This solicitation from the Department of the Army Corps of Engineers Engineering District Sacramento seeks a contractor to construct a substation to provide power to two containerized cargo handling gantry cranes at the Military Ocean Terminal Concord in Concord, California. The substation project scope includes installation of transformers, switchgear, circuits, grounding systems, fencing, lighting, and underground conduits. Proposals are due by June 13, 2022 and will be evaluated based on technical qualifications, past performance, and price/cost. An organized site visit will be held on May 10, 2022 for interested parties to become familiar with the project location and requirements.

The opportunity is set aside for total small business and falls under NAICS codes 235930 for marine cargo handling and PSC code Z1 for construction of structures and facilities. The statutory limit for the combined contract value and agency administration is $7.32 million. The disclosure magnitude for this requirement is between $5-10 million. Performance will be at the Military Ocean Terminal Concord in Concord, California.

Notice text

6 versions

Update #6 · Latest ·

Project Description: The scope of the Wharf 2 Substation Project is to construct a substation to provide power to two (2) containerized cargo handling gantry cranes, including a 3750 KVA isolation transformer, 300 KVA step down transformer, grounding, switchgear, circuit breakers, control, low and medium voltage circuits, and ground fault monitoring. Supporting facilities include fencing, bollards, light poles, area receptacles, lightning protection, and grounding grid with bonding to adjacent prominent metal objects and air terminal down-conductors, equipment housekeeping pads, substation concrete pad, and concrete-encased conduit and insulated cables. Minimal Unexploded Ordnance (UXO) monitoring may be necessary. ~~~~~ This project is funded through Unspecified Minor MILCON Construction, Army (UMMCA) which only has the Congressionally mandated statutory limit of $7.32M available to fund both the combined contract value and agency Supervision and Administration (5.7% of the award). Any combined value of bid and Supervision and Administration above this statutory limit is unawardable. ~~~~~ Per FARS 36.204(g) the disclosure of the magnitude for this requirement is between $5M and $10M. ~~~~~ An organized site visits has been scheduled for?10 May 2022 at 10:00A.M. (PDT)Participants will meet at-5110 Port Chicago Hwy, Concord, CA 94520We will meet in the parking lot immediately to the right as you turn off of Port Chicago HWY. Do NOT enter the Entrance Control Point (ECP). USACE Representatives will meet you in the parking lot and guide you through the gate to the project location. The following attachments relevant to the site visit have been included with this posting: Attachment 7 - Site Visit Meet Location, Attachment 8 - NCIC CONSENT FORM, Attachment 9 - NCIC CONSENT FORM INSTRUCTIONS, Attachment 10 - Reasons for Access Denial **NOTE** Interested participates are required to be vetted prior to base access. Escorts for unvetted individuals will NOT be provided. To be vetted, interested participants must complete and return the ?NCIC CONSENT FORM? to the Contract Specialist, Jennifer Wheelis via e-mail, (Jennifer.L.Wheelis@usace.army.mil), no later than 04May2022. Late submission will not be accepted. Individuals will be notified, via e-mail, of their acceptance or denial prior to the site visit. ~~~~~~ PIEE/SAM Amendment 1 Includes Solicitation and all associated Attachments 1-6 not previously posted. ~~~~~~ PIEE/SAM Amendment 2 Includes Documents from site visit conducted 10May2022. Attachment 11 - Site Visit Agenda, Attachment 12 - Site Visit Sign-In Sheet, and Attachment 13 - Site Visit Photos.~~~~~~ PIEE/SAM Amendment 3 Includes: Solicitation Amendment 1 (Revised Period of Performance from 365 days after issuance of Notice to Proceed (NTP) to 548 days after NTP, Revised CLIN Descriptions under Section 00 10 00, and Revised Responses to two (2) Bidder Inquiries, #9744562 and #9744583). Additionally, the following Attachments have been revised: Attachment 3 - Pricing Schedule (revised), Attachment 14 - Sheet E-004 (revised), Attachment 15 - Sheet E-005 (revised), Attachment 16 - Sheet E-008 (revised), Attachment 17 - Sheet E-010 (revised), Attachment 18 - Sheet E-105 (revised). ~~~~~~ PIEE/SAM Amendment 4 Includes: Solicitation Amendment 2 (Extension of proposal due date from 03June2022 ay 10:00PDT to 13June2022 10:00 PDT) ~~~~~~~ PIEE/SAM Amendment 5 includes missed posting of Solicitation Amendment 1 SF30 with PIEE/SAM Amendment posting 3. No changes have been made to the solicitation with this amendment posting. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0033' to obtain more details.*

Update #5 ·

Project Description: The scope of the Wharf 2 Substation Project is to construct a substation to provide power to two (2) containerized cargo handling gantry cranes, including a 3750 KVA isolation transformer, 300 KVA step down transformer, grounding, switchgear, circuit breakers, control, low and medium voltage circuits, and ground fault monitoring. Supporting facilities include fencing, bollards, light poles, area receptacles, lightning protection, and grounding grid with bonding to adjacent prominent metal objects and air terminal down-conductors, equipment housekeeping pads, substation concrete pad, and concrete-encased conduit and insulated cables. Minimal Unexploded Ordnance (UXO) monitoring may be necessary. ~~~~~ This project is funded through Unspecified Minor MILCON Construction, Army (UMMCA) which only has the Congressionally mandated statutory limit of $7.32M available to fund both the combined contract value and agency Supervision and Administration (5.7% of the award). Any combined value of bid and Supervision and Administration above this statutory limit is unawardable. ~~~~~ Per FARS 36.204(g) the disclosure of the magnitude for this requirement is between $5M and $10M. ~~~~~ An organized site visits has been scheduled for?10 May 2022 at 10:00A.M. (PDT)Participants will meet at-5110 Port Chicago Hwy, Concord, CA 94520We will meet in the parking lot immediately to the right as you turn off of Port Chicago HWY. Do NOT enter the Entrance Control Point (ECP). USACE Representatives will meet you in the parking lot and guide you through the gate to the project location. The following attachments relevant to the site visit have been included with this posting: Attachment 7 - Site Visit Meet Location, Attachment 8 - NCIC CONSENT FORM, Attachment 9 - NCIC CONSENT FORM INSTRUCTIONS, Attachment 10 - Reasons for Access Denial **NOTE** Interested participates are required to be vetted prior to base access. Escorts for unvetted individuals will NOT be provided. To be vetted, interested participants must complete and return the ?NCIC CONSENT FORM? to the Contract Specialist, Jennifer Wheelis via e-mail, (Jennifer.L.Wheelis@usace.army.mil), no later than 04May2022. Late submission will not be accepted. Individuals will be notified, via e-mail, of their acceptance or denial prior to the site visit. ~~~~~~ PIEE/SAM Amendment 1 Includes Solicitation and all associated Attachments 1-6 not previously posted. ~~~~~~ PIEE/SAM Amendment 2 Includes Documents from site visit conducted 10May2022. Attachment 11 - Site Visit Agenda, Attachment 12 - Site Visit Sign-In Sheet, and Attachment 13 - Site Visit Photos.~~~~~~ PIEE/SAM Amendment 3 Includes: Solicitation Amendment 1 (Revised Period of Performance from 365 days after issuance of Notice to Proceed (NTP) to 548 days after NTP, Revised CLIN Descriptions under Section 00 10 00, and Revised Responses to two (2) Bidder Inquiries, #9744562 and #9744583). Additionally, the following Attachments have been revised: Attachment 3 - Pricing Schedule (revised), Attachment 14 - Sheet E-004 (revised), Attachment 15 - Sheet E-005 (revised), Attachment 16 - Sheet E-008 (revised), Attachment 17 - Sheet E-010 (revised), Attachment 18 - Sheet E-105 (revised). ~~~~~~ PIEE/SAM Amendment 4 Includes: Solicitation Amendment 2 (Extension of proposal due date from 03June2022 ay 10:00PDT to 13June2022 10:00 PDT) *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0033' to obtain more details.*

Update #4 ·

Project Description: The scope of the Wharf 2 Substation Project is to construct a substation to provide power to two (2) containerized cargo handling gantry cranes, including a 3750 KVA isolation transformer, 300 KVA step down transformer, grounding, switchgear, circuit breakers, control, low and medium voltage circuits, and ground fault monitoring. Supporting facilities include fencing, bollards, light poles, area receptacles, lightning protection, and grounding grid with bonding to adjacent prominent metal objects and air terminal down-conductors, equipment housekeeping pads, substation concrete pad, and concrete-encased conduit and insulated cables. Minimal Unexploded Ordnance (UXO) monitoring may be necessary. ~~~~~ This project is funded through Unspecified Minor MILCON Construction, Army (UMMCA) which only has the Congressionally mandated statutory limit of $7.32M available to fund both the combined contract value and agency Supervision and Administration (5.7% of the award). Any combined value of bid and Supervision and Administration above this statutory limit is unawardable. ~~~~~ Per FARS 36.204(g) the disclosure of the magnitude for this requirement is between $5M and $10M. ~~~~~ An organized site visits has been scheduled for?10 May 2022 at 10:00A.M. (PDT)Participants will meet at-5110 Port Chicago Hwy, Concord, CA 94520We will meet in the parking lot immediately to the right as you turn off of Port Chicago HWY. Do NOT enter the Entrance Control Point (ECP). USACE Representatives will meet you in the parking lot and guide you through the gate to the project location. The following attachments relevant to the site visit have been included with this posting: Attachment 7 - Site Visit Meet Location, Attachment 8 - NCIC CONSENT FORM, Attachment 9 - NCIC CONSENT FORM INSTRUCTIONS, Attachment 10 - Reasons for Access Denial **NOTE** Interested participates are required to be vetted prior to base access. Escorts for unvetted individuals will NOT be provided. To be vetted, interested participants must complete and return the ?NCIC CONSENT FORM? to the Contract Specialist, Jennifer Wheelis via e-mail, (Jennifer.L.Wheelis@usace.army.mil), no later than 04May2022. Late submission will not be accepted. Individuals will be notified, via e-mail, of their acceptance or denial prior to the site visit. ~~~~~~ PIEE/SAM Amendment 1 Includes Solicitation and all associated Attachments 1-6 not previously posted. ~~~~~~ PIEE/SAM Amendment 2 Includes Documents from site visit conducted 10May2022. Attachment 11 - Site Visit Agenda, Attachment 12 - Site Visit Sign-In Sheet, and Attachment 13 - Site Visit Photos.~~~~~~ PIEE/SAM Amendment 3 Includes: Solicitation Amendment 1 (Revised Period of Performance from 365 days after issuance of Notice to Proceed (NTP) to 548 days after NTP, Revised CLIN Descriptions under Section 00 10 00, and Revised Responses to two (2) Bidder Inquiries, #9744562 and #9744583). Additionally, the following Attachments have been revised: Attachment 3 - Pricing Schedule (revised), Attachment 14 - Sheet E-004 (revised), Attachment 15 - Sheet E-005 (revised), Attachment 16 - Sheet E-008 (revised), Attachment 17 - Sheet E-010 (revised), Attachment 18 - Sheet E-105 (revised). *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0033' to obtain more details.*

Update #3 ·

Project Description: The scope of the Wharf 2 Substation Project is to construct a substation to provide power to two (2) containerized cargo handling gantry cranes, including a 3750 KVA isolation transformer, 300 KVA step down transformer, grounding, switchgear, circuit breakers, control, low and medium voltage circuits, and ground fault monitoring. Supporting facilities include fencing, bollards, light poles, area receptacles, lightning protection, and grounding grid with bonding to adjacent prominent metal objects and air terminal down-conductors, equipment housekeeping pads, substation concrete pad, and concrete-encased conduit and insulated cables. Minimal Unexploded Ordnance (UXO) monitoring may be necessary. ~~~~~ This project is funded through Unspecified Minor MILCON Construction, Army (UMMCA) which only has the Congressionally mandated statutory limit of $7.32M available to fund both the combined contract value and agency Supervision and Administration (5.7% of the award). Any combined value of bid and Supervision and Administration above this statutory limit is unawardable. ~~~~~ Per FARS 36.204(g) the disclosure of the magnitude for this requirement is between $5M and $10M. ~~~~~ An organized site visits has been scheduled for?10 May 2022 at 10:00A.M. (PDT)Participants will meet at-5110 Port Chicago Hwy, Concord, CA 94520We will meet in the parking lot immediately to the right as you turn off of Port Chicago HWY. Do NOT enter the Entrance Control Point (ECP). USACE Representatives will meet you in the parking lot and guide you through the gate to the project location. The following attachments relevant to the site visit have been included with this posting: Attachment 7 - Site Visit Meet Location, Attachment 8 - NCIC CONSENT FORM, Attachment 9 - NCIC CONSENT FORM INSTRUCTIONS, Attachment 10 - Reasons for Access Denial **NOTE** Interested participates are required to be vetted prior to base access. Escorts for unvetted individuals will NOT be provided. To be vetted, interested participants must complete and return the ?NCIC CONSENT FORM? to the Contract Specialist, Jennifer Wheelis via e-mail, (Jennifer.L.Wheelis@usace.army.mil), no later than 04May2022. Late submission will not be accepted. Individuals will be notified, via e-mail, of their acceptance or denial prior to the site visit. ~~~~~~ PIEE/SAM Amendment 1 Includes Solicitation and all associated Attachments 1-6 not previously posted. ~~~~~~ PIEE/SAM Amendment 2 Includes Documents from site visit conducted 10May2022. Attachment 11 - Site Visit Agenda, Attachment 12 - Site Visit Sign-In Sheet, and Attachment 13 - Site Visit Photos. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0033' to obtain more details.*

Update #2 ·

Project Description: The scope of the Wharf 2 Substation Project is to construct a substation to provide power to two (2) containerized cargo handling gantry cranes, including a 3750 KVA isolation transformer, 300 KVA step down transformer, grounding, switchgear, circuit breakers, control, low and medium voltage circuits, and ground fault monitoring. Supporting facilities include fencing, bollards, light poles, area receptacles, lightning protection, and grounding grid with bonding to adjacent prominent metal objects and air terminal down-conductors, equipment housekeeping pads, substation concrete pad, and concrete-encased conduit and insulated cables. Minimal Unexploded Ordnance (UXO) monitoring may be necessary. ~~~~~ This project is funded through Unspecified Minor MILCON Construction, Army (UMMCA) which only has the Congressionally mandated statutory limit of $7.32M available to fund both the combined contract value and agency Supervision and Administration (5.7% of the award). Any combined value of bid and Supervision and Administration above this statutory limit is unawardable. ~~~~~ Per FARS 36.204(g) the disclosure of the magnitude for this requirement is between $5M and $10M. ~~~~~ An organized site visits has been scheduled for?10 May 2022 at 10:00A.M. (PDT)Participants will meet at-5110 Port Chicago Hwy, Concord, CA 94520We will meet in the parking lot immediately to the right as you turn off of Port Chicago HWY. Do NOT enter the Entrance Control Point (ECP). USACE Representatives will meet you in the parking lot and guide you through the gate to the project location. The following attachments relevant to the site visit have been included with this posting: Attachment 7 - Site Visit Meet Location, Attachment 8 - NCIC CONSENT FORM, Attachment 9 - NCIC CONSENT FORM INSTRUCTIONS, Attachment 10 - Reasons for Access Denial **NOTE** Interested participates are required to be vetted prior to base access. Escorts for unvetted individuals will NOT be provided. To be vetted, interested participants must complete and return the ?NCIC CONSENT FORM? to the Contract Specialist, Jennifer Wheelis via e-mail, (Jennifer.L.Wheelis@usace.army.mil), no later than 04May2022. Late submission will not be accepted. Individuals will be notified, via e-mail, of their acceptance or denial prior to the site visit. ~~~~~~ PIEE/SAM Amendment 1 Includes Solicitation and all associated Attachments 1-6 not previously posted. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0033' to obtain more details.*

Update #1 ·

Project Description: The scope of the Wharf 2 Substation Project is to construct a substation to provide power to two (2) containerized cargo handling gantry cranes, including a 3750 KVA isolation transformer, 300 KVA step down transformer, grounding, switchgear, circuit breakers, control, low and medium voltage circuits, and ground fault monitoring. Supporting facilities include fencing, bollards, light poles, area receptacles, lightning protection, and grounding grid with bonding to adjacent prominent metal objects and air terminal down-conductors, equipment housekeeping pads, substation concrete pad, and concrete-encased conduit and insulated cables. Minimal Unexploded Ordnance (UXO) monitoring may be necessary. This project is funded through Unspecified Minor MILCON Construction, Army (UMMCA) which only has the Congressionally mandated statutory limit of $7.32M available to fund both the combined contract value and agency Supervision and Administration (5.7% of the award). Any combined value of bid and Supervision and Administration above this statutory limit is unawardable. Per FARS 36.204(g) the disclosure of the magnitude for this requirement is between $5M and $10M.Solicitation is not available with this posting but is expected to be posted on, or before, 03May2022. An organized site visits has been scheduled for?10 May 2022 at 10:00A.M. (PDT)Participants will meet at-5110 Port Chicago Hwy, Concord, CA 94520We will meet in the parking lot immediately to the right as you turn off of Port Chicago HWY. Do NOT enter the Entrance Control Point (ECP). USACE Representatives will meet you in the parking lot and guide you through the gate to the project location. The following attachments relevant to the site visit have been included with this posting: Attachment 7 - Site Visit Meet Location, Attachment 8 - NCIC CONSENT FORM, Attachment 9 - NCIC CONSENT FORM INSTRUCTIONS, Attachment 10 - Reasons for Access Denial **NOTE** Interested participates are required to be vetted prior to base access. Escorts for unvetted individuals will NOT be provided. To be vetted, interested participants must complete and return the ?NCIC CONSENT FORM? to the Contract Specialist, Jennifer Wheelis via e-mail, (Jennifer.L.Wheelis@usace.army.mi), no later than 04May2022. Late submission will not be accepted. Individuals will be notified, via e-mail, of their acceptance or denial prior to the site visit. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123822R0033' to obtain more details.*

Notice history

Notice Type Posted
Military Ocean Terminal Concord (MOTCO) Wharf 2 Substation Award Award Notice
This notice Latest solicitation Solicitation
USACE SPK DBB Construction - Military Ocean Terminal Concord (MOTCO) Wharf 2 Substation – Concord, California Pre-Solicitation
Military Ocean Terminal Concord (MOTCO) Wharf 2 Substation Original Pre-Solicitation