Mobile Rack Maintenance and inspections
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- W911SD26QA074
- Agency
-
MICC Fort Eustis
Mission and Installation Contracting Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- Not on record
- PSC
- Not on record
- Place of performance
- West Point, New York 10996, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis is seeking qualified vendors to provide maintenance and inspection services for the Mobile Rack System at the United States Military Academy in West Point, New York. This pre-solicitation notice is a sources sought announcement rather than a formal solicitation for quotes, with responses due by April 27, 2026. The contractor must supply all necessary labor, travel, materials, parts, equipment, and supervision to perform quarterly preventive maintenance and inspections, as well as unscheduled repairs to ensure the mobile racking systems remain fully operational and compliant with OSHA standards. Key contract requirements include performing repairs during standard operating hours of 0730-1630 Monday through Friday, providing an inspection checklist for each system, and ensuring all movable units operate at proper load bearing capacities with functional safety features including bumper hardware, operator control panels, and electrical components. The contractor must include industry-standard warranty coverage on all parts and labor, with all typical preventive maintenance parts supplied at no additional cost to the government.
This contract opportunity includes no set-aside designations for small businesses or other special categories. The specific award value and total budget range are not disclosed in this pre-solicitation notice. The contractor must complete all repairs within 5 business days of each quarterly inspection and ensure that all work aligns with the existing preventive maintenance regimen for mobile racking systems. No incumbent contractor information or historical contract values are provided in this sources sought notice. While the exact scope and quantity of mobile rack systems requiring maintenance is not explicitly detailed in the available portion of the notice, the work is limited to Building 917 and must maintain the Cadet Supply Warehouse's standard operating hours without requiring government operational changes.
Notice text
This is a sources sought notice to find capable vendors that can provide maintenance and inspections for the United States Military Academy's Mobile Rack System. This is not a solication for quotes.
1. GENERAL REQUIREMENTS - The contractor shall provide all labor, travel, materials, parts, equipment, and supervision necessary to perform Quarterly Preventive Maintenance and Inspection service and required unscheduled maintenance on the Mobile Racking System located in Building 917, U.S. Military Academy, West Point, N.Y. in accordance with the terms of the contract.
1.1. The contractor shall perform repairs so that the movable racking systems are fully operational and incorporates safety bumper/strike rebound hardware, ground level operator control panels, fully secured junction boxes, flexible conduits and electrical cables to operate all movable units at proper load bearing capacities and speeds, to include mobile travel and safety stops. The contractor shall ensure that the movable racking systems are in full compliance with OSHA.
2. INSPECTION CHECK LIST – Contractor shall provide for information purposes a Mobile Racking System Inspection Checklist for each system.
3. WORK HOURS- Standard operating hours of the Cadet Supply Warehouse is 0730 - 1630, Monday-Friday, excluding Federal holidays. All repairs must be completed during these timeframes and shall not require the government to alter normal operating hours unless specifically requested and/or authorized by the COR in official written correspondence.
4. WARRANTY – Standard Industry warranty or better on all parts and labor shall be included.
5. PREVENTIVE MAINTENANCE INSPECTION - REPAIRS - The contractor shall perform quarterly preventive inspections, repairs and maintenance.
5.1. At no additional cost to the Government, the contractor will provide and install all parts typical with Mobile Racking System Preventive Maintenance regimen.
5.2. If necessary, within 5 business days of completion of each quarterly service, the contractor will provide a written report via official email to the Contract Officer’s Representative (COR) on the systems, to include replacement recommendations of parts that fall out of industry standard Preventive Maintenance that could lead to potential or actual failures. Complete part information is required, including sources, so the government may adjudicate the need for further maintenance.
6. PARTS OBSOLESENCE - The contractor shall notify the COR in the event any part is in jeopardy of becoming obsolete. The contractor shall attempt every reasonable effort and method to source comparable This notification shall be immediate upon the contractor learning of the potential part unavailability.
7. EMERGENCY REPAIRS & REPAIRS IN ADDITION TO QUARTERLY PREVENTATIVE
MAINTENANCE- Unscheduled Repair work to the Mobile Racking systems, if deemed necessary by the government in addition to quarterly preventative maintenance, may only be accomplished under this purchase order when the work does not exceed the amount for the applicable Emergency Repair CLIN(S). Repair work to the Mobile Racking system, if deemed necessary by the government in addition to quarterly preventative maintenance and emergency repair, may only be accomplished under this purchase order after issuance of a signed and funded modification by the Contracting Officer.
8. RESPONSE TIME – IAW PERFORMANCE REQUIREMENTS SUMMARY TABLE
9. APPLICABLE
9.1. Occupational Safety and Health Administration (OSHA) 26 CFR 1910 NYS DOT Manual of Uniform Traffic Control DevicesPERFORMANCE REQUIREMENTS SUMMARY PRS. The rights of the Government and remedies described in this PRS are in addition to other rights andremedies set forth in the contract.
9.2. The Performance Requirements Summary table lists the RequiredServices (RS), the standard of performance by which the Government will measure contractorperformance, the allowable degree of deviation from perfect performance, the primary surveillancemethods the Government will use to evaluate the Contractor’s performance in meeting the contractrequirements, and the method which will be used to determine the amount of deduction from themaximum payment.
9.3. Surveillance Methods. The primary method of surveillance the Government will use to evaluate thecontractor’s performance is provided in the PRS table. The Government is not restricted to using only themethod shown. The Government may supplement and/or modify the primary surveillance method andfrequency of inspections as it deems necessary via the bilateral modification process.
9.4. Valid Customer Complaints. Customer Complaints constitute a surveillance method based on customer awareness and satisfaction and is mainly used to supplement other surveillance methods. Customers familiar with contract requirements notify the Government when there is a case of poor performance or nonperformance. Upon notification, the Government investigates the report and, if valid, documents the performance problem, notifies the contractor and the Contracting Officer.
9.5. Contractor Self-Reporting. The contractor provides a weekly, or as often as necessary, update to the designated government representative on progress made towards meeting the documented maintenance issues.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Mobile Rack Maintenance and inspections | Solicitation | |
| This notice | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity