McNary Dam NavLock Upstream Unwater Sump System Upgrade
Solicitation number
W912EF20B0017
Issued by

About this file

This document includes a site visit attendance file and related federal contract opportunity for the McNary Dam NavLock Upstream Unwater Sump System Upgrade project. The site visit file provides logistical details for a mandatory site visit, including group times and attendee lists. The federal contract opportunity is a solicitation seeking a construction contractor to replace pumps, piping, and install a structural floor at the pump room located in the lower gallery of the NavLock. Key requirements include performance and payment bonds, a safety plan adhering to EM 385-1-1, and a quality control plan. The contractor must also use the government's QCS system to record and submit project information. The estimated contract value is between $1,000,000 to $5,000,000. The solicitation number is W912EF20B0017 and will be posted to beta.sam.gov in early July 2020. The opportunity is set aside for small businesses and is being conducted by the Department of the Army Corps of Engineers Walla Walla District.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MNA NL Upstream Unwater Sump System Upgrade

Start Time 12-Aug

8:00 AM Group 1

9:00 AM Group 2

10:00 AM Group 3

1:00 PM Group 4 (if needed)

2:00 PM Group 5 (if needed)

3:00 PM Group 6 (If needed)

Site Visit Guidelines

Attendee Name Company P

Evan Gross Northbank John Lee �� f ocngineering

Seth Wilson Apex Mechanical John Muonio Apex Mechanical Ron Salas Garney Federal

Ian Ferguson

Saul Kolb

AmericanMine

Lacy Mechanical

Darion Weber BCI Matt Heber-t Coffman Engineering Zach Martin DuwamishServices

Montgomery POW Contracting Billy Caroll Gracon LLC Brian Peterson TML Construction

Chris Clemens Hamilton SW Tom Clemens Hamilton SW

A RSVP Cut-off date of 11 Aug 2020 at 5:00pm will be included via amendment to allow team to ensure enough Gov. staff is present to support

Limit attendees to 2 people per Contractor team

Appropriate masks will be required at all times while on site.

Start times will be as.signed and are staggered starting at 8:00 am. Length of site visit is estimated to be 1 hour

US Citizen y y y y y y y y y y y y y y y

Access to the U/S Sump room is down approximately 100 vertical feet o( stairs, There is no elevator access. This site visit will be physlcally demanding, Gov. staff will read the script I Description of the project}

No questions will be answered during site visit

Completion and submission of the CDC Active Screening Questionairre be each attendee prior to travel is required.

The groups will then be escorted along a pre-determined path throughout the Navigation Lock.

Email assigned time

Yes Yes

Yes Yes Yes

Yes

Yes

Yes Yes Yes

Yes Yes Yes

Yes Yes

7z:ut J2L

_c.----� fW;;J�

_;, h n·5 C/e,'V\, !;Y'

:;z�' 'o<1

The Government will not be answering any questions during the walkthrough. Potential offerers will be allowed to take equipment specific pictures and measurements of equipment that is along the pre-determined pathway only.

Once site visit is complete, contractor attendees will be escorted back to the Visitor Center and the site visit walkthrough is complete.

To ensure consistent information is shared among all potential offerers, all questions must be submitted through the ProjNet bidder inquiry process outlined in the solicitation.