About this opportunity

The USDA National Centers for Animal Health (NCAH) in Ames, IA, requires a contractor to convert Buildings C3 and C4 from propane to natural gas and extend the existing natural gas fuel line to Building C8 for future conversion. The contractor will be responsible for providing all materials, equipment, labor, and design work, including the installation of new HDPE natural gas fuel lines, regulators, and meters, and the conversion of existing equipment from propane to natural gas. The project is expected to be completed within 180 days from the "Notice to Proceed" and the estimated award date is 5/22/2023.

Products and Services to be provided:

  1. Installation of new 1-inch HDPE natural gas fuel lines to Buildings C3 and C4.
  2. Installation of new 2-inch HDPE, 30 psig fuel line to Building C8.
  3. Installation of new regulators and meters for Buildings C3 and C4.
  4. Conversion of existing equipment from Propane to Natural Gas.
  5. Repair and restoration of all ground disturbed during the project to match existing surrounding construction and finish.

Notice text

4 versions

Update #4 · Latest ·

The U.S. Department of Agriculture, Animal and Plant Health Inspection Service, intends to issue a request for quotes to convert two buildings from propane to natural gas and to extend an existing natural gas fuel line to another building for future conversion. The project is located on the USDA campus in Ames, IA.

Work includes installing new 1-inch HDPE natural gas fuel lines. New fuel lines to be connected and supplied from an existing 2-inch HDPE, 30 psig fuel line. It also includes installing new regulators and meters and converting existing equipment from propane to natural gas.

The estimated magnitude of the project is between $25,000 and $100,000. Solicitation and attachments are posted below.

Contractor questions and site visit attendance posted below.

Amendment 0001 is attached below. This solicitation is open to all interested parties--full and open competition.

Amendment 0002 is posted below. It corrects the due date for receipt of quotes.

Update #3 ·

The U.S. Department of Agriculture, Animal and Plant Health Inspection Service, intends to issue a request for quotes to convert two buildings from propane to natural gas and to extend an existing natural gas fuel line to another building for future conversion. The project is located on the USDA campus in Ames, IA.

Work includes installing new 1-inch HDPE natural gas fuel lines. New fuel lines to be connected and supplied from an existing 2-inch HDPE, 30 psig fuel line. It also includes installing new regulators and meters and converting existing equipment from propane to natural gas.

The estimated magnitude of the project is between $25,000 and $100,000. Solicitation and attachments are posted below.

Contractor questions and site visit attendance posted below.

Amendment 0001 is attached below. This solicitation is open to all interested parties--full and open competition.

Update #2 ·

The U.S. Department of Agriculture, Animal and Plant Health Inspection Service, intends to issue a request for quotes to convert two buildings from propane to natural gas and to extend an existing natural gas fuel line to another building for future conversion. The project is located on the USDA campus in Ames, IA.

Work includes installing new 1-inch HDPE natural gas fuel lines. New fuel lines to be connected and supplied from an existing 2-inch HDPE, 30 psig fuel line. It also includes installing new regulators and meters and converting existing equipment from propane to natural gas.

The estimated magnitude of the project is between $25,000 and $100,000. Solicitation and attachments are posted below.

Contractor questions and site visit attendance posted below.

Update #1 ·

The U.S. Department of Agriculture, Animal and Plant Health Inspection Service, intends to issue a request for quotes to convert two buildings from propane to natural gas and to extend an existing natural gas fuel line to another building for future conversion. The project is located on the USDA campus in Ames, IA.

Work includes installing new 1-inch HDPE natural gas fuel lines. New fuel lines to be connected and supplied from an existing 2-inch HDPE, 30 psig fuel line. It also includes installing new regulators and meters and converting existing equipment from propane to natural gas.

The estimated magnitude of the project is between $25,000 and $100,000. Solicitation and attachments are posted below.

Files

File Type Posted
12639523Q0201-0002.pdf PDF
12639523Q0201-0001.pdf PDF
Atch 2_SOW Bldg C3 C4 C8 Nat Gas Supply.docx DOCX document
Site visit attendance.pdf PDF
Contractor questions.docx DOCX document
12639523Q0201.pdf PDF
Atch 2_SOW Bldg C3 C4 C8 Nat Gas Supply.docx DOCX document
Atch 3_Drawings_Bldgs C3 C4 C8.pdf PDF
Atch 1_Federal Construction Wage Rates_Story County.pdf PDF

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Natural Gas Fuel Lines, Ames Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity