requiring offerors to demonstrate completion of at least one similar project within the past five years and confirm schedule compliance. Questions must be submitted by April 9, 2026 at 2:00 PM MST, with proposals due by April 21, 2026 at 2:00 PM MST to hle@ios.doi.gov.
This is a Total Small Business Set-Aside with an estimated contract value between $25,000 and $100,000 for a firm fixed-price construction award. The performance period runs from June 1, 2026 to September 1, 2026, with a mandatory 70-calendar-day completion deadline following notice to proceed and a requirement to commence work within 10 calendar days of that notice. The work will be performed at New Fork Campground, 625 W Pine Street, Pinedale, Wyoming 82941. Contractors must provide performance and payment bonds within 10 days of award and carry liability insurance including $100,000 workers' compensation, $500,000 general liability, and $200,000-$500,000 automobile liability coverage. Prevailing wage requirements apply to this construction project as established by the Department of Labor wage determination for heavy construction in Wyoming, with rates ranging from $21.68 to $58.83 per hour depending on occupation classification.
Notice text
BLM-WY-NEW FORK VAULT TOILET INSTALLATION
Attachments
| File | Type | Posted |
|---|---|---|
| Sol_140L6226Q0006_Amd_0001.pdf | ||
| Sol_140L6226Q0006.pdf | ||
| 4_Wage_Determination_REV_DATE_01_2026.pdf | ||
| 2_Site_Location_Map.pdf | ||
| 3_BID_SCHEDULE.xlsx | XLSX spreadsheet | |
| 5_SF_1442_Completion_Instructions.pdf | ||
| 1_STATEMENT_OF_WORK.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity