Notice text
9 versions
Update #9 · Latest ·
AMENDMENT 08
16 JULY 2019
THE PURPOSE OF AMENDMENT 08 IS TO:
(a) Provide Questions and Answers #19 - #27
(b) Provide Follow-up Information for Questions #19 - #27
19. Question: Are these parts going to require anodes?
Answer: We suspect part #4 of Appendix 7.1 will require an anode
20. Question: Are these parts going to be racked in vertical or horizontal position?
Answer: Horizontal rack with slight downward angle would prevent drag-out
21. Question: Where and how can we hold these parts, inside or outside?
Answer: Parts may be held by the internal ID of the small hole end.
22. Question: What is the distance between the anodes?
Answer: Unknown at this time. To Be Determined by the awardee. Performance Work Statement (PWS) 3.3 states "Contractor shall verify their design is capable of achieving the estimated required loads per shift based on the expected cycle time". PWS 4.3 states "A Suggested/Sample Tank Schedule is included in Appendix 7.3 which provides the requirements for each station. It should be noted that the tank size information included in the Tank Schedule is based on preliminary sizing. Size the equipment in accordance with calculations based on the performance requirements listed in Section 3". PWS 4.4 states "The following conceptual design drawings are included in the Appendix 7.4 & 7.5".
23. Question: What is the working envelope?
Answer: Unknown at this time. To Be Determined by the awardee.
24. Question: What is the solution level going to be?
Answer: Unknown at this time. To Be Determined by the awardee.
25. Question: Is there only one part for anodizing 5.035 dia x 4.12" long?
Answer: We do not currently offer part anodizing. Correct, see Appendix 7.1.
26. Question: We need parts to fabricate racks.
Answer: Part pictures have been provided. Sample parts and prints will be provided upon award.
27. Question: We need prints to quote.
Answer: Part pictures have been provided. Sample parts and prints will be provided upon award.
Follow-up Information for Questions #19 - #27
The parts listed within the PWS are reference parts which are most commonly processed with our current facility. The plating line will have the capability of processing the listed parts, and have the ability of plating future unknown parts. The Army machine shop and plating facility operate as a job shop producing and plating a very wide variety of parts. We desire the flexibility to process a wide range of parts.
The equipment components consisted within the plating process should be quoted as "multi-purpose" and not necessarily fixated and perfected to parts within the PWS. Per PWS 3.1, "required design capacity...", we are interested in the "capacity" of the plating line to function with the parts listed in 7.1. After award, commonly plated parts will be provided for application of best fit options. Per PWS Appendix 7.1, finishing line table: line capacities are listed. See design schedule within PWS paragraph 8.5.2, & 10.
PWS 3.4 states, "Size all ancillary utilities within the identified scope of supply, rectifiers, chillers, heating requirements, scrubber components, and waste water treatment components based upon the CAPACITY of the plating lines."
We are most interested in the surface area capabilities within a 10 Hr. shift and multi-purpose abilities of the plating line based on capacity.
We understand the complexity and geometry factor of parts, and therefore perfected systems will not be required for initial design proposal. After award, the Government will supply the awardee with parts and prints to allow the awardee to further develop and finalize design in accordance with the design schedule (PWS paragraph 10) from 50% - 100% design within 90 days after award.
.
Update #8 ·
AMENDMENT 07
15 JULY 2019
THE PURPOSE OF AMENDMENT 07 IS TO:
(a) Provide Questions and Answers #14 - #18
(b) Provide Photos of parts identified within Appendix 7.1, at Attachment 12
(c) Provide Revised Appendices 7.2.1; 7.2.2; and 7.2.3, at Attachment 13.
These appendices replace the corresponding Appendices at Attachment 02.
(d) Extend the Response date/time to 22 July 2019, not later than 12:00 p.m. Central
14. Question: Is there an estimate of chemical solution drag out (ml/load/hr) for the non-ferrous, ferrous and copper/brass/brightening process?
Answer: No data that Crane has, would be comparable. As stated within the Performance Work Statement (PWS) 5.4.2, "Design will minimize loss through drag-out and extend the life of chemical solutions".
That might include some or all of the following:
• Barrels with tapered holes (bigger on outside), holes as large as possible, slotted holes
• Proper design/use of drip trays
• Optimize part withdrawal rate
• Dwell time before rinsing
• Optimum racking & part geometry
• Sprays rinse over chemical tanks
• Air knives
• Ion exchange on rinse tanks
• Multiple use rinsing
• Reactive rinsing
• Proprietary plating barrels
15. Question: Is there a profile of the waste contamination load for the paint strip operation?
Answer: There is currently no paint strip operation and thus no profile.
16. Question: Is a spent chemical dumps schedule for the finishing lines available?
Answer: No data that Crane has would be comparable. As stated within the PWS 5.4.2 "Design will minimize loss through drag-out and extend the life of chemical solutions."
17. Question: Please define low and high TDS rise water solutions. What is the conductivity of each?
Answer: We desire a system that uses best operating practices for pollution prevention in the plating process with considerations of water conservations while maintaining the discharge limitations of Appendix 7.7. Section 1.3 of the PWS states: "Source elimination, reduction, recycling, treatment and disposal conservation efforts shall be used, refer to Executive Order 13693..."
18. Question: What is the influent TOC of the low TOC and high TOC rise waters to the IX and WWTS?
Answer: We desire a system that uses the best operating practices for pollution prevention in the plating process with considerations of water conservations while maintaining the discharge limitations of Appendix 7.7. Section 1.3 of the PWS states: "Source elimination, reduction, recycling, treatment and disposal conservation efforts shall be used, refer to Executive Order 13693..."
.
Update #7 ·
AMENDMENT 06
12 JULY 2019
THE PURPOSE OF AMENDMENT 06 IS TO PROVIDE:
(a) Question and Answer #13
(b) Revised Performance Work Statement (PWS) dated 11 July 2019 at Attachment 11. The PWS at Attachment 11 revises language in paragraph 5.1.4.1 in accordance with Question & Answer #13, and replaces the PWS dated 18 April 2019 at Attachment 01.
13. Question: How many racks for the anodize line vs. ferrous line?
Answer: Paragraph 5.1.4.1 of the PWS at Attachment 01 requires racks be provided. After further consideration, racks are not required. Flight bars are required. The revised PWS at Attachment 11 reflects this change. Racks are not a part of this solicitation, but will be designed and implemented at a later date.
.
Update #6 ·
AMENDMENT 05
9 JULY 2019
THE PURPOSE OF AMENDMENT 05 IS TO PROVIDE QUESTIONS & ANSWERS #11 AND #12
11. Question: What amperages are the rectifiers? Appendix 7.3 only shows max volts.
Answer: We believe there is enough information in the Performance Work Statement Appendix 7.1 to make the determination on part requirements for voltage and current. Attachment 7.3 voltage is reflective of the max voltage we are using now, but may change if a contractor proposes a method of constant current instead.
12. Question: What is the operating temperature for the following tanks?
Answer: Operating temperatures are in bold, next to each listed tank.
T-IR3, Chromate Conversion (75° - 120° f)
T-IR32, Chromate Conversion Rinse (.
Update #5 ·
AMENDMENT 04
3 JULY 2019
THE PURPOSE OF AMENDMENT 04 IS TO PROVIDE QUESTIONS AND ANSWERS ON APPENDICES 7.2.1, 7.2.2, AND 7.2.3 AT ATTACHMENT 10
Note: Questions are numbered on each Appendix.
Answers are in red at the top-right of each Appendix..
Update #4 ·
AMENDMENT 03
2 JULY 2019
THE PURPOSE OF AMENDMENT 03 IS TO: PROVIDE PICTURES AT ATTACHMENT 09; AND PROVIDE QUESTION & ANSWERS #5 THRU #10.
5. Question: Can we get a set of raw parts in order to build racks and determine whether the parts should be racked or barrel?
Answer: No. We believe there is enough information in the Performance Work Statement to make that determination.
6. Question: Can you provide all related MIL, ASTM, and TT-C specifications outlined in Section 1.6.1 thru 1.6.9?
Answer: No, we will not be providing them, as they are publicly available.
7. Question: What is the voltage and phase that the electric immersion heaters operate? 480 volt 3 phase?
Answer: This can vary based upon the manufacturer.
8. Question: Can you provide a picture of the face plate of the Clinton rectifiers?
Answer: Pictures are at Attachment 09.
9. Question: What is the desired DC amperage for the ferrous and non-ferrous lines?
Answer: The desired DC amperage for the ferrous and non-ferrous lines is 480 volt three phase rectifiers.
Ferrous: Current and voltage to be calculated per appendix 7.1.
Non-Ferrous: Current and voltage to be calculated per appendix 7.1
10. Question: Are the Clinton rectifiers PLC compatible?
Answer: No, the rectifiers are not PLC compatible.
.
Update #3 ·
AMENDMENT 02
27 JUNE 2019
THE PURPOSE OF AMENDMENT 02 IS TO:
1. Extend the Response Date/Time to 12:00 p.m. Central, 19 July 2019.
2. Add the following language to this solicitation: Questions must be submitted, in accordance with the solicitation, no later than 12:00 p.m. Central on 10 July 2019..
Update #2 ·
AMENDMENT 01
20 JUNE 2019
THE PURPOSE OF THIS AMENDMENT IS TO:
PROVIDE BUILDING FLOOR PLAN AT ATTACHMENT 08; AND
PROVIDE QUESTION & ANSWERS #1 THRU #4
1. Question: Who are the manufacturing engineers located at Crane Indiana?
Answer: That information will not be provided. All questions must be submitted to lorraine.geren.civ@mail.mil and cindy.k.wagoner.civ@mail.mil in accordance with the solicitation.
2. Question: Can you provide AUTO CAD drawing of the building that is being built?
Answer: The Flooring Plan is at Attachment 08.
3. Question: Will the building floor be finished prior to the award of the contract?
Answer: Yes. We anticipate the entire building will be substantially complete at the time the equipment is installed, only pending final test and balance with the facility's HVAC system. Note that in the Floor Layout Plans, there is a fiberglass grating over portions of the building near the equipment that the equipment load cannot bear on.
4. Question: Can you extend the Response Date by 2 weeks?
Answer: No.
.
Update #1 ·
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will NOT be issued.
This is a Request for Proposal (RFP) using FAR Part 12, Acquisition of Commercial Items; the Solicitation number is W52P1J-19-T-PL12.
The solicitation and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2019-02.
The NAICS code for this procurement is 333249; the small business size standard is 500 employees. The Federal Supply Code is 3426. This solicitation is issued as a 100% Small Business Set-Aside.
Offerors must be actively registered within the System for Award Management (SAM) database at the date of proposal submission, in order to be considered for award. The website for SAM is https://www.sam.gov/.
NOTICE OF ORGANIZATIONAL CONFLICT OF INTEREST
The Performance Work Statement for this solicitation includes Appendices items which were prepared by Middough, Inc., 700 Commerce Drive Suite 200, Oak Brook, IL 60523-1702, under a previous contract. In accordance with FAR 9.505-1, if a contractor provides systems engineering to be used in a competitive acquisition, that contractor may not be awarded a contract to supply the system or any of its major components; or be a subcontractor or consultant to a supplier of the system or any of its major components. To allow Middough, Inc. to submit a proposal for this requirement, either as a prime contractor, subcontractor, or teaming partner, or to be a consultant to a prime contractor, subcontractor or teaming partner, could provide that offeror an unfair competitive advantage. Therefore, in order to avoid this organizational conflict of interest, Middough, Inc. is hereby prohibited from participating in this solicitation as a prime contractor, subcontractor, team member or partner with any other offeror. Middough is further prohibited from acting as a consultant to any supplier of the system or any of its major components. All offerors are hereby prohibited from submitting any offer under this solicitation which includes Middough, Inc. as a subcontractor, team member, or partner; or that included Middough as a consultant. Any offer which includes Middough, Inc. in any of the above-referenced capacities will be rejected as unacceptable.
DESCRIPTION OF REQUIREMENT
This solicitation is for design, fabrication, supply, and installation of a metal finishing process in accordance with the Performance Work Statement (PWS) at Attachment 01, and the associated Appendices at Attachment 02. Installation will be at Crane Army Ammunition Activity, Crane IN.
The Contract Line Item Number (CLIN) Structure is defined as follows:
CLIN 0001 - Drawings (All drawing submissions, as specified within the PWS)
CLIN 0002 - Equipment (All equipment, as specified within the PWS)
CLIN 0003 - Installation and Validation (As specified within the PWS)
CLIN 0004 - Training and Manuals (Training and Manuals, as specified within the PWS)
DELIVERY DATES AND FOB POINT
CLIN 0001 - Delivery date of final 100% design (Final Design) is 90 days after award
CLIN 0002 - Delivery of all equipment is 03/09/2020
CLIN 0003 - Installation & Validation completion date is 05/18/2020
CLIN 0004 - Delivery date is 06/15/2020
Delivery is FOB Destination (Crane Army Ammunition Activity, Crane IN)
TYPE OF ACQUISITION AND CONTRACT
This acquisition is issued as a 100% Small Business Set-Aside. Award will be made using Best Value Source Selection procedures, resulting in a single award Firm Fixed Price contract.
INSURANCE REQUIREMENT
The metal finishing system will be installed at Crane Army Ammunition Activity, Crane IN, a Government Installation. FAR Clause 52.228-5, Insurance-Work on Government Installation applies, as noted within the "Clause" Section below. The amount of insurance required is as specified within FAR 28.307-2.
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
• See Attachment 05 - Instructions, Conditions, and Notices to Offerors
EVALUATION FACTORS FOR AWARD
• See Attachment 06 - Evaluation Factors for Award
LISTING OF ATTACHMENTS
Attachment 01, Performance Work Statement (PWS) dated 10 April 2019
Attachment 02, PWS Appendices
Attachment 03, Pricing Matrix
Attachment 04, FAR Clause 52.209-7 and FAR Clause 52.212-3
Attachment 05, Instructions, Conditions, and Notices to Offerors
Attachment 06, Evaluation Factors for Award
Attachment 07, Past Performance Questionnaire
CLAUSES
The following Federal Acquisition Regulation (FAR) commercial clauses apply to this solicitation (clauses may be obtained via the internet at http://farsite.hill.af.mil):
FAR 52.212-1, Instructions to Offerors-Commercial Items
FAR 52.212-3, Alt I, Offeror Representations and Certifications-Commercial Items Alternate I
FAR 52.212-4, Contract Terms and Conditions-Commercial Items
FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Items.
