MT FLAP BOR 2980(1), Sun River Bridge Replacement
Awarded Award Notice Posted
- Solicitation number
- 69056725C000006
- Agency
- Federal Highway Administration Department of Transportation
- Awarded
- to Hamilton Construction Co
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- 69056725C000006 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Augusta, Montana 59410, United States
- Points of contact
-
- Contracts G. Office contracts@mail.wfl.fhwa.dot.gov (360) 619-7520
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Highway Administration has awarded a contract (ID 69056725C000006) to Hamilton Construction CO for the Sun River Bridge Replacement project located in Lewis and Clark and Teton Counties, Montana, with a total contract value of $16,391,289. The project involves constructing a new 462-foot long precast-post-tensioned girder bridge approximately 200 feet downstream from the existing bridge, featuring three spans and concrete deck, with supporting infrastructure including abutments on spread footings and piles, and piers supported by 10-foot diameter drilled shafts. The project scope encompasses 0.36 miles of roadway, includes new embankment and MSE wall approaches, and potentially includes an optional demolition of the existing steel truss bridge upon completion of the new structure, with gravel approaches and concrete bridge surfacing.
Notice text
MT FLAP BOR 2980(1), Sun River Bridge Replacement
Helena-Lewis and Clark National Forest, Lewis and Clark County, Teton County, Montana
The work consists of building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge.
The project includes construction of a 3 span, 462-foot long precast-post-tensioned girder bridge with a precast concrete deck. Abutments are founded on both spread footing and piles within an MSE wall fill. Piers are supported on 10 foot diameter drilled shafts. The work may include as an Option demolition of the existing steel truss bridge upon completion of the new structure.
Project length: 0.36 miles
Awarded contract 69056725C000006 to Hamilton Construction CO for 16391289.00 on 2025-01-13.
Notice history
| Notice | Type | Posted |
|---|---|---|
| MT FLAP BOR 2980(1), Sun River Bridge Replacement | Award Notice | |
| MT FLAP BOR 2980(1), Sun River Bridge Replacement | Solicitation | |
| MT FLAP BOR 2980(1), Sun River Bridge Replacement | Pre-Solicitation | |
| MT FLAP BOR 2980(1), Sun River Bridge Replacement | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity