About this opportunity
The Department of the Interior's Interior Business Center, Acquisition Services Directorate, on behalf of the National Park Service, intends to solicit design-build services for the NAMA 326209 East Potomac Seawall rehabilitation, with issuance on or around 11/30/2026. The procurement will be solicited on an unrestricted basis with no set-aside. Phase One submittals are due within 15 days of issuance, and the requirement is currently unfunded, with a high expectation that funds will be available.
The scope covers rehabilitation of approximately 20,700 linear feet of shoreline and seawall at East Potomac Park in Washington, DC, along the Potomac River and Washington Channel. The contractor develops rehabilitation alternatives for NPS evaluation and approval, then implements the selected solution. Objectives include restoring shoreline function against tidal cycles, storm events, erosion, ice forces, and long-term settlement, and establishing the historic functional height for shoreline segments.
The contract is firm-fixed-price with three contract line items: design (CD and DD), Z-panel wall construction, and stamped concrete wall construction. All construction must be completed within 51 months of award, with liquidated damages of $2,023 per calendar day of delay. Contractors must demonstrate bonding capacity of at least $322 million, comply with Davis-Bacon wage requirements, and cap A/E design services at 6 percent of estimated construction costs. Key personnel include a project manager, jobsite superintendent, A/E project manager, landscape architect, arborist, and turf manager, with substitution restrictions during the first 120 calendar days.
Phase One evaluates General Technical Approach, Technical Qualifications, and Past Performance, with price not considered. Up to three contractors advance to Phase Two, with responses due within 30 days of notification. Phase Two evaluates equal-weight non-price factors (Technical Solution, Schedule, Small Business Participation) and price on a best-value tradeoff basis, with non-price factors significantly more important than price.
The NAICS code is 237990, the PSC is Y1PZ, and the small business size standard is $45 million. Attachments include the draft solicitation SOL_140D0427RP001_EPP_Seawall_DB_draft_1.pdf, Attachment A (available through an external hyperlink; contact the Contracting Officer if inaccessible), and Attachment B, an aerial project map.
Notice text
The Department of the Interior (DOI), Interior Business Center (IBC), Acquisition Services Directorate (AQD) on behalf of the National Park Service (NPS) intends to issue a solicitation to interested businesses with the capability to perform the work described below. Interested parties must maintain an active SAM registration. The procurement will be solicited on an unrestricted basis.
This pre-solicitation announcement is not a solicitation document, but pre-notice of an upcoming solicitation ONLY. While the Government is not requesting proposals currently, a draft solicitation and pertinent attachments are attached for review and consideration.
Proposed Solicitation Issuance Date: On or around 11/30/2026 with Phase One submittals due within 15 days of issuance. See the draft solicitation for instructions and evaluation factors for Phase One.
This is currently an unfunded requirement with a high expectation that funds will be available.
Project Title: NAMA 326209 EAST POTOMAC SEAWALL DESIGN BUILD
Description:
NPS requires Design-Build (DB) services for the rehabilitation of approximately 20,700 linear feet of shoreline and seawall infrastructure at East Potomac Park in Washington, DC. The project area includes the shoreline along both the Potomac River and Washington Channel and encompasses associated improvements required to provide long-term shoreline protection, improve drainage performance, preserve public access and protect Park resources.
The Contractor shall develop rehabilitation alternatives for NPS evaluation and approval, and implement solutions that satisfy the following project objectives:
* Rehabilitate or replace deteriorated shoreline protection infrastructure;
* Restore shoreline functionality and reduce impacts associated with daily tidal cycles, minor storm events, erosion, debris loading, ice forces, and long-term settlement;
* Evaluate and establish the appropriate historic functional height for shoreline segments within the Park based on historical documentation, engineering analysis, site conditions, and the NPS objectives;
* Evaluate opportunities to accommodate future shoreline adaptation measures consistent with NPS planning objectives;
* Reuse and repurpose existing seawall materials where feasible and appropriate;
* Maintain drainage and flood recovery performance;
* Maintain, restore, and develop continuous public access to include Architectural Barriers Act (ABA)-compliant and universal access circulation routes;
* Protect existing utilities and adjacent infrastructure;
* Preserve historic, cultural, and environmental resources;
* Incorporate sustainable, durable, and low operations and maintenance solutions that minimize future operational burden on the NPS.
Type of Procurement:
Two-Phase Design-Build Selection Procedures (FAR 36.101-2 as deviated). The Government anticipates awarding one firm-fixed price contract for the design and construction services required. One solicitation will be issued with the Phase 1 and Phase 2 requirements. A draft solicitation is attached for review and consideration.
Estimated Price Range: More than $10,000,000.
Estimated Period of Performance: 51 months after award
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| East Bulkhead Replacement, East Boat Basin, Cape Cod Canal, Sandwich MA | ENDIST New England | Total Small Business | |
| Request for Proposal EFMO 224159/318539, Rehabilit | — | No set-aside | |
| NJ-NY ERFO FW WARI 2019-1(1) - Wallkill River National Wildlife Refuge | Federal Highway Administration | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity