McNary Dam NavLock Upstream Unwater Sump System Upgrade

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912EF20B0017
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Umatilla OR 97882 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks a firm fixed-price construction contract to upgrade the upstream unwatering sump system at McNary Lock and Dam in Umatilla, Oregon. The U.S. Army Corps of Engineers, Walla Walla District will replace pumps, reroute piping, and install an elevated floor in the navigation lock pump room. Offerors must develop safety, quality control, and project closeout plans using the Corps' management software. Questions are due by specified dates in amendments one and two, with proposals due as outlined in solicitation W912EF20B0017.

The contract action is set aside for small businesses with a NAICS code of 237990, Specialty Trade Contractors, with a size standard of $39.5 million. The work includes replacing one unwatering pump, three drainage pumps, and approximately 300 feet of 10-inch diameter outlet piping. The project value is estimated between $1 million to $5 million to be completed at McNary Lock and Dam in Umatilla, Oregon. A mandatory pre-bid site visit was held on specified dates with COVID-19 screening required.

Notice text

6 versions

Update #6 · Latest ·

9/8/2020: Bid Opening Results attached

______________________________________________________________________________________

9/2/2020: Solicitation amendment 20B0017-0003 added with updated technical specifications and plans.  See attached amendment to this opportunity.

_______________________________________________________________________________________

8/28/2020: Solicitation Amendment 20B0017-00002 added to extend bid submission from 8/31/2020 to 9/8/2020. See attached amendment to this opportunity.

_______________________________________________________________________________________________

8/17/2020:  Site visit Attendee list from 8/12/2020 added as an attachement.

___________________________________________________________________________

8/7/2020: Solcitation Amendment W912EF20B0017-0001  which provides additional site visit instruction/information. See attached W912EF20B0017-0001 for details. ___________________________________________________________________________

Construction project entitled: McNary Dam NavLock Upstream Unwater Sump System Upgrade

The work is located at the McNary Dam, Umatilla, Oregon.  This will be a firm fixed-price construction contract. Construction magnitude is estimated between $1,000,000 and $5,000,000.  100% performance and payment bonds will be required.  The North American Industry Classification System (NAICS) code for this project is 237990 and the associated small business size standard is $39.5 M. 

Competition for this solicitation is set-aside for small business concerns.  Solicitation number W912EF20B0017 is attached to this post with technical specifications and associated plans. The proposal due date is contained in the solicitation.

Scope of Work

McNary Lock and Dam (McNary) is located on the Columbia River, near the town of Umatilla, Oregon.  The navigation lock is a critical piece of the infrastructure for river travel on the upper Columbia River and the Snake River.  The McNary navigation lock allows for passage of over 5 million tons of commodities on a yearly basis, raising transiting river traffic an average of 75 feet to Lake Wallula.  The navigation lock has been in service since 1954.

McNary has two pump rooms in the navigation lock (navlock), one at the downstream and one at the upstream ends of the navlock.  Each pump room is designed to handle both unwatering of the lock fill/empty culverts, and drainage from gallery leakage. The proposed project will replace one unwatering pump (approx. 50 HP,  1200 GPM) pump and three drainage pumps (approx. 7.5 HP, 250 GPM), along with re-routing inlet piping and outlet pumping (outlet pipe approx. 300 feet of 10-inch dia steel pipe).  Temporary Power and/or motor control centers maybe required for commissioning the new pumps. The project will also include an elevated structural floor (approx. 2 feet above existing concrete floor, and 250 square feet).  The pump room is located in the lower gallery of the NavLock , elev 241 (the top deck is at elev 361).  Access to the pump room is limited to a stairwell and vertical elevator shaft.  The freight elevator is not functional but the shaft can be used to lower supplies and materials.  Electrical controls and power to the pumps will be done by others and is not part of this contract

All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).

The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance.  In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1. 

A Site Safety and Health Officer (SSHO) employed by the prime contractor shall be required for each shift of the contractor’s on-site operations.  The SSHO shall possess a minimum of 5-years’ experience in construction safety on similar projects, shall have completed the 30-Hour OSHA Construction Safety training within the last 5-years, and shall have completed at least 24-hours of formal safety training each year for the past 5-years.

The Contractor will be responsible for establishing and managing an effective Contractor Quality Control (CQC) System that will require the development and submission of a comprehensive project specific CQC Plan for Government acceptance.  A CQC System Manager employed by the prime contractor shall be required to be on-site for each shift of the Contractor’s operations.  The CQC System Manager must possess a minimum of 5-years relevant experience in a supervisory or management position such as Quality Control Manager, Quality Assurance Manager, or Construction Manager directly involved in the management of construction quality at the project site.  In addition, the CQC System Manager shall have completed the course entitled “Construction Quality Management for Contractors” within the last 5-years.    

The Contractor will be required to use the Government-furnished Construction Contractor Module (referred to as QCS) of the Resident Management System (RMS) to record, maintain, and submit various information throughout the contract period.  QCS is a Windows-based program that can be run on a stand-alone personal computer or on a network.  The Government will make the QCS software available to the Contractor after contract award.

The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract.

Miscellaneous work within the project includes the delivery of As-Built Drawings.

Solicitation Number W912EF20B0017 will be posted to the beta.sam.gov in approximately on or around early July 2020. The solicitation is an Invitation for bid (IFB). Important Note:  The beta.sam.gov Contract Opportunities Response Date listed elsewhere in this synopsis is for beta.sam.gov archive purposes only.  It does not necessarily reflect the actual bid opening date.  There is no response date included in this notice. The bid due date and time will be contained in the solicitation and any solicitation amendments that are issued.

A site visit details are included in the solicitation and other instructions for attendee sign up to attend.  See solicitation for specific details about the site visit. ACCESS FOR FOREIGN NATIONALS: Security clearance for foreign nationals to attend a site visit requires approximately 4 weeks; therefore, clearance should be requested immediately.

To request clearance, please submit the names of all foreign nationals proposed for site visit attendance, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph (INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B). Send this information by email to leanne.r.walling@usace.army.mil.  Foreign nationals must have received clearance prior to being granted access to the project site.

Update #5 ·

9/2/2020: Solicitation amendment 20B0017-0003 added with updated technical specifications and plans.  See attached amendment to this opportunity.

_______________________________________________________________________________________

8/28/2020: Solicitation Amendment 20B0017-00002 added to extend bid submission from 8/31/2020 to 9/8/2020. See attached amendment to this opportunity.

_______________________________________________________________________________________________

8/17/2020:  Site visit Attendee list from 8/12/2020 added as an attachement.

___________________________________________________________________________

8/7/2020: Solcitation Amendment W912EF20B0017-0001  which provides additional site visit instruction/information. See attached W912EF20B0017-0001 for details. ___________________________________________________________________________

Construction project entitled: McNary Dam NavLock Upstream Unwater Sump System Upgrade

The work is located at the McNary Dam, Umatilla, Oregon.  This will be a firm fixed-price construction contract. Construction magnitude is estimated between $1,000,000 and $5,000,000.  100% performance and payment bonds will be required.  The North American Industry Classification System (NAICS) code for this project is 237990 and the associated small business size standard is $39.5 M. 

Competition for this solicitation is set-aside for small business concerns.  Solicitation number W912EF20B0017 is attached to this post with technical specifications and associated plans. The proposal due date is contained in the solicitation.

Scope of Work

McNary Lock and Dam (McNary) is located on the Columbia River, near the town of Umatilla, Oregon.  The navigation lock is a critical piece of the infrastructure for river travel on the upper Columbia River and the Snake River.  The McNary navigation lock allows for passage of over 5 million tons of commodities on a yearly basis, raising transiting river traffic an average of 75 feet to Lake Wallula.  The navigation lock has been in service since 1954.

McNary has two pump rooms in the navigation lock (navlock), one at the downstream and one at the upstream ends of the navlock.  Each pump room is designed to handle both unwatering of the lock fill/empty culverts, and drainage from gallery leakage. The proposed project will replace one unwatering pump (approx. 50 HP,  1200 GPM) pump and three drainage pumps (approx. 7.5 HP, 250 GPM), along with re-routing inlet piping and outlet pumping (outlet pipe approx. 300 feet of 10-inch dia steel pipe).  Temporary Power and/or motor control centers maybe required for commissioning the new pumps. The project will also include an elevated structural floor (approx. 2 feet above existing concrete floor, and 250 square feet).  The pump room is located in the lower gallery of the NavLock , elev 241 (the top deck is at elev 361).  Access to the pump room is limited to a stairwell and vertical elevator shaft.  The freight elevator is not functional but the shaft can be used to lower supplies and materials.  Electrical controls and power to the pumps will be done by others and is not part of this contract

All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).

The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance.  In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1. 

A Site Safety and Health Officer (SSHO) employed by the prime contractor shall be required for each shift of the contractor’s on-site operations.  The SSHO shall possess a minimum of 5-years’ experience in construction safety on similar projects, shall have completed the 30-Hour OSHA Construction Safety training within the last 5-years, and shall have completed at least 24-hours of formal safety training each year for the past 5-years.

The Contractor will be responsible for establishing and managing an effective Contractor Quality Control (CQC) System that will require the development and submission of a comprehensive project specific CQC Plan for Government acceptance.  A CQC System Manager employed by the prime contractor shall be required to be on-site for each shift of the Contractor’s operations.  The CQC System Manager must possess a minimum of 5-years relevant experience in a supervisory or management position such as Quality Control Manager, Quality Assurance Manager, or Construction Manager directly involved in the management of construction quality at the project site.  In addition, the CQC System Manager shall have completed the course entitled “Construction Quality Management for Contractors” within the last 5-years.    

The Contractor will be required to use the Government-furnished Construction Contractor Module (referred to as QCS) of the Resident Management System (RMS) to record, maintain, and submit various information throughout the contract period.  QCS is a Windows-based program that can be run on a stand-alone personal computer or on a network.  The Government will make the QCS software available to the Contractor after contract award.

The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract.

Miscellaneous work within the project includes the delivery of As-Built Drawings.

Solicitation Number W912EF20B0017 will be posted to the beta.sam.gov in approximately on or around early July 2020. The solicitation is an Invitation for bid (IFB). Important Note:  The beta.sam.gov Contract Opportunities Response Date listed elsewhere in this synopsis is for beta.sam.gov archive purposes only.  It does not necessarily reflect the actual bid opening date.  There is no response date included in this notice. The bid due date and time will be contained in the solicitation and any solicitation amendments that are issued.

A site visit details are included in the solicitation and other instructions for attendee sign up to attend.  See solicitation for specific details about the site visit. ACCESS FOR FOREIGN NATIONALS: Security clearance for foreign nationals to attend a site visit requires approximately 4 weeks; therefore, clearance should be requested immediately.

To request clearance, please submit the names of all foreign nationals proposed for site visit attendance, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph (INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B). Send this information by email to leanne.r.walling@usace.army.mil.  Foreign nationals must have received clearance prior to being granted access to the project site.

Update #4 ·

8/28/2020: Solicitation Amendment 20B0017-00002 added to extend bid submission from 8/31/2020 to 9/8/2020. See attached amendment to this opportunity.

_______________________________________________________________________________________________

8/17/2020:  Site visit Attendee list from 8/12/2020 added as an attachement.

___________________________________________________________________________

8/7/2020: Solcitation Amendment W912EF20B0017-0001  which provides additional site visit instruction/information. See attached W912EF20B0017-0001 for details. ___________________________________________________________________________

Construction project entitled: McNary Dam NavLock Upstream Unwater Sump System Upgrade

The work is located at the McNary Dam, Umatilla, Oregon.  This will be a firm fixed-price construction contract. Construction magnitude is estimated between $1,000,000 and $5,000,000.  100% performance and payment bonds will be required.  The North American Industry Classification System (NAICS) code for this project is 237990 and the associated small business size standard is $39.5 M. 

Competition for this solicitation is set-aside for small business concerns.  Solicitation number W912EF20B0017 is attached to this post with technical specifications and associated plans. The proposal due date is contained in the solicitation.

Scope of Work

McNary Lock and Dam (McNary) is located on the Columbia River, near the town of Umatilla, Oregon.  The navigation lock is a critical piece of the infrastructure for river travel on the upper Columbia River and the Snake River.  The McNary navigation lock allows for passage of over 5 million tons of commodities on a yearly basis, raising transiting river traffic an average of 75 feet to Lake Wallula.  The navigation lock has been in service since 1954.

McNary has two pump rooms in the navigation lock (navlock), one at the downstream and one at the upstream ends of the navlock.  Each pump room is designed to handle both unwatering of the lock fill/empty culverts, and drainage from gallery leakage. The proposed project will replace one unwatering pump (approx. 50 HP,  1200 GPM) pump and three drainage pumps (approx. 7.5 HP, 250 GPM), along with re-routing inlet piping and outlet pumping (outlet pipe approx. 300 feet of 10-inch dia steel pipe).  Temporary Power and/or motor control centers maybe required for commissioning the new pumps. The project will also include an elevated structural floor (approx. 2 feet above existing concrete floor, and 250 square feet).  The pump room is located in the lower gallery of the NavLock , elev 241 (the top deck is at elev 361).  Access to the pump room is limited to a stairwell and vertical elevator shaft.  The freight elevator is not functional but the shaft can be used to lower supplies and materials.  Electrical controls and power to the pumps will be done by others and is not part of this contract

All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).

The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance.  In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1. 

A Site Safety and Health Officer (SSHO) employed by the prime contractor shall be required for each shift of the contractor’s on-site operations.  The SSHO shall possess a minimum of 5-years’ experience in construction safety on similar projects, shall have completed the 30-Hour OSHA Construction Safety training within the last 5-years, and shall have completed at least 24-hours of formal safety training each year for the past 5-years.

The Contractor will be responsible for establishing and managing an effective Contractor Quality Control (CQC) System that will require the development and submission of a comprehensive project specific CQC Plan for Government acceptance.  A CQC System Manager employed by the prime contractor shall be required to be on-site for each shift of the Contractor’s operations.  The CQC System Manager must possess a minimum of 5-years relevant experience in a supervisory or management position such as Quality Control Manager, Quality Assurance Manager, or Construction Manager directly involved in the management of construction quality at the project site.  In addition, the CQC System Manager shall have completed the course entitled “Construction Quality Management for Contractors” within the last 5-years.    

The Contractor will be required to use the Government-furnished Construction Contractor Module (referred to as QCS) of the Resident Management System (RMS) to record, maintain, and submit various information throughout the contract period.  QCS is a Windows-based program that can be run on a stand-alone personal computer or on a network.  The Government will make the QCS software available to the Contractor after contract award.

The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract.

Miscellaneous work within the project includes the delivery of As-Built Drawings.

Solicitation Number W912EF20B0017 will be posted to the beta.sam.gov in approximately on or around early July 2020. The solicitation is an Invitation for bid (IFB). Important Note:  The beta.sam.gov Contract Opportunities Response Date listed elsewhere in this synopsis is for beta.sam.gov archive purposes only.  It does not necessarily reflect the actual bid opening date.  There is no response date included in this notice. The bid due date and time will be contained in the solicitation and any solicitation amendments that are issued.

A site visit details are included in the solicitation and other instructions for attendee sign up to attend.  See solicitation for specific details about the site visit. ACCESS FOR FOREIGN NATIONALS: Security clearance for foreign nationals to attend a site visit requires approximately 4 weeks; therefore, clearance should be requested immediately.

To request clearance, please submit the names of all foreign nationals proposed for site visit attendance, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph (INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B). Send this information by email to leanne.r.walling@usace.army.mil.  Foreign nationals must have received clearance prior to being granted access to the project site.

Update #3 ·

8/17/2020:  Site visit Attendee list from 8/12/2020 added as an attachement.

___________________________________________________________________________

8/7/2020: Solcitation Amendment W912EF20B0017-0001  which provides additional site visit instruction/information. See attached W912EF20B0017-0001 for details. ___________________________________________________________________________

Construction project entitled: McNary Dam NavLock Upstream Unwater Sump System Upgrade

The work is located at the McNary Dam, Umatilla, Oregon.  This will be a firm fixed-price construction contract. Construction magnitude is estimated between $1,000,000 and $5,000,000.  100% performance and payment bonds will be required.  The North American Industry Classification System (NAICS) code for this project is 237990 and the associated small business size standard is $39.5 M. 

Competition for this solicitation is set-aside for small business concerns.  Solicitation number W912EF20B0017 is attached to this post with technical specifications and associated plans. The proposal due date is contained in the solicitation.

Scope of Work

McNary Lock and Dam (McNary) is located on the Columbia River, near the town of Umatilla, Oregon.  The navigation lock is a critical piece of the infrastructure for river travel on the upper Columbia River and the Snake River.  The McNary navigation lock allows for passage of over 5 million tons of commodities on a yearly basis, raising transiting river traffic an average of 75 feet to Lake Wallula.  The navigation lock has been in service since 1954.

McNary has two pump rooms in the navigation lock (navlock), one at the downstream and one at the upstream ends of the navlock.  Each pump room is designed to handle both unwatering of the lock fill/empty culverts, and drainage from gallery leakage. The proposed project will replace one unwatering pump (approx. 50 HP,  1200 GPM) pump and three drainage pumps (approx. 7.5 HP, 250 GPM), along with re-routing inlet piping and outlet pumping (outlet pipe approx. 300 feet of 10-inch dia steel pipe).  Temporary Power and/or motor control centers maybe required for commissioning the new pumps. The project will also include an elevated structural floor (approx. 2 feet above existing concrete floor, and 250 square feet).  The pump room is located in the lower gallery of the NavLock , elev 241 (the top deck is at elev 361).  Access to the pump room is limited to a stairwell and vertical elevator shaft.  The freight elevator is not functional but the shaft can be used to lower supplies and materials.  Electrical controls and power to the pumps will be done by others and is not part of this contract

All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).

The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance.  In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1. 

A Site Safety and Health Officer (SSHO) employed by the prime contractor shall be required for each shift of the contractor’s on-site operations.  The SSHO shall possess a minimum of 5-years’ experience in construction safety on similar projects, shall have completed the 30-Hour OSHA Construction Safety training within the last 5-years, and shall have completed at least 24-hours of formal safety training each year for the past 5-years.

The Contractor will be responsible for establishing and managing an effective Contractor Quality Control (CQC) System that will require the development and submission of a comprehensive project specific CQC Plan for Government acceptance.  A CQC System Manager employed by the prime contractor shall be required to be on-site for each shift of the Contractor’s operations.  The CQC System Manager must possess a minimum of 5-years relevant experience in a supervisory or management position such as Quality Control Manager, Quality Assurance Manager, or Construction Manager directly involved in the management of construction quality at the project site.  In addition, the CQC System Manager shall have completed the course entitled “Construction Quality Management for Contractors” within the last 5-years.    

The Contractor will be required to use the Government-furnished Construction Contractor Module (referred to as QCS) of the Resident Management System (RMS) to record, maintain, and submit various information throughout the contract period.  QCS is a Windows-based program that can be run on a stand-alone personal computer or on a network.  The Government will make the QCS software available to the Contractor after contract award.

The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract.

Miscellaneous work within the project includes the delivery of As-Built Drawings.

Solicitation Number W912EF20B0017 will be posted to the beta.sam.gov in approximately on or around early July 2020. The solicitation is an Invitation for bid (IFB). Important Note:  The beta.sam.gov Contract Opportunities Response Date listed elsewhere in this synopsis is for beta.sam.gov archive purposes only.  It does not necessarily reflect the actual bid opening date.  There is no response date included in this notice. The bid due date and time will be contained in the solicitation and any solicitation amendments that are issued.

A site visit details are included in the solicitation and other instructions for attendee sign up to attend.  See solicitation for specific details about the site visit. ACCESS FOR FOREIGN NATIONALS: Security clearance for foreign nationals to attend a site visit requires approximately 4 weeks; therefore, clearance should be requested immediately.

To request clearance, please submit the names of all foreign nationals proposed for site visit attendance, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph (INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B). Send this information by email to leanne.r.walling@usace.army.mil.  Foreign nationals must have received clearance prior to being granted access to the project site.

Update #2 ·

 8/7/2020: Solcitation Amendment W912EF20B0017-0001  which provides additional site visit instruction/information. See attached W912EF20B0017-0001 for details. ___________________________________________________________________________

Construction project entitled: McNary Dam NavLock Upstream Unwater Sump System Upgrade

The work is located at the McNary Dam, Umatilla, Oregon.  This will be a firm fixed-price construction contract. Construction magnitude is estimated between $1,000,000 and $5,000,000.  100% performance and payment bonds will be required.  The North American Industry Classification System (NAICS) code for this project is 237990 and the associated small business size standard is $39.5 M. 

Competition for this solicitation is set-aside for small business concerns.  Solicitation number W912EF20B0017 is attached to this post with technical specifications and associated plans. The proposal due date is contained in the solicitation.

Scope of Work

McNary Lock and Dam (McNary) is located on the Columbia River, near the town of Umatilla, Oregon.  The navigation lock is a critical piece of the infrastructure for river travel on the upper Columbia River and the Snake River.  The McNary navigation lock allows for passage of over 5 million tons of commodities on a yearly basis, raising transiting river traffic an average of 75 feet to Lake Wallula.  The navigation lock has been in service since 1954.

McNary has two pump rooms in the navigation lock (navlock), one at the downstream and one at the upstream ends of the navlock.  Each pump room is designed to handle both unwatering of the lock fill/empty culverts, and drainage from gallery leakage. The proposed project will replace one unwatering pump (approx. 50 HP,  1200 GPM) pump and three drainage pumps (approx. 7.5 HP, 250 GPM), along with re-routing inlet piping and outlet pumping (outlet pipe approx. 300 feet of 10-inch dia steel pipe).  Temporary Power and/or motor control centers maybe required for commissioning the new pumps. The project will also include an elevated structural floor (approx. 2 feet above existing concrete floor, and 250 square feet).  The pump room is located in the lower gallery of the NavLock , elev 241 (the top deck is at elev 361).  Access to the pump room is limited to a stairwell and vertical elevator shaft.  The freight elevator is not functional but the shaft can be used to lower supplies and materials.  Electrical controls and power to the pumps will be done by others and is not part of this contract

All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).

The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance.  In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1. 

A Site Safety and Health Officer (SSHO) employed by the prime contractor shall be required for each shift of the contractor’s on-site operations.  The SSHO shall possess a minimum of 5-years’ experience in construction safety on similar projects, shall have completed the 30-Hour OSHA Construction Safety training within the last 5-years, and shall have completed at least 24-hours of formal safety training each year for the past 5-years.

The Contractor will be responsible for establishing and managing an effective Contractor Quality Control (CQC) System that will require the development and submission of a comprehensive project specific CQC Plan for Government acceptance.  A CQC System Manager employed by the prime contractor shall be required to be on-site for each shift of the Contractor’s operations.  The CQC System Manager must possess a minimum of 5-years relevant experience in a supervisory or management position such as Quality Control Manager, Quality Assurance Manager, or Construction Manager directly involved in the management of construction quality at the project site.  In addition, the CQC System Manager shall have completed the course entitled “Construction Quality Management for Contractors” within the last 5-years.    

The Contractor will be required to use the Government-furnished Construction Contractor Module (referred to as QCS) of the Resident Management System (RMS) to record, maintain, and submit various information throughout the contract period.  QCS is a Windows-based program that can be run on a stand-alone personal computer or on a network.  The Government will make the QCS software available to the Contractor after contract award.

The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract.

Miscellaneous work within the project includes the delivery of As-Built Drawings.

Solicitation Number W912EF20B0017 will be posted to the beta.sam.gov in approximately on or around early July 2020. The solicitation is an Invitation for bid (IFB). Important Note:  The beta.sam.gov Contract Opportunities Response Date listed elsewhere in this synopsis is for beta.sam.gov archive purposes only.  It does not necessarily reflect the actual bid opening date.  There is no response date included in this notice. The bid due date and time will be contained in the solicitation and any solicitation amendments that are issued.

A site visit details are included in the solicitation and other instructions for attendee sign up to attend.  See solicitation for specific details about the site visit. ACCESS FOR FOREIGN NATIONALS: Security clearance for foreign nationals to attend a site visit requires approximately 4 weeks; therefore, clearance should be requested immediately.

To request clearance, please submit the names of all foreign nationals proposed for site visit attendance, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph (INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B). Send this information by email to leanne.r.walling@usace.army.mil.  Foreign nationals must have received clearance prior to being granted access to the project site.

Update #1 ·

Construction project entitled: McNary Dam NavLock Upstream Unwater Sump System Upgrade

The work is located at the McNary Dam, Umatilla, Oregon.  This will be a firm fixed-price construction contract. Construction magnitude is estimated between $1,000,000 and $5,000,000.  100% performance and payment bonds will be required.  The North American Industry Classification System (NAICS) code for this project is 237990 and the associated small business size standard is $39.5 M. 

Competition for this solicitation is set-aside for small business concerns.  Solicitation number W912EF20B0017 is attached to this post with technical specifications and associated plans. The proposal due date is contained in the solicitation.

Scope of Work

McNary Lock and Dam (McNary) is located on the Columbia River, near the town of Umatilla, Oregon.  The navigation lock is a critical piece of the infrastructure for river travel on the upper Columbia River and the Snake River.  The McNary navigation lock allows for passage of over 5 million tons of commodities on a yearly basis, raising transiting river traffic an average of 75 feet to Lake Wallula.  The navigation lock has been in service since 1954.

McNary has two pump rooms in the navigation lock (navlock), one at the downstream and one at the upstream ends of the navlock.  Each pump room is designed to handle both unwatering of the lock fill/empty culverts, and drainage from gallery leakage. The proposed project will replace one unwatering pump (approx. 50 HP,  1200 GPM) pump and three drainage pumps (approx. 7.5 HP, 250 GPM), along with re-routing inlet piping and outlet pumping (outlet pipe approx. 300 feet of 10-inch dia steel pipe).  Temporary Power and/or motor control centers maybe required for commissioning the new pumps. The project will also include an elevated structural floor (approx. 2 feet above existing concrete floor, and 250 square feet).  The pump room is located in the lower gallery of the NavLock , elev 241 (the top deck is at elev 361).  Access to the pump room is limited to a stairwell and vertical elevator shaft.  The freight elevator is not functional but the shaft can be used to lower supplies and materials.  Electrical controls and power to the pumps will be done by others and is not part of this contract

All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).

The Contractor will be responsible for establishing and managing an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance.  In addition, the Contractor will be required to develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1. 

A Site Safety and Health Officer (SSHO) employed by the prime contractor shall be required for each shift of the contractor’s on-site operations.  The SSHO shall possess a minimum of 5-years’ experience in construction safety on similar projects, shall have completed the 30-Hour OSHA Construction Safety training within the last 5-years, and shall have completed at least 24-hours of formal safety training each year for the past 5-years.

The Contractor will be responsible for establishing and managing an effective Contractor Quality Control (CQC) System that will require the development and submission of a comprehensive project specific CQC Plan for Government acceptance.  A CQC System Manager employed by the prime contractor shall be required to be on-site for each shift of the Contractor’s operations.  The CQC System Manager must possess a minimum of 5-years relevant experience in a supervisory or management position such as Quality Control Manager, Quality Assurance Manager, or Construction Manager directly involved in the management of construction quality at the project site.  In addition, the CQC System Manager shall have completed the course entitled “Construction Quality Management for Contractors” within the last 5-years.    

The Contractor will be required to use the Government-furnished Construction Contractor Module (referred to as QCS) of the Resident Management System (RMS) to record, maintain, and submit various information throughout the contract period.  QCS is a Windows-based program that can be run on a stand-alone personal computer or on a network.  The Government will make the QCS software available to the Contractor after contract award.

The project will involve the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract.

Miscellaneous work within the project includes the delivery of As-Built Drawings.

Solicitation Number W912EF20B0017 will be posted to the beta.sam.gov in approximately on or around early July 2020. The solicitation is an Invitation for bid (IFB). Important Note:  The beta.sam.gov Contract Opportunities Response Date listed elsewhere in this synopsis is for beta.sam.gov archive purposes only.  It does not necessarily reflect the actual bid opening date.  There is no response date included in this notice. The bid due date and time will be contained in the solicitation and any solicitation amendments that are issued.

A site visit details are included in the solicitation and other instructions for attendee sign up to attend.  See solicitation for specific details about the site visit. ACCESS FOR FOREIGN NATIONALS: Security clearance for foreign nationals to attend a site visit requires approximately 4 weeks; therefore, clearance should be requested immediately.

To request clearance, please submit the names of all foreign nationals proposed for site visit attendance, along with documentation to verify that he/she was legally admitted into the United States and has authority to work and/or go to school in the US. Such documentation may include a US passport, Certificate of US citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), foreign passport with I-551 stamp or attached INS Form I-94 indicating employment authorization, Alien Registration Receipt Card with photograph (INS Form I-151 or I-551), Temporary Resident Card (INS Form I-688), Employment Authorization Card (INS Form I-688A), Reentry Permit (INS Form I-327), Refugee Travel Document (INS Form I-571), Employment Authorization Document issued by the INS which contains a photograph (INS Form I-688B). Send this information by email to leanne.r.walling@usace.army.mil.  Foreign nationals must have received clearance prior to being granted access to the project site.

Files

Notice history

Notice Type Posted
McNary Dam NavLock Upstream Unwater Sump System Upgrade Award Award Notice
This notice Latest solicitation Solicitation
McNary Dam NavLock Upstream Unwater Sump System Upgrade Pre-Solicitation
McNary Dam NavLock Upstream Unwater Sump System Upgrade Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
John day DAM navigation lock tainter valve (TV) repairs TV3 and TV4 Location and Access Details. Oregon Side Physical Access, Near Rufus, OR 97050 accessible via I-84, Exit 109. Washington Side (Closest Town), Goldendale, WA 98620 approximately 20 miles north across the river. River Location, Mile 216.6 on the Columbia River, joining Sherman County, Oregon, and Klickitat County, Washington. 98628 · NAICS 237990 ENDIST Portland No set-aside
John day DAM unit 10 packing box replacement John Day Dam, Sherman County, Oregonthe John Day Dam On The Columbia River Between Sherman County, Oregon, And Klickitat County, Washington. Rufus, Oregon 97050, United States · NAICS 237990 ENDIST Portland No set-aside
Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement Cascade Locks, Oregon 97014, United States · NAICS 237310 ENDIST Portland Total Small Business
TDA Isolated Phase Bus and Duct Inspection The Dalles Dam in The Dalles, Oregon. Access to The Dalles Dam is from I-84 Exit 88 97058 · NAICS 541380 ENDIST Portland No set-aside
Water-Filled Coffer Dam NAICS 339999 ENDIST St Paul Total Small Business