Negrito Well
Closed Pre-Solicitation Posted
- Solicitation number
- 1153055
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 221310 Water Supply and Irrigation Systems
- Place of performance
- Reserve, New Mexico 87830, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Agriculture Forest Service is seeking contractors to construct a new well at the Negrito Fire Base in the Gila National Forest to replace an existing well system that has been deemed irreparable due to a crushed drop pipe and fallen pitless adapter. The project scope includes drilling, casing installation, surface preparation, and complete assembly of a functional water system that connects to the existing distribution infrastructure. Contractors must provide all labor, tools, equipment, materials, and obtain necessary permits while ensuring compliance with federal, state, and local regulations. The new well must be positioned as close as possible to the existing well location and fully integrated with the current distribution system. This pre-solicitation notice was posted on September 15, 2025, with responses due by September 17, 2025, providing only two days for interested parties to submit their proposals.
This opportunity is designated as a Total Small Business set-aside, restricting competition to qualified small business entities. The contract establishes an aggressive timeline requiring all deliverables to be completed within seven calendar days of project start, including full well system restoration, all necessary documentation and permits, and a final walkthrough with the Contracting Officer's Representative. The overall period of performance mandates project completion by November 10, 2025, providing approximately eight weeks from the solicitation due date to final delivery. The contractor will utilize previously purchased well components as part of the installation process, though specific quantities or component details are not specified in the available documentation. No incumbent contractor information or estimated contract values are disclosed in this pre-solicitation phase.
Notice text
The contractor shall construct a new well at the Negrito Fire Base to replace the existing well system, which was deemed irreparable due to a crushed drop pipe and fallen pitless adaptor. Work shall include drilling, casing installation, surface prep, and complete assembly of a functional water system. All work must comply with applicable federal, state, and local regulations. The well should be as close as to the existing well as possible/feasible and should be connected into the existing distribution system. Contractor is responsible for all labor, tools, equipment, permitting, and materials.
PERIOD OF PERFORMANCE: Must be completed by 10 November 2025
Files
| File | Type | Posted |
|---|---|---|
| Negrito Well SOW SS.docx | DOCX document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Gray wall livestock water well | National Office | Total Small Business | |
| Loleta Water System Upgrades | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity