Mpld lift gate fabrication supply

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912P921R0049
Agency
ENDIST St Louis US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
332312 Fabricated Structural Metal Manufacturing
PSC
5450 Miscellaneous Prefabricated Structures
Place of performance
East Alton, Illinois 62024, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks proposals for the fabrication and delivery of replacement lift gates for the Melvin Price Lock & Dam main lock. The U.S. Army Corps of Engineers, St. Louis District requires a contractor to fabricate two steel lift gate leaves, each over 110 feet wide and approximately 24 feet high. The upstream leaf weighs around 400,000 pounds and the downstream leaf around 475,000 pounds. The selected offeror must furnish all labor, equipment, materials, and incidentals necessary to perform the steel fabrication and deliver the replacement lift gates. Questions are due by July 12, 2021 and proposals are due by July 30, 2021. The award will be made based on an assessment of technical approach, past performance, small business participation commitment, and price.

There is no set-aside designation for this requirement. The NAICS code is 332312, and the PSC code is 5132. The incumbent is the U.S. Army Corps of Engineers, St. Louis District. The location for fabrication and delivery is Melvin Price Locks and Dam in East Alton, Illinois. The contract is for fabrication of two lift gates, with an upstream leaf weighing approximately 400,000 pounds and a downstream leaf weighing approximately 475,000 pounds. Installation will be conducted under a separate future contract by the U.S. Army Corps of Engineers.

Notice text

2 versions

Update #2 · Latest ·

The U.S. Army Corps of Engineers, St. Louis District, is seeking a firm to fabricate a replacement lift gate for the Melvin Price Lock & Dam main gate, which is a hydraulic steel structure that consists of two individual lift gate leaves. Each replacement lift gate leaf is 24-feet in height and over 110-feet wide. The depth of the upstream lift gate leaf is approximately 9-feet, while the depth of the downstream lift gate leaf is approximately 10-feet. The upstream lift gate leaf weighs approximately 400,000 pounds, while the downstream lift gate leaf weighs approximately 475,000 pounds.

The work covered by this contract consists of furnishing all labor, equipment, operators, supervision, supplies and materials and incidentals necessary to perform steel fabrication and delivery of the replacement lift gate for Melvin Price Lock & Dam Main Lock.

Please see all Attachments for Solicitation requirements.

Questions are due by 10:00am CST, 12 July 2021 via email to Contract Specialist, Whitney Dee.

AMENDMENT 0001 includes the following attachments:

Solicitation - W912P921R0049 - Amendment 0001

Attachment 2 - Plans - Amendment 0001

Questions and Government Answers - Amendment 0001

Update #1 ·

The U.S. Army Corps of Engineers, St. Louis District, is seeking a firm to fabricate a replacement lift gate for the Melvin Price Lock & Dam main gate, which is a hydraulic steel structure that consists of two individual lift gate leaves. Each replacement lift gate leaf is 24-feet in height and over 110-feet wide. The depth of the upstream lift gate leaf is approximately 9-feet, while the depth of the downstream lift gate leaf is approximately 10-feet. The upstream lift gate leaf weighs approximately 400,000 pounds, while the downstream lift gate leaf weighs approximately 475,000 pounds.

The work covered by this contract consists of furnishing all labor, equipment, operators, supervision, supplies and materials and incidentals necessary to perform steel fabrication and delivery of the replacement lift gate for Melvin Price Lock & Dam Main Lock.

Please see all Attachments for Solicitation requirements.

Questions are due by 10:00am CST, 12 July 2021 via email to Contract Specialist, Whitney Dee.

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Mpld lift gate fabrication supply Award Award Notice
Mpld lift gate fabrication supply This notice · Latest solicitation Solicitation
Mpld lift gate replacement Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity