NAVFAC NW (N44255) P447 - Dry Dock 4 and Pier 3 Modernization, Naval Base Kitsap, Bremerton, WA

Pre-Solicitation Posted

Not the latest version. See the latest solicitation from .

Solicitation number
N44255-20-R-5002
Agency
Responses due
Not on record
Set-aside
No set-aside

Opportunity facts

Place of performance
Bremerton, Washington 98314, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This procurement is for the design-bid-build construction of Military Construction project P447 Dry Dock 4 & Pier 3 Modernization at Naval Base Kitsap Bremerton, WA. The Naval Facilities Engineering Command will evaluate proposals and award a firm-fixed-price construction contract to the responsible offeror whose proposal is technically acceptable with the lowest total price based on factors including experience, past performance, safety, technical approach, and small business utilization. The solicitation will be available on SAM.gov on or about December 20, 2019 with proposals due shortly thereafter.

There is no set-aside designation for this procurement. The North American Industry Classification Standard code is 237130 for heavy and civil engineering construction with an annual size standard of $39.5 million. The estimated total contract price range is between $25 million and $100 million to construct new electrical substations and alter dry dock and pier electrical distribution systems at the Puget Sound Naval Shipyard.

Notice text

2 versions

Update #2 · Latest ·

Description: 

The North American Industry Classification Standard (NAICS) is 237130 and the annual size standard is $39.5 million.

This procurement is for the design-bid-build (DBB) construction of Military Construction (MCON) project P447 Dry Dock 4 & Pier 3 Modernization at Naval Base Kitsap (NBK) Bremerton, WA.

This procurement uses the source selection procedures in accordance with FAR Part 15, and will be solicited utilizing unrestricted full and open competition in accordance with FAR 6.1.

Notice to Large firms:  a subcontracting plan is required prior to award.

Source Selection procedures will be used with the intent to award a firm-fixed-price construction contract to the responsible Offeror whose proposal, conforming to the Request for Proposal (RFP), offers the lowest-priced, technically acceptable option to the Government, using the Lowest-Priced, Technically Acceptable (LPTA) tradeoff source selection process.   The LPTA tradeoff process is being utilized because it is in the Government’s best interest to consider award to the lowest price, technically acceptable Offeror.   

This project constructs new Electrical Substations 3A, 3B, 3C, SW, NW, NE, and SE including transformers, switch gear and associated feeders. Alters Dry Dock 4 electrical distribution systems serving nuclear ship shore power and industrial power; encloses service utility galleries to prevent flooding during docking operations. Alters Pier 3 electrical distribution system serving nuclear ship electrical shore industrial power; repairs existing piles. Demolishes Electrical Substations 45, 3A, 3B, 3C.

The project will be located at the Puget Sound Naval Shipyard (PSNS) on NBK Bremerton, WA. The projects location is in a controlled industrial area (CIA) with heightened security.  The estimated total contract price range, in accordance with DFARS 236.204, is between $25,000,000 and $100,000,000.

The following Contract Line Item Number (CLIN) structure, a base bid and four option items, is anticipated for this action:

CLIN 0001 (Base Bid) FFP for all labor, materials and equipment and associated costs in accordance with (IAW) RFP for P447 (excluding all work associated with CLINs 0002-0005).

CLIN 0002 (Option Item One) FFP for all labor, materials and equipment and associated costs IAW RFP for Substation 43B.

CLIN 0003 (Option Item Two)  FFP for all labor, materials and equipment and associated costs IAW RFP for Substation 3A Low Voltage.

CLIN 0004 (Option Item Three)  FFP for all labor, materials and equipment and associated costs IAW RFP for Medium voltage equipment and wiring for Substation 3A Medium Voltage.

CLIN 0005 (Option Item Four) FFP for all labor, materials and equipment and associated costs IAWRFP for Freshwater Outlets.

This procurement shall be in accordance with Buy American clauses FAR 52.225-11 and 12. The firm needs to be able to demonstrate knowledge, current relevant qualifications, experience, bonding, and the capability to perform a construction contract similar to the scope indicated.

The Government intends to evaluate proposals and award without discussions. Selection for award will be based on evaluation of the following:

Factor 1 – Experience (Construction)

Factor 2 – Past Performance

Factor 3 – Safety

Factor 4 – Technical Approach (Construction)

Factor 5 – Small Business Utilization

            Price

 THE SOLICITATION WILL BE AVAILABLE IN ELECTRONIC FORMAT ONLY.

 The RFP will be posted on the Government point of entry website https://beta.SAM.gov under “Contract Opportunities” (Legacy website www.fbo.gov) on or about December 20, 2019. No hard copies will be provided. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. 

No reimbursement will be made for any costs associated with this announcement, attending pre-proposal conferences or any follow-up information requests. 

NAVFAC Northwest will issue one solicitation with the intent to award a single firm-fixed-price (FFP) Construction Contract to the responsible Offeror whose proposal, conforming to the RFP, is technically acceptable with the lowest total price. OFFERORS ARE ADVISED THE GOVERNMENT FULLY INTENDS TO EVALUATE PROPOSALS AND AWARD THE CONTRACT WITHOUT DISCUSSIONS WITH OFFERORS OR ANY CONTACT CONCERNING THE PROPOSAL RECEIVED.  THEREFORE, OFFERORS’ INITIAL PROPOSALS SHOULD CONTAIN THE OFFERORS’ BEST TERMS. 

Update #1 ·

Description: 

The North American Industry Classification Standard (NAICS) is 237130 and the annual size standard is $39.5 million.

This procurement is for the design-bid-build (DBB) construction of Military Construction (MCON) project P447 Dry Dock 4 & Pier 3 Modernization at Naval Base Kitsap (NBK) Bremerton, WA.

This procurement uses the source selection procedures in accordance with FAR Part 15, and will be solicited utilizing unrestricted full and open competition in accordance with FAR 6.1.

Source Selection procedures will be used with the intent to award a firm-fixed-price construction contract to the responsible Offeror whose proposal, conforming to the Request for Proposal (RFP), offers the lowest-priced, technically acceptable option to the Government, using the Lowest-Priced, Technically Acceptable (LPTA) tradeoff source selection process.   The LPTA tradeoff process is being utilized because it is in the Government’s best interest to consider award to the lowest price, technically acceptable Offeror.   

This project constructs new Electrical Substations 3A, 3B, 3C, SW, NW, NE, and SE including transformers, switch gear and associated feeders. Alters Dry Dock 4 electrical distribution systems serving nuclear ship shore power and industrial power; encloses service utility galleries to prevent flooding during docking operations. Alters Pier 3 electrical distribution system serving nuclear ship electrical shore industrial power; repairs existing piles. Demolishes Electrical Substations 45, 3A, 3B, 3C.

The project will be located at the Puget Sound Naval Shipyard (PSNS) on NBK Bremerton, WA. The projects location is in a controlled industrial area (CIA) with heightened security.  The estimated total contract price range, in accordance with DFARS 236.204, is between $25,000,000 and $100,000,000.

This procurement shall be in accordance with Buy American clauses FAR 52.225-11 and 12. The firm needs to be able to demonstrate knowledge, current relevant qualifications, experience, bonding, and the capability to perform a construction contract similar to the scope indicated.

The Government intends to evaluate proposals and award without discussions. Selection for award will be based on evaluation of the following:

Factor 1 – Experience (Construction)

Factor 2 – Past Performance

Factor 3 – Safety

Factor 4 – Technical Approach (Construction)

Factor 5 – Small Business Utilization

            Price

 THE SOLICITATION WILL BE AVAILABLE IN ELECTRONIC FORMAT ONLY.

 The RFP will be posted on the Government point of entry website https://beta.SAM.gov under “Contract Opportunities” (Legacy website www.fbo.gov) on or about December 20, 2019. No hard copies will be provided. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CHECK THE WEBSITE PERIODICALLY FOR ANY AMENDMENTS TO THE SOLICITATION. 

No reimbursement will be made for any costs associated with this announcement, attending pre-proposal conferences or any follow-up information requests. 

NAVFAC Northwest will issue one solicitation with the intent to award a single firm-fixed-price (FFP) Construction Contract to the responsible Offeror whose proposal, conforming to the RFP, is technically acceptable with the lowest total price. OFFERORS ARE ADVISED THE GOVERNMENT FULLY INTENDS TO EVALUATE PROPOSALS AND AWARD THE CONTRACT WITHOUT DISCUSSIONS WITH OFFERORS OR ANY CONTACT CONCERNING THE PROPOSAL RECEIVED.  THEREFORE, OFFERORS’ INITIAL PROPOSALS SHOULD CONTAIN THE OFFERORS’ BEST TERMS. 

Notice history

Notice Type Posted
Amendment 0009 Latest solicitation Solicitation
This notice Pre-Solicitation
NAVFAC NW (N44255) P447 - Dry Dock 4 and Pier 3 Modernization, Naval Base Kitsap, Bremerton, WA Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors