Mountain Bike Trail Plan and Site Assessment for Fort Leonard Wood, MO
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9132T19T0008
- Agency
-
Engineer Research and Development Center
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 541620 Environmental Consulting Services
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
. MAJOR REQUIREMENTS: In order to complete the work the Contractor shall complete 3. MAJOR REQUIREMENTS: In order to complete the work the Contractor shall complete the following tasks consistent with the level of quality indicated in the Performance Requirements Summary (PRS) below:
a. Task 1: The contractor shall conduct site tours and accomplish a detailed site assessment (on Post at Fort Leonard Wood), develop a concept plan, and develop a conceptual design report creation for a multi-phase trail development concept which can be implemented in phases for up to 8 to 10 miles of trail.
b. Task 2: The contractor shall conduct a stakeholder meeting (on Post at Fort Leonard Wood) to present findings and provide time for concept plan review and approval by a government stakeholder group.
c. Task 3: The contractor shall deliver a completed "approved" concept plan document inclusive of plan drawing/graphic noting the location of the phases and two (2) cost estimates, one (1) cost estimate for building the trail with volunteer labor and professional guidance, and one (1) cost estimate using a professional trail builder.
.
Update #1 ·
. MAJOR REQUIREMENTS: In order to complete the work the Contractor shall complete the following tasks consistent with the level of quality indicated in the Performance Requirements Summary (PRS) below:
a. Task 1: The contractor shall conduct site tours and accomplish a detailed site assessment (on Post at Fort Leonard Wood), develop a concept plan, and develop a conceptual design report creation for a multi-phase trail development concept which can be implemented in phases for up to 8 to 10 miles of trail.
b. Task 2: The contractor shall conduct a stakeholder meeting (on Post at Fort Leonard Wood) to present findings and provide time for concept plan review and approval by a government stakeholder group.
c. Task 3: The contractor shall conduct actual field flagging of the first phase of trail based on the approved concept plan, followed by GPS tracking of all flagged alignments.
d. Task 4: The contractor shall deliver a completed "approved" concept plan document inclusive of plan drawing/graphic noting the location of the phases, include GPS data of all flagging first phase alignments, and two (2) cost estimates, one (1) cost estimate for building the trail with volunteer labor and professional guidance, and one (1) cost estimate using a professional trail builder.
.
Files
| File | Type | Posted |
|---|---|---|
| B08.02_Attachment_WageDetermination_Pulaski_County.pdf | ||
| B08.03_W9132T19T0008_Questions_and_Answers_Document.docx | DOCX document | |
| B08.03_W9132T19T0008_U01.docx | DOCX document | |
| B08.02_W9132T19T0008_Final.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Mountain Bike Trail Plan and Site Assessment for Fort Leonard Wood, MO | Award Notice | |
| This notice | Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity