MT FLAP BOR 2980(1), Sun River Bridge Replacement
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 69056724B000016
- Agency
- Federal Highway Administration Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Augusta, Montana 59410, United States
- Points of contact
-
- Contracts G. Office contracts@mail.wfl.fhwa.dot.gov (360) 619-7520
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Transportation Federal Highway Administration is seeking responses from contractors for the MT FLAP BOR 2980(1), Sun River Bridge Replacement project. The work consists of building a new 3-span, 462-foot long precast-post-tensioned girder bridge with precast concrete deck, along with new approach embankments and MSE walls. The final surface will be gravel for the approaches and concrete on the bridge. The Government is seeking responses from contractors with the necessary experience and resources to perform this work, including details on company information, relevant past experience, and bonding capacity. Responses are due by May 27, 2024. This Sources Sought Notice is for market research purposes only and does not commit the Government to a solicitation or contract award.
The contract opportunity is not set-aside for any specific designation. The estimated value of the project is between $10-$20 million. The project is located approximately 50 miles northwest of Augusta, Montana and includes the construction of a new 462-foot long bridge to replace an existing bridge.
Notice text
This work consists of: building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge.The project includes construction of a 3 span, 462-foot long precast-post-tensioned girder bridge with a precast concrete deck. Abutments are founded on both spread footing and piles within an MSE wall fill. Piers are supported on 10 foot diameter drilled shafts.
Attachments
| File | Type | Posted |
|---|---|---|
| MT FLAP BOR 2980(1) Sun River Bridge Replacement.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| MT FLAP BOR 2980(1), Sun River Bridge Replacement | Award Notice | |
| MT FLAP BOR 2980(1), Sun River Bridge Replacement | Solicitation | |
| MT FLAP BOR 2980(1), Sun River Bridge Replacement | Pre-Solicitation | |
| MT FLAP BOR 2980(1), Sun River Bridge Replacement | Pre-Solicitation |