Within FAR 52.212-5, the following optional clauses apply:
FAR 52.203-6, Restrictions on Subcontractor Sales to the Government
FAR 52.203-13, Contractor Code of Business Ethics and Conduct
FAR 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards
FAR 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment
FAR 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters
FAR 52.219-6, Notice of Total Small Business Set Aside
FAR 52.219-8, Utilization of Small Business Concerns
FAR 52.219-14, Limitations on Subcontracting
FAR 52.219-28, Post Award Small Business Program Representation
FAR 52.222-3, Convict Labor
FAR 52.222-19, Child Labor-Cooperation with Authorities and Remedies
FAR 52.222-21, Prohibition of Segregated Facilities
FAR 52.222-26, Equal Opportunity
FAR 52.222-35, Equal Opportunity for Veterans
FAR 52.222-36, Equal Opportunity for Workers with Disabilities
FAR 52.222-37, Employment Reports on Veterans
FAR 52.222-40, Notification of Employee Rights Under the National Labor Relations Act
FAR 52.222-50, Combatting Trafficking in Persons
FAR 52.223-18, Encouraging Contractor Policies to Ban Text messaging While Driving
FAR 52.225-13, Restrictions on Certain Foreign Purchases
FAR 52.232-33, Payment by Electronic Funds Transfer-Central Contractor Registration
FAR 52.242-5, Payments to Small Business Subcontractors
FAR 52.203-3, Gratuities
FAR 52.204-7, System for Award Management
FAR 52.204-13, System for Award Management Maintenance
FAR 52.204-16, Commercial and Government Entity Code Reporting
FAR 52.204-18, Commercial and Government Entity Code Maintenance
FAR 52.209-7, Information Regarding Responsibility Matters
FAR 52.209-12, Certification Regarding Tax Matters
FAR 52.228-5, Insurance-Work on Government Installation
FAR 52.232-40, Providing Accelerated Payments to Small Business Subcontractors
FAR 52.247-34, FOB Destination
DFARS 252.203-7000, Requirements Relating to Compensation of Former DoD Officials
DFARS 252.203-7003, Agency Office of the Inspector General
DFARS 252.203-7005, Representation Relating to Compensation of Former DoD Officials
DFARS 252.204-7008, Compliance with Safeguarding Covered Defense Information Controls
DFARS 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting
DFARS 252.204-7015, Notice of Authorized Disclosure of Information for Litigation Support
DFARS 252.205-7000, Provision of Information to Cooperative Agreement Holders
DFARS 252.211-7003, Item Unique Identification and Valuation
DFARS 252.223-7008, Prohibition of Hexavalent Chromium
DFARS 252.225-7001, Buy American and Balance of Payments Program - Basic
DFARS 252.225-7002, Qualifying Country Sources as Subcontractors
DFARS 252.225-7012, Preference for Certain Domestic Commodities
DFARS 252.226-7001, Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns
DFARS 252.227-7015, Technical Data-Commercial Items
DFARS 252.227-7037, Validation of Restrictive Markings on Technical Data
DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports
DFARS 252.232-7006, Wide Area WorkFlow Payment Instructions
DFARS 252.232-7010, Levies on Contract Payments
DFARS 252.243-7002, Requests for Equitable Adjustment
DFARS 252.244-7000, Subcontracts for Commercial Items
DFARS 252.246-7008, Sources of Electronic Parts
DFARS 252.247-7023, Transportation of Supplies by Sea
DFARS 252.225-7052, Restriction on Acquisition of Certain Magnets and Tungsten
DEADLINE FOR PROPOSAL SUBMISSION
Offers are due on Monday, 08 July 2019, not later than 12:00 p.m. Central Time.
Offers shall be submitted in the following way:
Electronically via email to the Contract Specialist lorraine.geren.civ@mail.mil and the Contracting Officer cindy.k.wagoner.civ@mail.mil Offerors should include "Response to W52P1J-19-T-PL12" within the Subject line.
QUESTIONS
Questions shall be submitted in the same manner as Offers, electronically via email to the Contract Specialist and the Contracting Officer.
**Note: Interested offerors must submit any questions concerning this solicitation at the earliest time possible, to enable the Buyer to respond. Questions not received within a reasonable time prior to close of the solicitation may not be considered.
.
Attachments
Show all 26
Notice history
| Notice | Type | Posted |
|---|---|---|
| Metal Finishing Process | Award Notice | |
| Amendment 08 | Solicitation | |
| Plating System | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity