Contractor questions.docx
DOCX document 25 KB Posted
- Attached to
- Natural Gas Fuel Lines, Ames
- Solicitation number
- 12639523Q0201
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12639523Q0201-0002.pdf | ||
| Atch 2_SOW Bldg C3 C4 C8 Nat Gas Supply.docx | DOCX document | |
| 12639523Q0201-0001.pdf | ||
| Site visit attendance.pdf | ||
| Atch 1_Federal Construction Wage Rates_Story County.pdf | ||
| Atch 2_SOW Bldg C3 C4 C8 Nat Gas Supply.docx | DOCX document | |
| Atch 3_Drawings_Bldgs C3 C4 C8.pdf | ||
| 12639523Q0201.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
· If we trench the gas line in with an 8” wide trencher, is there a compaction requirement?
There is no compaction requirement.
· Is it acceptable to bring the 1” lines to C3 and C4 the best way, avoiding cutting the existing concrete?
Yes, the route will need to be approved by the UDSA and meter sets will need to be located per the drawings.
· Are bollards going to be required at the meter settings and how many for each?
Four bollards will be needed per meter set, and they’ll need to be ground installed (not surface mounted).