20B0017_MNA NL US Unwater Sump System Upgrade_Site Visit Attendance a.pdf
PDF 170 KB Posted
- Solicitation number
- W912EF20B0017
About this file
This document includes a site visit attendance file and related federal contract opportunity for the McNary Dam NavLock Upstream Unwater Sump System Upgrade project. The site visit file provides logistical details for a mandatory site visit, including group times and attendee lists. The federal contract opportunity is a solicitation seeking a construction contractor to replace pumps, piping, and install a structural floor at the pump room located in the lower gallery of the NavLock. Key requirements include performance and payment bonds, a safety plan adhering to EM 385-1-1, and a quality control plan. The contractor must also use the government's QCS system to record and submit project information. The estimated contract value is between $1,000,000 to $5,000,000. The solicitation number is W912EF20B0017 and will be posted to beta.sam.gov in early July 2020. The opportunity is set aside for small businesses and is being conducted by the Department of the Army Corps of Engineers Walla Walla District.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MNA NL Upstream Unwater Sump System Upgrade
Start Time 12-Aug
8:00 AM Group 1
9:00 AM Group 2
10:00 AM Group 3
1:00 PM Group 4 (if needed)
2:00 PM Group 5 (if needed)
3:00 PM Group 6 (If needed)
Site Visit Guidelines
Attendee Name Company P
Evan Gross Northbank John Lee �� f ocngineering
Seth Wilson Apex Mechanical John Muonio Apex Mechanical Ron Salas Garney Federal
Ian Ferguson
Saul Kolb
AmericanMine
Lacy Mechanical
Darion Weber BCI Matt Heber-t Coffman Engineering Zach Martin DuwamishServices
Montgomery POW Contracting Billy Caroll Gracon LLC Brian Peterson TML Construction
Chris Clemens Hamilton SW Tom Clemens Hamilton SW
A RSVP Cut-off date of 11 Aug 2020 at 5:00pm will be included via amendment to allow team to ensure enough Gov. staff is present to support
Limit attendees to 2 people per Contractor team
Appropriate masks will be required at all times while on site.
Start times will be as.signed and are staggered starting at 8:00 am. Length of site visit is estimated to be 1 hour
US Citizen y y y y y y y y y y y y y y y
Access to the U/S Sump room is down approximately 100 vertical feet o( stairs, There is no elevator access. This site visit will be physlcally demanding, Gov. staff will read the script I Description of the project}
No questions will be answered during site visit
Completion and submission of the CDC Active Screening Questionairre be each attendee prior to travel is required.
The groups will then be escorted along a pre-determined path throughout the Navigation Lock.
Email assigned time
Yes Yes
Yes Yes Yes
Yes
Yes
Yes Yes Yes
Yes Yes Yes
Yes Yes
7z:ut J2L
_c.----� fW;;J�
_;, h n·5 C/e,'V\, !;Y'
:;z�' 'o<1
The Government will not be answering any questions during the walkthrough. Potential offerers will be allowed to take equipment specific pictures and measurements of equipment that is along the pre-determined pathway only.
Once site visit is complete, contractor attendees will be escorted back to the Visitor Center and the site visit walkthrough is complete.
To ensure consistent information is shared among all potential offerers, all questions must be submitted through the ProjNet bidder inquiry process outlined in the solicitation.