Contractor questions.docx

DOCX document 25 KB Posted

Attached to
Natural Gas Fuel Lines, Ames
Solicitation number
12639523Q0201
Issued by

View the file

Other files

File Type Posted
12639523Q0201-0002.pdf PDF
Atch 2_SOW Bldg C3 C4 C8 Nat Gas Supply.docx DOCX document
12639523Q0201-0001.pdf PDF
Site visit attendance.pdf PDF
Atch 1_Federal Construction Wage Rates_Story County.pdf PDF
Atch 2_SOW Bldg C3 C4 C8 Nat Gas Supply.docx DOCX document
Atch 3_Drawings_Bldgs C3 C4 C8.pdf PDF
12639523Q0201.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

· If we trench the gas line in with an 8” wide trencher, is there a compaction requirement?

There is no compaction requirement.

· Is it acceptable to bring the 1” lines to C3 and C4 the best way, avoiding cutting the existing concrete?

Yes, the route will need to be approved by the UDSA and meter sets will need to be located per the drawings.

· Are bollards going to be required at the meter settings and how many for each?

Four bollards will be needed per meter set, and they’ll need to be ground installed (not surface mounted).