Mountain Bike Trail Plan and Site Assessment for Fort Leonard Wood, MO

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9132T19T0008
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

. MAJOR REQUIREMENTS: In order to complete the work the Contractor shall complete 3. MAJOR REQUIREMENTS: In order to complete the work the Contractor shall complete the following tasks consistent with the level of quality indicated in the Performance Requirements Summary (PRS) below:
a. Task 1: The contractor shall conduct site tours and accomplish a detailed site assessment (on Post at Fort Leonard Wood), develop a concept plan, and develop a conceptual design report creation for a multi-phase trail development concept which can be implemented in phases for up to 8 to 10 miles of trail.
b. Task 2: The contractor shall conduct a stakeholder meeting (on Post at Fort Leonard Wood) to present findings and provide time for concept plan review and approval by a government stakeholder group.
c. Task 3: The contractor shall deliver a completed "approved" concept plan document inclusive of plan drawing/graphic noting the location of the phases and two (2) cost estimates, one (1) cost estimate for building the trail with volunteer labor and professional guidance, and one (1) cost estimate using a professional trail builder.
.

Update #1 ·

. MAJOR REQUIREMENTS: In order to complete the work the Contractor shall complete the following tasks consistent with the level of quality indicated in the Performance Requirements Summary (PRS) below:
a. Task 1: The contractor shall conduct site tours and accomplish a detailed site assessment (on Post at Fort Leonard Wood), develop a concept plan, and develop a conceptual design report creation for a multi-phase trail development concept which can be implemented in phases for up to 8 to 10 miles of trail.

b. Task 2: The contractor shall conduct a stakeholder meeting (on Post at Fort Leonard Wood) to present findings and provide time for concept plan review and approval by a government stakeholder group.


c. Task 3: The contractor shall conduct actual field flagging of the first phase of trail based on the approved concept plan, followed by GPS tracking of all flagged alignments.


d. Task 4: The contractor shall deliver a completed "approved" concept plan document inclusive of plan drawing/graphic noting the location of the phases, include GPS data of all flagging first phase alignments, and two (2) cost estimates, one (1) cost estimate for building the trail with volunteer labor and professional guidance, and one (1) cost estimate using a professional trail builder.

.

Files

File Type Posted
B08.02_Attachment_WageDetermination_Pulaski_County.pdf PDF
B08.03_W9132T19T0008_Questions_and_Answers_Document.docx DOCX document
B08.03_W9132T19T0008_U01.docx DOCX document
B08.02_W9132T19T0008_Final.docx DOCX document

Notice history

Notice Type Posted
Mountain Bike Trail Plan and Site Assessment for Fort Leonard Wood, MO Award Award Notice
This notice Latest solicitation Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors