Monongahela National Forest Temporary Bridge Relocation
Closed Solicitation Posted
- Solicitation number
- 12445524Q0072
- Agency
- Forest Service Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Richwood, West Virginia 26261, United States
- Points of contact
-
- Clark A. Bartelt clark.a.bartelt@usda.gov (218) 409-8332
- Brad Higley bradley.higley@usda.gov (218) 409-8332
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Forest Service is seeking a contractor to load, haul, deliver, and install a 50-foot temporary bridge and wooden abutments from the Black Mountain storage site to Forest Road 914A near Richwood, West Virginia. The scope of work includes furnishing materials, equipment, and labor to construct stone approaches at each end of the structure to blend the bridge elevation with the existing road grade. Offers will be evaluated based on past performance, experience, technical approach, and price to determine the best value for the government. The deadline for submitting offers is June 18, 2024, and the performance period is 60 calendar days after award.
This procurement is a 100% small business set-aside under NAICS code 237310 (Highway, Street, and Bridge Construction) with a $45 million size standard. The bridge weighs approximately 30,000 lbs., and the pickup location is at 38°18'21.568"N 80°12'14.516"W, while the installation location is at 38°20'30.588"N 80°22'26.974"W, both within the Monongahela National Forest in West Virginia.
Notice text
This project is 100% set aside for small business under NAICS code 237310, size standard $45M.
Load, deliver, and install a government supplied, 50’ temporary bridge and wooden abutments from Black Mountain storage site off FR 86 to FR 914A Hacking Run Road near Richwood, WV. Bridge shall be set to span stream with final grade of deck set 1 ft – 1.5 ft above the existing road grade on each side of the stream. Installation shall include furnishing materials, equipment, and labor to construct stone (est. of 100 -150 tons of 1 ½” agg.) approaches at each end of structure, blending bridge elevation to existing road elevation.
Bridge weights approx. 30,000 lbs. Project location is on the Monongahela National Forest, WV as follows
Pick-up: 38° 18' 21.568"N 80° 12' 14.516"W
Install: 38° 20' 30.588"N 80° 22' 26.974"W
Attachments
| File | Type | Posted |
|---|---|---|
| 1_FR 914A TEMP BRIDGE_Statement of Work - needs pictures of pick up pt and install pt.pdf | ||
| 4. FR 914A TEMP BRIDGE - SCHEDULE OF ITEMS.pdf | ||
| 12445524Q0072 Clauses.docx | DOCX document | |
| 8. FR 914A Temp Bridge Plans (signed).pdf | ||
| wv80.txt | TXT text file | |
| 12445524Q0072 SF 1442.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity